| Position wanted: |
Planning / Project Engineer |
| Job category: |
AdministrativeConstructionEngineeringManagement/ManagerManufacturing |
| Objective and Resume Summary: |
|
To get a job of "Planning / Project Engineer". Presently I am working in Algeria in a LNG Train project with KBR Group. Before that I worked in a EPC project in Qatar for 2 years. I worked in Saudi arabia 2 years in a Manufacturing company. I am servicing as a Planning Engineer. I worked in Bangladesh in a Textile mill and in a Cold rolling mill too.
I am very expert in Primavera scheduling with P3. And well conversent with Microsoft office programs. |
| Skills: |
Planning/Scheduling with P3 (with resource loading),
Project management. |
| Known languages (and levels): |
English-Very GoodHindi-Very GoodOther: Bengali
|
| Type of Employment wanted: |
Full Time
|
| Minimum Yearly Salary in Numbers: |
36000 USD
|
| Current Location: |
Bangladesh, Chittagong |
| Education History, Qualifications & other additional information: |
| Level of Education: |
Bachelor
|
Academic qualifications
Degree Group / Discipline Year Division / Class Marks/ CGPA Obtained Board/ University
S.S.C Science 1994 1st Division 817 Comilla, BD
H.S.C Science 1996 1st Division 699 Chittagong, BD
B. Sc. Engg. Mechanical 1999-2000
(exam held in 2003) 1st Class 3.63 (out of 4) (**2nd position in order of merit) CUET (Chittagong University of Engineering & Technology)
Computer skills
Course Application Programs Remarks
Office Management Microsoft Office (MS word, MS excel, MS power point), DOS, Windows for FoxPro Practical Hands-on experience on office jobs.
Project Planning Software Primavera (Ver. 3.1), MS Project. Practical Hands-on experience on Project Scheduling with Primavera.
Database Administrator Oracle 8i (with Developer 6i)
Drawing Auto CAD,
Training programs
I have accomplished ISO 9001 : 2000 Internal Quality Auditor Training program held in Inma Steel Fabricators Co., Ltd. Jubail, Saudi Arabia conducted by ABS Group, Inc Middle East.
I have completed an intensive Industrial Training Program of fourteen days (18th March to 31st March, 2003) in ¡§General Electric Manufacturing (GEM) Co. Ltd.¡¨ in Chittagong, Bangladesh.
|
| Work History & Experience: |
| Years of Work Experience: |
5 to 7 Years |
Experience
A. I have joined as a Planning Engineer in Dodsal Engineering & Construction Fze. Algeria from September 29th, 2009 & serving till to date.
I am working for the project of MEI 1 New LNG Train Skikda, Algeria. Owner of this project is Sonatrach & Our client is Kellog Brown & Root Int’l Inc, Houston, USA. Our scope of work is “Mechanical, Electrical & Instrumentation Installation for New LNG Train and Fractionation Unit.
B. I had worked as a Planning Engineer in dodsal engineering & construction pte ltd. Qatar from September 22th, 2007 to September 27th, 2009.
I am working in Ras laffan industrial city in Common Cooling Seawater Phase II project for Qatar power, Ras Gas & Qatar Gas. Our main purpose is to prepare the pipeline distribution system to supply Cooling Water from the sea to Qatar Power, Ras Gas & Qatar Gas industry and also discharge the same from the industry to the sea. All the intake area, pump house preparation, pipeline construction, discharge channel construction etc is in our scope.
Our Major Client: Qatar Petroleum.
My present major responsibilities are:
A) Schedule Preparation: Preparing & Updating Schedule (With/Without Resource allocation) for different projects with Primavera (P3.1).
- This includes S ¡V curve (Plan Vs. Actual % Progress) preparation;
- Manpower Histogram Category wise etc.
B) Daily Piping Report: Consist of Lamination Joints & Pipe line erection Status for Different diameters Pipe lines (Area wise & Milestone wise). Hydro-testing Reports for Pipelines (Area wise & Milestone wise). Small Bore Piping Status Area wise.
C) Weekly Management Meeting Presentation: Preparation of Weekly Management Meeting Presentation with PowerPoint.
D) Weekly Target: Preparation of Weekly target for Site works Discipline wise (Civil, Mechanical, Electrical, Instrumentation and Telecom).
E) Balance Piping Works Schedule: Work Schedule & Hydro testing for the Balance piping works daily updating & Reporting to Client.
F) Organization Charts: Preparation of Organization Charts for Different projects.
„« Extra Works for Contracts Department: Preparation of Insurance Claim Reports with Technical & Commercial package.
- First Assignment ¡V Preparation of Insurance Claim Regarding Damage of Pipe Line Works Due to Fire¡V Worth 10 Million USD (Including Cost Estimate for the Damage and Reconstruction, Material Take off for Damaged Line ¡V Assessment, Material Take off for Re-construction Line, Commercial Cost of Repair, Additional Material Cost Estimates Backup etc.)
My previous work responsibilities were:
A) Daily progress report: Consists of Daily concrete work area wise, Daily Pipe sleepers¡¦ quantity record, Equipments installation status, Electrical, Instrumentation & Telecom cable pulling, glanding/termination status, Quantity tracking sheets etc.
B) Pipe Sleepers master list updating: Consists of Total quantity of pipe sleepers required for the total project and daily completion status.
C) Weekly Manpower Distribution Area wise: Total direct manpower allocated area wise including subcontractor manpower.
D) Weekly Meeting report & presentation: Minutes of meeting report for weekly management meetings. Also, power point presentation for the key points.
E) Weekly Site Progress Picture: Taking Site progress pictures for Weekly reports, Incident reports etc.
C. I had worked as a Planning Engineer in Inma Steel Fabricators Co. Ltd. KSA on September 10th, 2005 & served up to August 31st, 2007. Inma Steel is a Fabrication Industry manufacturing Pressure Vessel, Heat Exchanger, Columns, Towers, Reactors, Heavy Steel Structure, Piping etc. As per relevant Codes such as ASME Sec. 8 Div. I & Div. II, TEMA & RCB, API 650, ANSI / ASME B 31.1, 31.2, 31.3 etc. And conversant with various process of welding like GTAW, SMAW, FCAW, SAW & Plasma Cutting. The mentioned product are manufactured with various grade of steel such as SA 516 Gr. 70, 60, 65, SA 515 Gr. 70, 65, SA105, SA106 Gr. B & SA 240 Type 304, 304L, 316, 316L, 321 etc. The above products are manufactured for Refinery, Fertilizer, Chemical, Petrochemical & Thermal Power Plant etc.
Our Major Clients: Saudi Aramco, Snamprogetti, SNC-Lavalin, JGC, Bechtel-Technip, Technicas etc.
I have worked there as a planning engineer in its planning department for 2 years. During my working period I have done the following activities:
A) Preparing Spare Parts Data Package.
B) Preparing of Fabrication Checklist for Production Monitoring.
C) Preparing & Updating Daily Progress & Manpower Mobilization Report.
D) Preparing & Updating Weekly Progress Report for Client including percentage progress status, updated bar chart look ahead schedule & S-curve for plan vs. Actual curves.
E) Preparing & Updating Weekly Percent Progress & Manpower report for Cost Control Department.
F) Preparing & Updating Master Document List (Design & Estimation Engineering, Quality Control Dept., Planning Department & Miscellaneous Documents) for Internal Distribution & Submission to Client.
G) Preparing & Updating Fabrication Schedule with P3 software, which includes Preliminary Bidding Schedule, Detail Manufacturing Schedule (level - 4), 15 days look ahead schedule.
H) Preparing & Updating Monthly Progress reports for the clients. This includes Documents status, Modification/Hold activities, Pending documents from Vendor/Client status and other relevant issues for the Design/Engineering, QA/QC, Production & Planning Departments.
I) Preparing Minutes of Meeting Reports.
J) Updating Material Sub-order Status as per Material Status report from Procurement Department.
K) Preparing & Tracking Records for Invoice Status Report for Finance Department (For tracking LD status project wise).
L) Preparing & Updating Master Delivery Status reports for Saudi Aramco Projects.
M) Preparing & Updating Revenue Road Map for Running & Upcoming Projects for Head office presentation to Owner.
Inspite of all these activities I have participated in Internal Auditing Programs as an internal auditor and taken audit and prepared audit report on ¡§Contracts Department¡¨.
Also I have to communicate with client¡¦s expeditors regarding Progress status, Manpower status, Pictures for production progress, Shop layout etc.
D. I had worked in ¡§KYCR Coil Industries Ltd¡¨, Bangladesh at November 01, 2004 and worked as an Assistant Engineer (Planning & Operation) until September 01, 2005. The main business of this company is to produce Cold rolled coils & sheets.
My main objective was to operate the 6 Hi HS-CVC Cold rolling mills (POR, ETR & DTR).
- Daily progress reporting for production: Reporting of Total nos of HR coils rolls (Code No. Wise). Weight of the Cold rolled coil. Weight of Scrap (if any).
- Maintenance of Seller: Reporting and maintaining proper coolant supply at seller reservoir, Temperature monitoring etc.
- Density of Coolant: Periodic Checking of Coolant density and adding coolant with the help of coolant pump (when required).
E. I had worked in ¡§Sunman Textile Mills Ltd.¡¨, Bangladesh From January 01, 2004 to October 31, 2004 as a Engineer (Mechanical Maintenance). I had worked as a maintenance engineer in this composite textile mill. I worked in its maintenance section of Spinning, Dying and Weaving mills.
- Reporting for maintenance works to Supervisors.
- Supervision of Periodic Maintenance Works.
- Maintenance Meeting Report Preparation.
- Worked for a Stenter machine (Including a Boiler and its accessories, Chimney, Pumps etc) installation in Dying mill.
- Piping works for the Steam flow from Boiler to the machine.
|
|
|
|