|
|
|
|
|
|
 |
Search jobs by location:
Austria, Belgium, China, Malaysia, Mexico, Netherlands, Qatar, Saudi Arabia, Singapore, Thailand...More locations »
Search jobs by category:
Accounting, Administrative, Advertising, Architecture, Banking, Beauty/Cosmetics, Biotech, Computer, Construction, Customer Service, Design/Multimedia, Education, Engineering, Information Technology, Sales...More categories »
|
|
|
|
|
|
|
|
| Position wanted: |
Industrial Engineering |
| Job category: |
AnimationConstructionEngineeringEntertainmentHotel IndustryLanguage/MultilingualManufacturingMechanicsSalesTourism |
| Preferred Location: |
Canada |
| Objective and Resume Summary: |
|
Being a professional worker in a successful corporation where I can develop based on my experience, skills and job performance. Using the knowledge that I learned till now.
|
| Skills: |
Engineering, Sales, Animation, Multilingual, work with people, computers |
| Known languages (and levels): |
English-Very GoodFrench-A littleGerman-A littleSpanish-Very GoodOther: Italian Good level of the language
|
| Type of Employment wanted: |
Part Time
|
| Minimum Yearly Salary in Numbers: |
20000 USD
|
| Current Location: |
Mexico, Mexico City |
| Education History, Qualifications & other additional information: |
| Level of Education: |
College
|
EDUCATION
2002 – 2007 Universidad Tecnológica de México México, D.F.
Industrial and System Engineering Graduated.
I made the TOEIC test on 24-July-08. I got 745 Points on it.
|
| Work History & Experience: |
| Years of Work Experience: |
3 to 5 Years |
Servicios Hoteleros En Administracion Del Caribe S.A. DE C.V.
Animation Staff (Sport team).
Working between Feb-08 to May-08.
• Working as a watersports instructor teaching and giving tours to the guest of the hotel.
• Helping the animation team with the activities for the guest. Participating in the night shows making several performances on it. Giving dancing lessons and helping to organize the activities with the guests.
RODAMEX S.A. DE C.V.
Project Engineering Junior
Working between Sep-06 to Jan-08
• Responsable of the department of Project Engineering. Making maintenance programs, production methods of control, manuals of quality and introduction programs for new workers.
• Analysis for choose the best option for changing the address of the company Rodagoma S.A. De C.V. Design the lay – out for the factory in the new address and putting in march the productive area.
• In charge of making documentation for store the area (work instructions, methods, procedures, personnel evaluations, position descriptions and flow charts), which(who) served as base to execute the ISO norm 9000 in the area.
Coffee Corporate Service S.A. DE C.V.
Chief of Store
Working between Ago-05 to Sep-06
• In charge of the the general store which supplies inputs to 15 restaurants and cafeterias.
• I create the Articles Control System with which we can traced the different products from supplier up to shop.
BICICLO S.A. DE C.V.
Call Center Analyst
Working between Sep-04 to Ago-05
• I was part of the qualified system of attention and service where there was offering direct attention to clients requisitions by 01 800 line.
CafÉ Finca Santa Veracruz S.A. DE C.V.
Chief of Floor Area
Working between Jan-03 to Jul-04
• I create a system for the delegation of responsibilities, with which the productivity of the restaurant was improved increasing the sales in 10 %.
|
|
|
|
| Jobseekers:73408 |
Resumes:68168 |
Employers:8028 |
Jobs:19563 |
|