|
|
|
|
|
|
 |
Search jobs by location:
Austria, Belgium, China, Malaysia, Mexico, Netherlands, Qatar, Saudi Arabia, Singapore, Thailand...More locations »
Search jobs by category:
Accounting, Administrative, Advertising, Architecture, Banking, Beauty/Cosmetics, Biotech, Computer, Construction, Customer Service, Design/Multimedia, Education, Engineering, Information Technology, Sales...More categories »
|
|
|
|
|
|
|
|
| Position wanted: |
Site Manager |
| Job category: |
ArchitectureConstructionEngineering |
| Preferred Location: |
Cyprus |
| Preferred City-State/County: |
Nicosia |
| Objective and Resume Summary: |
|
Computer Skills:
Ms Office, Word, Excel, Power Point
Adobe Acrobat, Internet Explorer,
Adobe Photoshop 6.0, 7.0, 8.0, CS 2, Adobe Image Ready,
AutoCAD 98, 2000, 2001, 2004, 2005, 2006, 2007
3D Max, C+, Panorama Maker, Win XP, Corel 1.4,
MS DOS, Dos clips all programs, Landscape Designing,
Microsoft Manager, Primavera.
Strengths And Skills:
Problem solving, analytical thinking, strong persuasion, interpersonal and
Communication skills, creativity, working under stress, adaptability
Certificates:
- World Puzzle Champion ship participator certificate.
- Isolation materials profession seminars participator certificate.
Languages:
English Advanced and Fluent Speaking
Interests:
Photography, Archeology, Swimming, Professional model making, Driving,
Chess, Aquarium, Table Tennis, Paragliding.
|
| Skills: |
Site Manager, Architect, Nicosia |
| Known languages (and levels): |
English-Very GoodOther: Turkish
|
| Type of Employment wanted: |
Full Time
|
| Minimum Yearly Salary in Numbers: |
60000 Euro
|
| Current Location: |
Cyprus, Nicosia |
| Education History, Qualifications & other additional information: |
| Level of Education: |
Bachelor
|
1999-2004 Middle East Technical University (ODTÜ)
Department of Architecture
1998-1999 METU Department of Basic English
1991-1998 20 Temmuz Science High School
|
| Work History & Experience: |
| Years of Work Experience: |
3 to 5 Years |
2006-2007 GÜRDAĞ Çakıl İşletmeleri Ltd.
• I was site manager at the construction site. I was choosing the workers, material that we use, I was organizing the time schedule and workman’s working areas, control the workmanship and bring the job to a conclusion.
• During my job, I have orginezed the whole factory from construction to the end of installing machines.
2005-2006 ARMACON Properties Design & Construction Ltd.
• I was site manager at the construction site. I was choosing the workers, material that we use, I was organizing the time schedule and workman’s working areas, control the workmanship and bring the job to a conclusion.
• During the construction, I have five different sites which I was controlling. At the end of seven months period, I finalize three of them totally, three villa from one of the nine villas site, and concrete works of the last site.
2004-2005 Ahmet Özerman Ltd. / Aslan Boya
• I was Project Manager, I was organizing all project, construction and marketing process.
• During the design process I designed the villas, apartments and factories, drew the architectural projects, follow the approval process, and then start construction with approved project.
• In construction site, I was choosing the workers, materials that we used, organized the time schedule and workman’s working areas, control the workmanship and bring the job to conclusion.
• As a result, I was organized the marketing. After first meetings, I was direct dialogue with costumers and give the information about the details from the beginning of project to the end of the construction. After giving all the information, I was explaining why they should choose our buildings, persuade them and prepare the contracts and signing.
• That was a very good experience for me to work with this company because I have seen all the process from the beginning to the end and been attaching and working actively developed my experience.
• As a part of my job I have designed a fair stands, showroom, web page, brochures and many advertisement pages for company.
2003 Tepe İnşaat
• Worked as an assistant architect at the architectural office.
• Made the technical drawings of the Kremlin Palace and Golf Resort Hotel projects.
• used the AutoCAD Architectural Desktop 2, Adobe Photoshop 6 programs.
2002 Tepe İnşaat
• Worked as an assistant at the construction site of the ODC Center at Balgat.
2001 Construction Summer Practice, Niğde
• constructed a small building with traditional construction techniques.
• Topography summer practice, Ankara
• made a topographic study at the METU campus.
|
|
|
|
| Jobseekers:73243 |
CVs:68506 |
Employers:8277 |
Jobs:19378 |
|