|
|
| Position wanted: |
Field Engineer |
| Job category: |
Construction |
| Preferred Location: |
Brunei |
| Preferred City-State/County: |
Bandar Seri Begawan |
| Objective and Resume Summary: |
|
11 (eleven) years working experience as Mechanical (Rotating/Static), Piping & Structural Engineer for several various project;
• EPC Oil & Gas
- Jambi Merang Development Gas Production Facilities (Palembang – South Sumatera).
• EPC Oil & Gas
- North Belut CPP Project (Engineering & Procurement).
• EPC Power Plan
- Muara Tawar Project Combine Cycle Power Plan 225 MW
(Engineering, Procurement & Construction)
Pulp Mill Project (Fabrication, Assembly & Installation)
- Recovery Boiler.
- Water Intake & Water Treatment Plan.
- Pulp Dryer.
- Evaporator Plan.
- Waste Water Treatment Plan.
- Re-caustic Plan.
- Digester Plan.
Boiler (Fire Tube/Water Tube) & Pressure Vessel Manufacture
Power Plant Project (Overseas Project/Saudi Arabia) (Fabrication, Assembly & Installation)
- Power Plan Project (Gas Turbine 8 x 50 MW)
- Power Plan Project (Gas Turbine 2 x 85 MW)
- Power Block (Steam Turbine) 3 x 375 MW
Maintenance Works (Fabrication, Assembly & Installation)
- Recovery Boiler (Pulp Mill).
- Wood Handling/Conveyor (Pulp Mill).
- Debarking Drums (Pulp Mill)
|
| Skills: |
Field Mechanical Engineer |
| Known languages (and levels): |
English-GoodArabic-A little
|
| Type of Employment wanted: |
Contract
|
| Minimum Yearly Salary in Numbers: |
4500 USD
|
| Current Location: |
Indonesia, Jakarta |
| Education History, Qualifications & other additional information: |
| Level of Education: |
Bachelor
|
1997 Years Graduated Bachelor Degree from Institute Technology Medan (itm),
North Sumatera- Indonesia Majoring in Mechanical Engineering
|
| Work History & Experience: |
| Years of Work Experience: |
10 to 15 Years |
July, 2008 – Present TRIPATRA Engineers & Constructor
Occupation Area Coordinator
Project Jambi Merang Development Gas Production Facilities
Client JOB (Pertamina – HESS)
Responsibility - Supports the construction manager in the definition of the execution strategy.
- Co-ordinates all interdisciplinary field works on a site, supervising the various disciplines/categories
Of construction and assembly work.
- Co-ordinates General and Detail Programs for work carried out directly and works handled by subcontractors,
Solving contingent problems on site and optimizing the use of materials, work teams and available equipment.
- Solves co-ordination, priority and interface problems between the different work categories, in compliance with
The wider interest of whole site.
- Monitor Area Superintendents to ensure their correct supervision of subcontracted works, material orders
And specialist suppliers services in compliance with established program, progress and costs objectives,
As part of a wider objective to optimize manpower.
- Monitors Area Superintendents to ensure the correct implementation of construction activities in compliance
With quality standards and requirements.
- Assists the Site Project Control Engineer with the preparation of periodical reports, and supervises
The correct implementation of procedures designed to collect work performance control data.
- Ensures the observance of security regulations in force on the site.
- Interfaces the Client with regards to technical aspects which lie within his province.
Jan, 2008 – June 2008 Technip Indonesia (epc Oil & Gas Company)
Occupation Sr. Mechanical Engineer (Rotating Equipment)
Project North Belut CPP
Client Conoco Phillips
Responsibility - Report to lead engineer for status the assign task.
- Front End Engineering Design.
- Preparation concept detail engineering for rotating equipment as per client requirements.
- Provided documentation rotating equipment data as per client requirements.
- Ensure completeness and full compliance of the deliverables with the contractual specification.
- Reviewing supplier/vendor document as per Supplier Document Register List.
Sept, 2007 – Dec 2007 ALSTOM Power Asia Pacific Sdn Bhd (EPC Power Plan Company)
Occupation Construction Engineer
Project Muara Tawar 225 MW Combine Cycle Power Plan – Jakarta
Client Perusahaan Listrik Negara (PLN)
Responsibility - Report to Lead Engineer the status of assigned task.
- Provide information to prepare the engineering progress upon request by LE.
- Ensure completeness and full compliance of the deliverables with the contractual specification.
- Analyze client comments and elaborate comprehensive answer.
- Consolidate, prepare and verify materials and transportation bill of quantities (BoQ) for erection
Erection subcontract. Continuous monitoring of evolution of quantities and
Consequences (resource, schedule, cost).
- Piping prefabrication and supply activity in workshop, support to site for piping prefabrication
If done at site. Continuous monitoring of the evolution of bulk material for piping, hangers and
Valves.
- Maintaining, updating a reliable database for tendering and progress calculation.
- Preparation of documentation for erection works and verification of standard documentation
Prepared by Participant and partners – erection procedure, erection files, inspection and
Test File.
- Preparation of Hydrostatic Test Proposals for Piping Systems.
Jan, 2007 – July 2007 Pt Truba Jurong Engineering – Jakarta (J.V company between Jurong Engineering Ltd, Singapore and Tri Usaha Bakti)
Occupation Mechanical Engineer (Rotating/Static Equipments, Piping & Steel Structural Works)
Job Location Riau Andalan Pulp & Paper – Pkl. Kerinci, Riau
Client PEC – Tech Indonesia / ANDRITZ
Responsibility - Preparation & maintain updating schedule for fabrication & installation works.
- Reviewing design engineering, technical specification and drawing before construction.
- Monitoring progress installation works versus manpower resource & tools.
- Maintaining procedure of installation base on ASME, ASTM, ANSI, API and JIS Standard.
- Maintaining quality management base on ISO 9001-2000, 14001
- Monitoring procedure of safety during construction base on OSHAS 18001
- Involve and solve problem if any technical problem during construction at site.
- Up dating progress report, weekly report & monthly report to Area Manager & Client.
- Arranging requisition materials for fabrication & installation related time schedule & drawing.
July, 2005 – Feb, 2006 Truba Arabia (j.V company between Jurong Engineering Ltd, Singapore and BEMCO Contracting Co, Saudi Arabia)
Occupation Piping Engineer (High Pressure, Medium & Low Pressure Piping Works)
Job Location Shoaiba Power Plant - Saudi Arabia
Client ALSTOM Power Centrals
Responsibility - Preparation & maintain updating schedule for fabrication & installation works.
- Reviewing design engineering, technical specification and drawing before construction.
- Monitoring progress installation works versus manpower resource & tools.
- Maintaining procedure of installation base on ASME, ASTM, ANSI, API and JIS Standard.
- Maintaining quality management base on ISO 9001-2000, 14001
- Monitoring procedure of safety during construction base on OSHAS 18001
- Involve and solve problem if any technical problem during construction at site.
- Up dating progress report, weekly report & monthly report to Area Manager & Client.
- Arranging requisition materials for fabrication & installation related time schedule & drawing.
March, 2005 – July, 2005 Truba Arabia (j.V company between Jurong Engineering Ltd, Singapore and BEMCO Contracting Co, Saudi Arabia)
Occupation Mechanical Coordinator (Rotating/Static Equipments, Balance of Plan & Piping Works)
Job Location Riyadh Power Plant # 7 - Saudi Arabia
Client SIEMENS Westing House
Responsibility - Preparation & maintain updating schedule for fabrication & installation works.
- Reviewing design engineering, technical specification and drawing before construction.
- Monitoring progress installation works versus manpower resource & tools.
- Maintaining procedure of installation base on ASME, ASTM, ANSI, API and JIS Standard.
- Maintaining quality management base on ISO 9001-2000, 14001
- Monitoring procedure of safety during construction base on OSHAS 18001
- Involve and solve problem if any technical problem during construction at site.
- Up dating progress report, weekly report & monthly report to Area Manager & Client.
- Arranging requisition materials for fabrication & installation related time schedule & drawing.
Nov, 2004 – March, 2005 Truba Arabia (j.V company between Jurong Engineering Ltd, Singapore and BEMCO Contracting Co, Saudi Arabia)
Occupation Project Engineer (Mechanical & Piping Works)
Job Location Head Office Truba Jurong Engineering - Jakarta
Responsibility - Estimation of manpower planning, consumables, equipment and budgeting for
Project tender purpose.
April, 2004 – July, 2004 Truba Arabia (j.V company between Jurong Engineering Ltd, Singapore and BEMCO Contracting Co, Saudi Arabia)
Occupation Field Engineer (Mechanical Static/Rotating Equipments, Balance of Plan & Piping Works).
Job Location Riyadh Power Plant # 9 - Saudi Arabia
Client General Electric (Ge) - Usa
Responsibility - Preparation & maintain updating schedule for installation works.
- Reviewing design engineering, technical specification and drawing before construction.
- Monitoring progress installation works versus manpower resource & tools.
- Maintaining procedure of installation base on ASME, ASTM, ANSI, API and JIS Standard.
- Maintaining quality management base on ISO 9001-2000, 14001
- Monitoring procedure of safety during construction base on OSHAS 18001
- Involve and solve problem if any technical problem during construction at site.
- Up dating progress report, weekly report & monthly report installation to Area Manager & Client.
- Arranging requisition materials for fabrication & installation related time schedule & drawing.
Feb, 2002 – Dec, 2003 Pt. Atmindo - Medan (Manufacturing & Engineering) Steam Boiler BABCOCK Gmbh - Germany.
Occupation Quotation & Estimation Engineer (Pressure Parts & Vessels)
Responsibility - Estimation prices for sales/ tender of water tube, fire tube boiler & vessels.
- Making of data specification of water tube, fire tube boiler & vessels.
Aug 2001 – Jan 2002 Pt. Cilegon Fabricators - Cilegon (J.V multi-company between Pt. Truba Engineering, Jurong Engineering Ltd Singapore, and Ishikawajima-Harima Heavy Industries (IHI), Japan.)
Occupation Project Team Leader (PTL)
Responsibility - Preparation production project reports actives such as maintain raw material & updating
Progress report to client.
- Detailed production schedules versus actual, budget cost & cost committee and etches.
May, 2001 – July 2001 Pt. Tirtabumi Medan Perkasa – Medan (Soft Drink Factory)
Occupation Maintenance & Planning Engineer (Rotating Equipments)
Responsibility - Maintain schedule of maintenance rotating equipments (by weekly, monthly and per 6 month).
Oct 1999 – Jan 2000 Pt Truba Jurong Engineering – Jakarta (J.V company between Jurong Engineering Ltd, Singapore and Tri Usaha Bakti)
Occupation Field Engineer (Mechanical Rotating/Static Equipments, Piping & Steel Structural Works)
Job Location Pk. Baru – Riau
Client PEC – Tech Indonesia
Responsibility - Preparation & maintain updating schedule for installation works.
- Reviewing design engineering, technical specification and drawing before construction.
- Monitoring progress installation works versus manpower resource & tools.
- Maintaining procedure of installation base on ASME, ASTM, ANSI, API and JIS Standard.
- Maintaining quality management base on Iso 9001-2000 and Iso 14001
- Monitoring procedure of safety during construction base on Oshas 18001
- Involve and solve problem if any technical problem during construction at site.
- Up dating progress report, weekly report & monthly report installation to Area Manager & Client.
- Arranging requisition materials for fabrication & installation related time schedule & drawing.
May 1998 – July 1999 Pt Truba Jurong Engineering – Jakarta (J.V company between Jurong Engineering Ltd, Singapore and Tri Usaha Bakti)
Occupation Field Engineer (Mechanical Rotating/Static Equipments, Piping & Steel Structural Works)
Job Location Palembang – South Sumatera
Client KLOCKNER Gmbh - Germany
Responsibility - Preparation & maintain updating schedule for installation works.
- Reviewing design engineering, technical specification and drawing before construction.
- Monitoring progress installation works versus manpower resource & tools.
- Maintaining procedure of installation base on ASME, ASTM, ANSI, API and JIS Standard.
- Maintaining quality management base on Iso 9001-2000 and Iso 14001
- Monitoring procedure of safety during construction base on Oshas 18001
- Involve and solve problem if any technical problem during construction at site.
- Up dating progress report, weekly report & monthly report installation to Area Manager & Client.
- Arranging requisition materials for fabrication & installation related time schedule & drawing.
Nov 1997 – April 1998 Pt Canang Indah – Medan (Medium Density Fiberboard Factory)
Occupation Maintenance Engineer
Job Location Medan – North Sumatera
Responsibility - Maintain schedule of maintenance rotating equipments (by weekly, monthly and per 6 month).
April 1995 – July 1996 Pt. Irama Dinamika Latex – Tg. Morawa (Latex Concentrate & Glove Factory)
Occupation Operator of Package Boiler
Job Location Medan – North Sumatera
Responsibility - Maintain operational package boiler.
|
|
|
|