| Position wanted: |
Lifting equipment engineer |
| Job category: |
ConstructionIndustrialInstallationOil Industry |
| Objective and Resume Summary: |
|
willing hard work.
good team work and team communication.
high dedication and integrity.
working with the practical safety method |
| Skills: |
engineer |
| Known languages (and levels): |
English-GoodJapanese-A little
|
| Type of Employment wanted: |
Full Time
|
| Minimum Yearly Salary in Numbers: |
24000 USD
|
| Current Location: |
Indonesia, Semarang |
| Education History, Qualifications & other additional information: |
| Level of Education: |
Bachelor
|
Educational Qualification : Bachelor (S-1) Degree of Diponegoro University, Semarang majoring in Mechanical Engineering
Within concentration of Rotating Mechinery Construction (GPA Score = 3.18 in Scale : 4.00)
Thesis : The Using Finite Element Method for Analysis Dynamics Characteristic of Rotor Shaft System
Training & Certification :
A. Integrated Safe System Of Work Permit To Work (Issow Ptw)
In Tangguh LNG Project, by British Petroleum(BP) and JGC/KBR/PFN Joint Operation, May 2008
B. Simoultanous Opearation (SIMOPS) and commisioning training
In Tangguh LNG Project, by British Petroleum(BP) and JGC/KBR/PFN Joint Operation, January 2008
C. Confine Space Training
In Tangguh LNG Project, by British Petroleum (BP) and JGC/KBR/PFN Joint Operation, December 2007
D. First Aid Training
In Tangguh LNG Project, by British Petroleum (BP) and JGC/KBR/PFN Joint Operation, August 2007
E. Scaffolding Training
In Tangguh LNG Project, by British Petroleum (BP) and JGC/KBR/PFN Joint Operation, March 2007
F. Spill Respons Team Training
In Tangguh LNG Project, by British Petroleum (BP) and JGC/KBR/PFN Joint Operation, February 2007
G. Crane and Rigging Training
In Tangguh LNG Project, by British Petroleum (BP) and JGC/KBR/PFN Joint Operation, January 2007
H. Fall Protection Training
In Tangguh LNG Project, by British Petroleum (BP) and JGC/KBR/PFN Joint Operation, December 2006
I. Training for Quality Awareness,
In PT. Truba Jurong Engineering, on February 2007
J. Training Crane and Rigging for `Oil and Gas/Migas Certification`
In PT. Truba Jurong Engineering, on December 2006
K. Training OHSAS (Occupationaql Health and Safety) 18001:1999 and Iso 14001:2004
(enviromental Management) in PT. Truba Jurong Engineering, on May 2006
L. Training for Cost Project Calculation
In PT. Truba Jurong Engineering, on June 2005
M. Training Finite Element Method
In Diponegoro University, Semarang, on January 2004
N. Training AutoCad R.2000 and AutoCAD Mechanical Desktop (Amd) 4.0
In Harsindo, Semarang, on March up to May 2002
O. Training English and Japanese Language
In Diponegoro University, Semarang, on August 2000 up to July 2001
P. Training Operator Windows
In Gema Mitra Berkarya, Semarang, on July 1999
Reward : 1 The best safety performance at Brunei Methanol Project
2 Safety Excellent Reward at Tangguh LNG Project
Computer Literature :
1 Auto CAD 2d and 3d
2 Microsoft Project
3 Microsoft Office (Word, Excell, Power Point)
4 Adobe Photoshop
Classification : Engineer for Rigging/Lifting/Equipment Installation/Mechanical/Safety
|
| Work History & Experience: |
| Years of Work Experience: |
5 to 7 Years |
Work Experiences
1. PT. Rekayasa Industri
(majoring in Engineering-Procurement-Construction Field of Process Mechanical-Pipeline-Electrical-Instrumentation-Civil) ; Iso 9001:2000 ;
L Project : Brunai Methanol Project
Sungai Liang, Kuala belait, Brunai Darussalam
Period : July 2008 up to now
Client : Mitsubishi Heavy Industries Ltd
Owner : Brunei Methanol Compani Sdn. Bhd.
Position held : Mechanical Lifting Coordinator
Job and responsibility :
1 Planning, control, and review heavy equipment, tools and manpower for lifting operational project such as installation equipment,
Equipment inland transportation and loading unloading equipment.
2 Coordination with project client and concerned party for installation equipment (vessel, pump, structure, air fin cooler, reformer, cooling tower,
Flare stack, tank, piping, etc) for the best practical safety method.
3 Prepare, inspect and control rigging plan (technical drawing and safety risk assessment), rigging gears, manpower and heavy equipment for
Rigging activity and conduct rigging execution.
4 Conduct, control and ensure all execution lifting activity by heavy equipment run safely and smoothly.
2. PT. TRUBA Jurong Engineering (tje)
(majoring in Engineering-Procurement-Construction Field of Mechanical-Pipeline-Electrical-Instrumentation-Civil) ; Iso 9001:2000 ;
L Project : Tangguh LNG Project,
West Papua, Indonesia
Period : December 2006 up to June 2008
Client : JGC, Brown & Root Indonesia, Pfn
Owner : British Petroleum (Bp)
Position held : Mechanical Lifting Engineer for Heavy Equipment Arranggement and scaffolding supervision
Job and responsibility :
1 Planning and control heavy equipment and manpower for support project activity
2 Planning, control and coordination with concerned party for heavy equipment usage at project activity and make the heavy equipment and
Manpower availability 95 % in every project activity
3 Scheduling and review the heavy equipment maintenance regularly and coordination with maintenance departement.
4 Conduct, control and ensure all execution lifting activity by heavy equipment run safe and smooth
5 Prepare and documented the heavy equipment inspection and load test.
6 Planning, control and review manpower, tools, and scaffolding necessary for support project activity.
7 Conduct and joint inspection with client for tagging and safety installation scaffolding.
3. PT. TRUBA Jurong Engineering (tje)
(majoring in Engineering-Procurement-Construction Field of Mechanical-Pipeline-Electrical-Instrumentation-Civil) ; Iso 9001:2000 ;
L Project : Electrostatic Presipator (ESP) Shut Down, Porsea Project
PT. Toba Pulp Lestari, North Sumatera, Indonesia
Period : September 2006 up to October 2006
Client : PT Toba Pulp Lestari (Tpl)
Position held : Mechanical Lifting Coordinator
Job and responsibility :
1 Planning, control and sources heavy equipment and manpower for Electrostatic Presipator (ESP), water treatment clarifier shut down project,
With term of schedule very tight.
2 Planning, control and coordination with concerned party for mechanical installation sequence of electrostatic presipator (Esp).
3 Prepare rigging plan and safety risk assasment for installation of electrostatic presipator (ESP) and conduct the rigging execution.
4 Planning, control and sources manpower, tools, and scaffolding necessary for support shut down project.
4. PT. TRUBA Jurong Engineering (tje)
(majoring in Engineering-Procurement-Construction Field of Mechanical-Pipeline-Electrical-Instrumentation-Civil) ; Iso 9001:2000 ;
L Project : Ship Loader and Stacker Reclaimer Mechanical Erection, Dumai Project
Riau, Indonesia
Period : May 2006 up to September 2006
Client : Pech Tec Indonesia
Position held : Mechanical Lifting Engineer
Job and responsibility :
1 Planning control and review heavy equipment and manpower for project support activity.
2 Planning, control and coordination with concerned party for mechanical installation sequence of Ship Loader and Stacker Reclaimer.
3 Prepare rigging plan and safety risk assasment for installation of ship loader and stacker reclaimer.
4 Planning, control and sources manpower, tools, and scaffolding necessary for support project activity.
5. PT. TRUBA Jurong Engineering (tje)
(majoring in Engineering-Procurement-Construction Field of Mechanical-Pipeline-Electrical-Instrumentation-Civil) ; Iso 9001:2000 ;
L Project : 2x300 MW, Coal Fire Steam Power Plant, Cilacap project
Cilacap, Central Java, Indonesia
Period : October 2004 up to May 2006
Client : Chengda Engineering Coorporation Of China (Cecc)
Owner : Sumber Segara Primadaya (S2p)
Position held : Mechanical Lifting Engineer
Job and responsibility :
1 Planning, control and coordination with concerned party for mechanical installation such us boiler, turbin, electrostatic presipator,
Belt conveyor, stacker truss, belt conveyor, remineralization and demineralization.
2 Prepare rigging plan and safety risk assasment for mechanical equipment installation
3 Arrange and scheduling daily activity for heavy equipment activity and rigging manpower.
4 Joint inspection with safety department and prepare load test for heavy equipment.
5 Control and review heavy equipment and rigging manpower time sheet.
6. CV. Rancang Semirang Semarang
L Project : Electrichal Lighting System, Kudus Regency
Kudus, Central Java, Indonesia
Period : August 2004 up to October 2004
Client : Kudus Regency Government
Position held : Electrichal Supervision
7. PT. SWAKON SEMARANG
L Project : Masjid Agung Jawa Tengah Project
Semarang, Central Java, Indonesia
Period : October 2003 up to April 2004
Client : Semarang Province Government
Position held : Mechanical & Electrichal Designer
|
|
|
|