|
|
| Position wanted: |
Electrical Engineer |
| Job category: |
ConstructionManagement/Manager |
| Preferred Location: |
Australia |
| Preferred City-State/County: |
Brisbane - Queensland |
| Objective and Resume Summary: |
|
| I am looking for an employment in the field of Power Transmission and Distribution. I enjoy working with people and I am committed to the delivery of quality service. I believe my positive attitude and willingness to give 100 per cent will be an asset to your business. |
| Skills: |
Language
• English – IELTS 6.5
• Hindi
• Gujarati – Mother Tongue
Organizational Skills
• Technical/Commercial Evaluation of Tender (Electrical) – BEC LLC, Oman
• Project Coordination (Electrical Projects) – Pyramid Engineer, India, Galfar Engineering, Oman & BEC LLC, Oman
• Project Progress & Cost Monitoring – BEC LLC, Oman
Computer/Technical Skills
• Microsoft Word, Excel, Outlook
• Partial Discharge (6.6kV to 33kV Systems) and Thermography Inspection for (HV – 132kV, 66kV and 33kV Systems)
• MS Project 2003
Artistic Skills
• Painting
• Crafting
Interests
• Watching TV Channels like Discovery, National Geography etc.
• Reading about new inventions and technology
• Listening to music
|
| Known languages (and levels): |
English-Very GoodArabic-A littleHindi-Very GoodOther: Gujarati
|
| Type of Employment wanted: |
Full Time
|
| Minimum Yearly Salary in Numbers: |
75000 AUD
|
| Current Location: |
Oman, Muscat |
| Education History, Qualifications & other additional information: |
| Level of Education: |
Bachelor
|
Gujarat University (vasad Campus)
Bachelor of Engineer in Electrical
Year – 2002
Related Specialty
High Voltage Power System Operation and Control
Professional Trainings
• HSE Induction
• Thermography Inspection Training for HV, MV Over Head Lines using RAYTHEON camera, USA.
• AutoCAD 2007
|
| Work History & Experience: |
| Years of Work Experience: |
5 to 7 Years |
April 2007 – Present
Bahwan Engineering Co. LLC, Sultanate of OMAN
Project Engineer (Electrical Projects Division)
Projects:
1) 33kV/11kV Primary Substation for New Psychiatric Hospital – MEDCO
Project Value: 4.25MN US $
2) 33kV/11kV Primary Substation for Tilal Complex – MEDCO
Project Value: 6MN US $
• Project scheduling, management and co-ordination.
• Financial management of projects.
• Floating enquiries for Design contract, Major S/S equipments, HV-MV-LV cables, Earthing material, Cable Trays etc.
• Technical Evaluation of proposals, design documents, manuals, drawings, schematics etc.
• Supplier/Vendor liaison (local and overseas suppliers).
• Preparation of Method Statements for substation activities like Transformer Erection, Panel Erection, DC Battery System Installation, Cable laying etc.
• Produced detailed work advices.
• Monitoring Erection, Commissioning and Testing Activities.
• Resource Management.
• Manage contractors/subcontractors.
Project: Maintenance of HV & LV Equipments for PDO
Project Value: 15MN US $
• Coordination with PDO on both technical and commercial matters.
• Site coordination for HSE, progress and follow up for issue of purchase orders.
• Monitoring Journey Management Rate, Training Matrix, HSE Statistics etc.
• Preparation of invoices to PDO for completed activities.
• Update of daily / monthly progress reports.
• Coordination with vendors for specialized services viz. Partial Discharge, Thermography Inspection.
• Day to Day monitoring of site activities and resource management.
• Coordination with LCC companies (Subcontractors) for their progress.
• Reconciliation of PO & SE using PDO authorized SAP key.
Involvement in Tenders:
• Maintenance of HV & LV Equipments for Petroleum Development of Oman
• 33/11kV Primary Substation, Psychiatric Hospital for Ministry of Health
• 33/11kV Primary Substation for TILAL Complex
• 11kV/433V Substation for Oxydental Oman LLC, USA
• 132/33kV Nakhal Grid Substation and Associated 132kV Overhead Lines
September 2006 – March 2007
Galfar Eng. & Cont. SAOC, Sultanate of OMAN
Electrical Engineer (Oil & Gas Division)
Project: 132/6.6kV Substation and OHL at Kauther for
Petroleum Development of Oman
• Responsible & Involved in Project Kick-off meeting.
• Project scheduling using MS Project 2003.
• Monitoring the Progress, Monthly Progress Report Preparation.
• Material/Resources Budget workouts, Procurement and Inspection of Project Materials.
• Co-ordination with client, consultant and vendors for technical matters.
• Responsible & Involved in 132KV, 33KV Overhead Line and Substation’s SLD, Earthing – Cable – Equipment Layout Drawings, Structural Drawings, Lighting and Lightning Drawing review.
• Responsible & Involved in Procurement activities like Floating enquiries & Co ordination with vendors for outdoor CT, PT, CB, Steel Tower, Wooden poles, conductor, Transformers, Auto Recloser, Control Panels etc.
• Document Preparation as per requirement of ISO 9001:2000.
• Familiar with International Standards and Codes, PDO Specification and Engineering Standards, Shell Standards etc.
September 2002 – August 2006
Pyramid Engineers, Gujarat - INDIA
Project Engineer - Electrical
Project: 66/11kV Substation and OHL Projects for various clients (ONGC, Kanda Port
Trust, Mid India Steel Co., Indian Steel Plant etc.)
• Installation of Distribution control Building Switchgear, Control Panels, Battery Charger, 415V LV Switchboard, HVAC, Fire Alarm System, Smoke Detection System etc.
• Design review of HV substation, steel plant, lighting (indoor – outdoor)
• Erection and Commissioning of Transformers of ratings 15MVA (66KV/11KV) - 2 NOS, 6.8MVA (66KV/11KV) - 3 NOS, 400KVA (11KV/433V) - 2 NOS.
• Erection of Switchyard Equipments like Gantry, SA, CT, CVT, SF6 Cb, Isolator, Pi and structures.
• Switchyard Lightning Protection & Earthing.
• Laying, termination of HV (11KV), LV (415V) and Multi core control cables for Transformers, Motors, Feeders etc.
• Procurement for Project Items and Inspection of Wooden Poles, Control Panels, Transformers, Auto Recloser, Disconnector etc.
• Supervision of 66KV Overhead Line works.
• Prediction of financial implications including energy, investment, lamp and maintenance costs for different luminary’s arrangements, lux and cost Calculation for Indoor and Outdoor Lighting.
• Design, Construction of Hypermarket – Power Distribution system, Lighting.
|
|
|
|