|
|
| Position wanted: |
Structural Engineer |
| Job category: |
ConsultancyEngineeringOil Industry |
| Objective and Resume Summary: |
|
I am thirty one years old and graduated from The University of Muhammadiyah Surakarta (U.M.S) major in civil engineering. I am still employed with PT. Technip Indonesia as Structural Engineer. I have been working 7 (seven) years in Oil & Gas Industry.
Besides, I am able to operate personal computer using the latest software program with Ms. Office XP, Internet program (using the internet explorer and email), AutoCAD release 2006, Staad Pro 2004, Caesar II 4.20 and Sacs Version 5.1./5.2. Familiar with the codes such as API RP 2A WSD, AISC, ASTM, DNV, AWS, ASME, BS, ABS & ISO standard. I am also understand with the drilling machinery & equipment on the drilling Rig.
|
| Skills: |
Training / Course :
1. Computer Course Ms.Office Program. (Certificate)
2. Computer Course AutoCad 2006 Program, (Certificate)
3. Computer Course Sap 90 Program. (Certificate)
4. English Course. (Certificate)
5. Iso 9000 2001 (certificate)
6. Work Permit at Total Indonesie Job Area
7. Hazard Identification & Risk Assessment at Total Indonesie Job Area.
8. Familiar with the codes such as API RP 2A WSD, AISC, DNV, AWS, ASME, BS, ABS & ISO standard.
9. Fist Aid Training at Total Indonesie. (Certificate)
10. In house Training Staad Pro 2004
11. Swing Rope Training
12. Technip Indonesia Training SACS 5.1./5.2.
13. Technip Indonesia Training Caesar II 4.20
|
| Known languages (and levels): |
English-Very GoodOther: Indonesia
|
| Type of Employment wanted: |
Full Time
|
| Minimum Yearly Salary in Numbers: |
55000 USD
|
| Current Location: |
( Confidential ) |
| Education History, Qualifications & other additional information: |
| Level of Education: |
Bachelor
|
Education Back Ground :
1. Graduated from University of Muhammadiyah Surakarta (U.M.S.) in March 2001 Major in Civil Engineering.
2. Graduated from Senior High School (S.M.U 1) Balikpapan in 1995.
3. Graduated from Junior High School (S.M.P 1) Balikpapan 1992.
4. Graduated from Elementary School (S.D YBBSU) Balikpapan 1989
|
| Work History & Experience: |
| Years of Work Experience: |
7 to 10 Years |
Detail Of Job Experiences
1. Name Of Company : Pt. Technip Indonesia
Started From 1 August 2006 Present
Client : - Total Indonesie .
- Chevron Indonesia
Name of Project : 1. Floating Barrier For Cpu, Cpa & Npu Platform Project
2. Peciko 6 LP Compression Installation Offshore Offloading Pump for Mwp-a, Swp-g, Mwp-b, Mwp-c, Swp-e, & Swp-k Platform.
3. Project Peciko 7A Detail Design For :
- Conductor Guide And Support Frame MWPA/B & SWP-E Platform.
- Protection Frame MWPA/B & SWP-E Platform.
- Modular Deck Extension MWPA/B & SWP-E Platform.
4. Boat Protection of Navigation Aid at GTS-C Platform
Position : Structural Engineer
Job Description : - Full Design Conceptual for Structural Design Modification.
- Calculation for Structural Analysis.(In Place, Seismic, Fatigue & Lifting).
- Installation Procedure and Calculation
- Weight Control Calculation
Name of Project : - GTS F Platform Decommisioning Project
- GTS E Platform Decommisioning Project
- GTS X Platform Decommisioning Project
- GTS G Platform Decommisioning Project
Project Description : Design for Extension Deck Framing, KO Drum Platform, Access Walkway Platform, Vent Tripod Platform and Access Platform
Name of Project : - Bekapai BL Well Connection 2006 Project
- Bekapai BG Well Connection 2007 Project
Project Description : Design for New Vent Boom, Extension Deck Framing, Modification of Access Platform, Installation for KO Drum Vessel & Modification all existing structural framing.
Name of Project : - 30 Well Connection at Tatun South Area in 2006
Project Description : Design for Depth of Piling, Arrangement of structural for new tie-in of piping, Access Walkway, Adjacent Wellhead Platform.
Name of Project : Tunu Phase 12 Pre Engineering Development Project
Project Description : Design for Depth of Piling, Arrangement of structural for new tie-in of piping, Access Walkway, New arrangement for Adjacent Wellhead Platform & Adjacent Bridge Platform to support 4 Well.
Name of Project : Peciko 5 Field Development Project
Project Description : Design for New SWP-F Platform which is containing of new Jacket, Piling Arrangement, Top Side Structure ( Upper Deck, Cellar Deck, Mezzanine Deck, Lower Deck and Sump/SDV Deck) to Support all Piping, Mechanical, & Instrument equipment.
Position : - Structural Designer
Job Description : - Full Design Conceptual for Structural Design of Platform
- Coordination with the Engineer for the essential design as per Client Specification.
- perform non-routine and complex assignment involving responsibility for planning and conducting complete coordinates the work. Reviews, analyses and integrates the technical requirements and design approach
- Interface with multi discipline design personnel
- Leading for draftsmen in the preparation of design drawings for offshore and onshore facilities.
- Involve closely and interacting with relevant discipline engineer to develop technical solution in an efficient and pro active manner.
- Checking of work performed by others, demonstrate competencies in generation of bill materials for estimating and procurement purpose and detail facilities.
- Ability to perform site survey in onshore and off shore for collecting data and field verification sketches for relevant discipline
2. Name Of Company : Pt. Pd&ms Indonesia (project Design & Management Services Indonesia). Subsidiary from PD&MS Ltd. Of United Kingdom.
Client :- Rig of Transocean
- Rig of Global Santa Fe
- Rig of Diamond Offshore
- Rig of Apexinfo Offshore
- Rig of Pride Offshore
- Rig of Searex Offshore
- Rig of Sedco 601
- Chevron Indonesia (Ex Unocal Indonesia).
Job Description : - Full Design Conceptual for Structural Modification for :
A. Jack-Up Platform.
B. Submersible Platform
C. Semi Submersible Platform
D. Land Operation Platform
E. Cellar Deck Platform
- As Built Drawing for Structural & Piping layout.
- Estimating For Material Take Off (MTO).
- Coordination with the Lead Engineer for the essential design as per Client Specification.
- Supervise & Control Quality Drawing from the Draftsman.
- Supervise For Offshore Structural / Piping Fabrication & Installation.
Position : Lead Structural Designer.
Started From 15th March 2006 31 July 2006.
3. Name Of Company : Pt. Meindo Elang Indah Jakarta & Balikpapan, Indonesia
Joint Operation with : Pt. Sempec Indonesia. Subsidiary from Sembawang Corporation of Singapore.
Owner of Project : Total Indonesie Balikpapan.
Name Of Project : Tambora Field Development Project Phase-2/Epsc1
Project Description : - Fabrication 3 (Three) Gathering Testing Satelite Platform GTS-2X, 3, & 4.
- Fabrication Adjacent Wellhead Platform
- Modification GTS-1, GTS-2 & Tie in STP 3.
- Fabrication Load Out Barge
Value of Project : US$ 72 Million
Position : Structural Designer.
Job Description : - Make Structure Shop Drawing
- Updating & Modification Structural Layout.
- Civil Structural Detail Drawing.
- Make Structural Work Procedure
- Procedure Detail Drawing
- Piping Detail Drawing
- Estimating For Change Order Request
- Weight Control Estimation
Additional Job: As Ballast Controller for Load Out Platform.
Started From 15th March 2005 14 th March 2006.
4. Name Of Company : Pt. Astinaputera Ekaperkasa Balikpapan, Indonesia
Joint Operation with : Pt. Transmega Ekacipta
Owner of Project : Total Indonesie Balikpapan.
Name Of Project : Tunu Field Development Project - Phase-9/Epsc1
Project Description : Fabrication 5 (Five) Gathering Testing Satelite Platform
GTS-TMx, Y, Dx, AC, & AA
- Fabrication Adjacent Wellhead Platform
- Fabrication Scrapper Platform
- Fabrication Riser Platform
- Fabrication Vent Tripod Platform
- Fabrication KO Drum Platform
- Fabrication Accomodation & Load Out Barge.
Value Of Project : US$ 120 Million
Position : Senior Draftman
Job Description : - Make Structure Shop Drawing
- Design Facility Yard.
- Updating & Modification Structural Layout.
- Civil Structural Detail Drawing.
- Piping Detail Drawing
- Procedure Detail Drawing
- Estimating For Change Order Request
Started From 01st August 2003 28 th February 2005
5. Name Of Company : Pt. Kaliraya Sari Balikpapan, Indonesia
A. Owner of Project : Unocal Indonesia. LTD. Balikpapan.
Name Of Project : CO2 Removal Project
Project Description : CO2 Removal
Position : Project Control
Job Description : - Making of Daily, Weekly, and Monthly Progress
Started From 10th October 2001 01 st September 2001.
B. Owner of Project : Goverment. Balikpapan.
Name Of Project : A. Highway of Karingau Phase I Project
B. Highway of Karingau Phase II Project
C. The Last Place of Trash Throw Project
D. Slide Of Embankments Project
E. Highway of Karingau Phase III Project
F. Rigid Pavement Project
Project Description : - Making of Highway with Soil Cement Recycling,
- Build Box Culvert & Drainage
- Making of Trash Throw Place, Build Sliding Reinforced With GeoTextile & Concertina Wire
- Making of Retaining Wall with Concrete K-225
- Making of Highway With Concrete K-225 & Asphalt Treated Base
Position : Civil Engineer
Job Description : - Calculation for Structural Design.
- Making Of Monthly Certificate
- Managed Material Supply
- Making Of Back Up Data Quatity
- Control the Quality of Shop Drawing
Started From 10th October 2001 30th July 2003
|
|
|
|