| Position wanted: |
Engineer, manager |
| Job category: |
ConsultancyDistributionEngineeringManagement/ManagerProduction |
| Preferred Location: |
Oman |
| Preferred City-State/County: |
Muscat |
| Objective and Resume Summary: |
|
Work Experience more than 5 years
Area of job: commissioning and installation, management
Industry: Power
Roles by now: Tech/ Engg - Manager,Electrical Engineer
Current Employer ABB AG, Doha Qatar
Current Annual Salary Qatari Riyals 35000 per month
Previous Employer Mitsubishi Electric, Dubai branch
Current Sponsorship / Visa Status Employment Visa (NOC attached) - Authorized to work in Qatar
Education Master`s Degree, Electrical engineering, Faculty of electrical Engineering of Belgrade, Serbia
Preferred Job Location Muscat
Desired Job Type Permanent Full Time
|
| Skills: |
Senior commissioning engineer, deputy site manager |
| Known languages (and levels): |
English-Very GoodGerman-A littleRussian-A littleOther: Serbian - native
|
| Type of Employment wanted: |
Full Time
|
| Minimum Yearly Salary in Numbers: |
50000 Euro
|
| Current Location: |
Qatar, Al-Dawhah (Doha) |
| Education History, Qualifications & other additional information: |
| Level of Education: |
Masters
|
1986. - 1998. Primary and Secondary Education
1998. - 2004. Faculty of Electrical Engineering, Belgrade, Power Engineering Major, 5 years - 10 semesters studies , average mark 80.9 %
Graduated on in April 2004 with the mark 10 (on the scale 6 to 10) by Prof. Dr. D. Petrovic
2005. - Post graduated studies at Faculty of Electrical Engineering, Belgrade, HV Equipment Major
|
| Work History & Experience: |
| Years of Work Experience: |
5 to 7 Years |
August 2008 - to date
ABB AG - phase VII Qatar/Doha
Abu Nakhlah Super Substation 400/220/132/11kV, 400/220kV 2x800MVA, 220/132kV 3x315MVA, 132/11kV 2x60MVA
Al Wajba Super Substation 400/220/132/66/11kV, 400/220kV 3x800MVA, 220/132kV 3x315MVA, 220/66kV 2x200MVA, 66/11kV 2x40MVA
Doha North Super 220/132/66/11kV- Remote End (3 feeders)
Doha South Super 220/132/66/11kV- Remote End (1 feeder)
Maither Central 132/66/11kV - Remote End (1 feeder)
Commissioning Engineer
Commissioning of relay protection systems and signalization with IEC61850 protocol:
ABB Rex670 series, Siprotec 4 devices
Remote Ends modification in panels and testing protection and signalization
End-to-end tests
Stability tests
September 2007 - July2008
Mitsubishi Electric Corporation
Dubai Branch
Gardens substation 400/132kV, 4x505MVA
Commissioning and Site Manager Assistant / Deputy
Deputy Site Manager engaged in installation of transformers, 400kV and 132kV GIS, earthing grid
Assistant Commissioning Manager, with following duties:
Secondary and Primary Injection/component testing
Sensitivity and Stability Tests
CT and VT testing
Interlock, gas pressure low trip, DCC signal test
Voltage selection scheme checking
Synchronization scheme checking
Substation Earthing resistance
Transformer ratio, vector group
Cabling, terminating and erection of relay and control panels
Necessary modifications in local control and relay panels, in control, tripping and CT, VT circuits
April 2004 - August 2007
Power Transmission Company SONELGAZ, Algeria
Commissioning Engineer
Substation Rouiba 220/60/30kV 2X120MVA, Alger -Algeria
Commissioning of protections systems:
Siprotec 4 and Siprotec 3 devices: 7RW600, 7SA612, 7SD52, 7SJ 600, 7SJ602, 7SJ611, 7SS52, 7UT61, 7VK611
GE D60, T60
Substation Mohammadia 60/10kV 2X40MVA, Alger -Algeria
Commissioning of protections systems:
Siprotec 4 and Siprotec 3 devices: 7RW600, 7SA612, 7SD52, 7SJ 600, 7SJ602, 7SJ611, 7SS52, 7UT61, 7VK611
National Power Utility of Serbia (former Elektroistok)
Commissioning Engineer
FAT for revitalization of substations (more then 270 panels of relay protection, AC and DC distribution):
Beograd 8 400/220/110 kV
Novi Sad 3 400/220/110 kV
Nis 2 400/220/110 kV
Beograd 3 220/110 kV
Beograd 5 220/110 kV
2 weeks training for ABB relay protection 670 series (REL670, RET670, REG670)
Substation Vlasotince 110/35/10 kV 1X32MVA
Commissioning of transformer relay protection (RET 521) for Transformer 110/35/10 kV, 32 MVA
Substation Jagodina 4, 400/110kV 1x150MVA
Commissioning of protection systems:
Siemens Siprotec 4 devices with IEC61850 protocol: 7SA612, 7SA613, 7SD61, 7UT61
Substation Sombor 3, 400/110kV 1x150MVA
Commissioning of protection systems:
Siemens Siprotec 4 devices with IEC61850 protocol:
7SA612, 7SA613, 7SD61, 7UT61
Thermal Power plant TENT, Serbia, 2x500MVA
Commissioning of distance relay protection (AREVA P437) for bays 400 kV
Commissioning of line differential relay protection (REL 561) for bays 400 kV
Commissioning of transformer relay protection (RET 521) for Transformer 400/220 kV, 300MVA
400/220/110kV substation Mladost, Obrenovac
Commissioning of the relays RET 521, REL 561, REL 521, AREVA P43, ARGUS 7, DCD315, MICOM P122, P127
Hydro Power Plant Bajina Bašta, Serbia, 4x100MVA
Commissioning new generator protection systems ABB relays: REG 316, line protection REL521
Substation Obrenovac, 400/220/110kV
Commissioning of distance relay protection (REL 521) for bays 400 kV
Commissioning of line differential relay protection (REL 561) for bays 400 kV
Commissioning of distance relay protection (AREVA P437) for bays 400 kV
2003 - 2004
Energoprojekt, Hidroinzenjering, Belgrade - Associate Engineer
Modernization of HPP “Bajina Basta” - Final design (calculation of short-circuit currents);
Additional unit in HPP “Bajina Basta” - Final design (calculation of back to back starting procedure for motor generators);
HPP “Djerdap 2” - Study of short circuit currents |
|
|
|