|
|
| Position wanted: |
Piping supervisor |
| Job category: |
ConstructionEngineeringGas IndustryIndustrialInstallationMaintenanceManagement/ManagerOil IndustryProductionQuality Control |
| Objective and Resume Summary: |
|
| I worked as piping supervisor for more than five (5) years |
| Skills: |
piping supervisor, site engineer, electrical engineer |
| Known languages (and levels): |
English-GoodFrench-Very GoodArabic-Very Good
|
| Type of Employment wanted: |
ContractFull Time
|
| Minimum Yearly Salary in Numbers: |
Unspecified
|
| Current Location: |
Algeria, Batna |
| Education History, Qualifications & other additional information: |
| Level of Education: |
High School
|
Diplomas and trainings
June 1991: Baccalaureate of Secondary education, Technical mathematical
1991 – 1996: Diploma of electro technical Engineer, option « electrical machines » (University of Batna – Algeria).
Memory of the end of study: Study and realization of a card of command for an electrical vehicle.
Languages
Arab: Spoken and written (very good).
French: Spoken and written (very good).
English: Spoken (Well) and written (very good).
Summary of the Competence
Dynamic, motivated, rigorous, autonomous, methodical, team spirit and available.
Driving licence (Drive assessment training).
Mastery of tools data processing: operating system XP, 2000, Utilities (Word, PowerPoint, Excel).
JSEA training and Permit to work (SONAHESS system) training.
Confined space, work at height and scaffolding trainings.
|
| Work History & Experience: |
| Years of Work Experience: |
5 to 7 Years |
Career summary
May 2009 to present.
IIF Field Facilitator. For Qatar Gaz
Project: QG 3&4 Onshore Project, Ras Laffan Qatar.
The position is a field based role working out of the QG3&4 project office championing Incident and Injury Free (IIF).
The purpose of IIF is to elevate the level of awareness to safety of project personnel by making it personal, relevant and important; to the extent that it impacts on there choices and actions during work and after work.
• Take an active role in safety management on site and ensure compliance with Safety, Health and Environmental requirements.
• Deliver IIF orientation sessions
• Continually drive the IIF philosophy across the project, helping the workforce adjust to safe working practices
• Advise management, supervisors, charge-hands and workers of safe working practices
• Oversee the delivery of tool-box talks, hazard assessments etc. To ensure all information is appropriately delivered to the workforce
• Assist supervisors and charge-hands in the delivery of health and safety related information
• Work with QG3&4 HSE department to ensure that all construction activities are undertaken in accordance with project procedures
• Define the scope for each assigned initiative and identify the infrastructure availability, quantification of the required materials and identification of resources for execution.
• To work closely with line supervisor and also the IIF project executors from the contractors and subcontractors.
• Monitor, inspect, audit and guide all engineering and construction activities performed by the executing party.
• Liaise and coordinate with and provide expert advice to the other disciplines and groups in the project team.
• Communicating and reporting on the work in progress to the line management.
• Witness and inspect Contractor’s works as indicated on the approved project scope for specifications.
• Provide technical advice and input to other groups and disciplines within the IIF projects Onshore including safety, mechanical, electrical, instruments, commissioning, operations, procurement and commercial.
• Be familiar with all applicable Project and Qatargas philosophies, policies and procedures and ensure full compliance.
• Identify and anticipate on potential future problem areas and develop timely solutions.
• Establish target schedules and project estimates for approval by IIF Leadership Team.
April 2007 May 2009 .
Piping Supervisor. For Sarpi (abb & Sonatrach association company of realization of industrial projects)
Projects: Hassi EL Gassi ; Optimisation of oil systems.
Installation and erection of equipments: Separator, Gas Fired Heater, exchanger, filter, pumps …etc.
Assist and elaborate JSEA procedures (Job safety & environmental analysis).
Ensure the high standards of safety and quality during all phases of construction.
Estimate of work to make a cost and a planning schedule.
Elaborate a permit to work for each area either a specific work on site.
Follow up extra works.
Supervision of piping, electrical and instrumentation installations as per drawings and schedules.
Follow up material shortages and request if required.
Go through test packs and elaborate punch lists for hydrostatic tests.
Assist all operations of hydrostatic and pneumatic tests.
Coordinate between client (Sonahess & Petrofac) and other contractors.
April 2006 April 2007
Site engineer. For SARPI in: Hassi EL Gassi location.
Realization of well head installations (gas injection, gas lift, water injection and well wash systems) and manifolds.
Modifications in a gas compression centre.
Ensure the high standards of safety and quality during all phases of construction.
Elaborate a permit to work for each area either a specific work on site.
Supervision of piping, electrical and instrumentation installations as per drawings and schedules.
Ensure the fabrication and installation of all systems as per issued drawings and scheduled planning.
Coordinate between clients (Sonahess), engineering (BECHTEL) and contractors.
December 2005 April 2006
Site engineer. For Cosider Canalisations.
Project Medgaz Gz4, 48" ; Sougueur-hassi Rmel
Responsible of production and quality.
Coordination and supervision of work.
Ensure maintenance for all equipments and material on site.
Steer and supervise a team of maintenance.
Follow up material shortages concerning internal either external welding machines (CRC Evans & Lincoln).
May 2004 December 2005
Site engineer. For Cosider Canalisations.
Project Gem 48”; Hassi R’mel-tebessa
Member of a maintenance team.
Supervision of production and quality.
Ensure maintenance of welding equipments and material on field.
March 2000 January 2003
Engineer in a civil firm and buildings
Coordination and supervision of work.
Responsible of electricians’ team.
January 98 January 2000
Engineer of maintenance in a unit of sale of computer material
Coordination of the means of maintenance.
|
|
|
|