|
|
| Position wanted: |
Process engineer (engineering & construction) |
| Job category: |
EngineeringGas IndustryOil Industry |
| Preferred Location: |
Qatar |
| Preferred City-State/County: |
Al-Dawhah (Doha) |
| Objective and Resume Summary: |
|
| Looking for a vacancie as process engineer / project engineer / facilities engineer in oil and gas industry. |
| Skills: |
Process engineer (engineering & construction), Project engineer, Facilities engineer |
| Known languages (and levels): |
English-GoodFrench-Very GoodArabic-Very Good
|
| Type of Employment wanted: |
Full Time
|
| Minimum Yearly Salary in Numbers: |
6000 USD
|
| Current Location: |
Algeria, Algiers |
| Education History, Qualifications & other additional information: |
| Level of Education: |
Bachelor
|
- July 1985: Baccalaureate in chemistry
- June 1990: Engineer (Bachelor’s) in chemical engineering at the Algerian Petroleum Institute in Boumerdes / Algeria
- Training courses: Training course for two weeks at the refinery of Skikda/Algeria in
March 1989
- Computer: Word, Excel, PowerPoint, Outlook, Ms Project, Autocad.
- Software: Good skill in using Hysys and Pipesys
- HSE Training: Several topics with Sonatrach / Ourhoud Organization (Ourhoud
Field).
|
| Work History & Experience: |
| Years of Work Experience: |
10 to 15 Years |
1 : From August 2002 till today:
. Location : Sonatrach (Algeria) / Organisation Ourhoud in Technical Department
. Position held : Process engineer (Engineering & Construction)
. Projects : Hook-up of new wells and modifications of new and existing installations in The Central Process Facility:
- Oil producer wells,
- Gas injector wells,
- Water injector wells,
- WAG wells (Water Alternate Gas).
Implicated as process engineer in charge in the following tasks:
- Issuing material requisitions and bills of material,
- Control and approbation of documents of engineering for construction,
- Study of the modifications of new and existing installations (Management Of Change).
- Preparation of the Preliminary Dossier of Modifications,
- Construction Schedule with MS Project,
- Participation in HAZOP study,
- Risk Assessment study,
- Design Studies and drawings (P&ID, Plot Plans & Isometrics).
2 : From April 1997 to Aug. 2002:
Location : Sonatrach / Division Production - Hassi-R` Mel - /Technical Direction
a) Position held : Process engineer (Engineering & Construction)
Projects: - Procurement of 03 triphasic oil separators,
- Procurement of 01 methanol tank and its transfer pumps at an LPG Unit,
- Procurement of 01 treatment unit of gas (5.000.000 Nm3/d),
Implicated as process engineer in charge in the following tasks:
- Call of tenders for all the projects,
- Developing specifications and methods including practice and procedures,
- Analyze and evaluation of the technical and commercial offers,
- Final decision of the Supplier,
- Preparation of the contracts.
b) Position held : Process engineer (Engineering & Construction)
Projects: - Construction supervisor of:
• Construction of a storage unit of butane,
• Construction of a system of detection and fire protection of warehouses and offices,
• Construction of a Boosting unit for increasing gas pressure.
Implicated as process engineer in charge in the following tasks:
- Reception of material,
- Work supervision on site,
- Study of the modifications,
- Commissioning and preparation for start-up,
- Punch lists, etc…
3 : From Mars 1991 to July 1992:
Location : Technical Department/ Petrochemical Complex of Skikda (Algeria)
Position held : Process engineer (Engineering & Construction)
Project: Mercurially water treatment of the unit chlorinates – soda
4 : From Nov. 1996 to April 1997:
Location : Chemistry Department / University of Jijel - Algeria
Position held : Laboratory Engineer
5 : From Sep 1989 to May 1990:
Location : Utilities Unit / Refinery of Skikda (Algeria)
Position held : Process engineer student
Project: Water treatment of boilers
|
|
|
|