| Position wanted: |
DC Power Engineer |
| Job category: |
EngineeringMaintenanceTelecommunications |
| Objective and Resume Summary: |
|
Career Objective:
Enhance professional experiences, in the field of Telecommunication Sector, especially in the fields of; monitoring and evaluation, research and organizational development. Also to achieve challenging and dynamic career in the field of Electro-Mechanical and Information Technology to utilize proficiency and adeptness in my professional experience. Personal objectives are to prove my skills and demonstrate my devotion to the job.
References:
Peter Lawson
Support Manager
Huawei Technologies Co., Ltd (China)
Ahsan Habib
Project Manager
LM Ericsson Bangladesh Limited
Arnulfo F.Rafer
Project Manager
Sumitomo Densetsu Co,. LTD (Japan)
|
| Skills: |
Electrical Engineer, DC Power Engineer |
| Known languages (and levels): |
English-Very GoodHindi-A littleOther: Bangla (Bengali)
|
| Type of Employment wanted: |
ContractFull Time
|
| Minimum Yearly Salary in Numbers: |
Unspecified
|
| Current Location: |
Bangladesh, Dhaka |
| Education History, Qualifications & other additional information: |
| Level of Education: |
Bachelor
|
ć Bachelor of Business Administration
ƒt Institution : Institute of Science and Technology (IST).
ƒt University : National University.
ƒt Major : Finance.
ƒt Duration : 2002 - 2006.
ć Diploma in Information Technology (DIT)
ƒt Institution : IT Bangla Limited.
ƒt University : Assumption University (Thailand).
ƒt Passing Year: 2001 - 2002.
ƒt CGPA : 3.13 out of 4.00.
ć Higher Secondary Certificate Examination
ƒt Group : Commerce.
ƒt Passing Year: 2001.
ƒt Result : 2nd division.
ć Secondary School Certificate Examination
ƒt Group : Science.
ƒt Passing Year: 1996.
ƒt Result : 1st division.
|
| Work History & Experience: |
| Years of Work Experience: |
10 to 15 Years |
Present Position:
Lm Ericsson Bangladesh Ltd. (warid Telecom, Grameen Phone, BTTB Project)
Position : CW Field Electrical Engineer / Site Engineer (Assessed) / Field Maintenance Engineer
Duration : March 07 to Present
Responsibility: ►Managing SP¡¦s & ASP¡¦s for Core site¡¦s & BTS site¡¦s power (AC/DC) and Generators under AMC (Annual Maintenance Contract) for Managed Service of Warid Telecom & Banglatrac Communications as Field Maintenance Engineer (Fme).
►performing Preventive Maintenance (PM) and Corrective Maintenance (CM) for Core site¡¦s & BTS site¡¦s power (AC/DC) and Generators under AMC (Annual Maintenance Contract) for Managed Service of Warid Telecom & Banglatrac Communications as Field Maintenance Engineer (FME). Trouble shooting & Maintaining all Core site Fire Fighting System, Water Detection System, Precision Air con system etc.
►Designing and dimensioning site power requirements for bidding.
►Supervising, Implementing, Monitoring, Troubleshooting Emerson DC power system for CORE Network and handing over to customer at Grameen Phone & WARID Telecom, & Banglatrac Communications and Bttb (msc & Bsc) sites as Power Installation supervisor.
►Supervising, implementing & monitoring Power One DC power system for CORE Network and handing over to customer at Bttb (msc, Bsc & Itx) sites.
►Coordinating for Genset Installation, Commissioning and handing over to customer at WARID (MSC, BSC, BTS and Backbone) sites.
►Coordinating for AC and Dc (pbc 6500) Power installation at Warid (bts, Backbone and IBS) sites.
►Maintaining liaison with different Customers and Service providers to solve technical problems.
Job experience:
Jinzhao technology bangladesh ltd. (china)
Position : Power Engineer (Emerson Power Plant).
Duration : From October 2006 to March 2007
Project : Warid Telecom, Bangladesh, Phase I.
Responsibility: ►Implementing & monitoring Emerson power system for CORE Network at Warid Telecom sites.
►Supervising, Implementing, Monitoring DC power system for CORE Network & BTS sites And handing over to Customers (Banglalink and Citycell).
Thai Semcom Co., LTD. (Thailand)
Position : Electrical & IT Supervisor.
Duration : From February 2004 to September 2006
Project : Ykk Bangladesh Pte Ltd, Phase Ii
Responsibility: Implementing power & backup system for YKK Bangladesh (Depz)
It Bangla Ltd.
Position : Junior Programmer (IT).
Duration : From December 2002 to October 2003
Responsibility: Customized Software Development by using Oracle (8i/Developer 2000), Java (JDK 1.3.3)
Sumitomo Densetsu Co., LTD. (JAPAN)
Position : Electrical, Mechanical Installation & Maintenance Supervisor.
Duration : From June 1998 to December 2002
Project : The Greater Dhaka Telecommunications Network Improvement Project (BTTB)
Responsibility : ►Implementing Emerson power system for Ericsson PSTN telecom equipments.
►Installing & maintaining the total power & Genset process.
Shin Nippon Air Technologies Co., LTD. (SRILANKA)
Position : Installation & Maintenance Trainee.
Duration : From August 1996 to June 1998
Project : The Improvement Project of Maternal & Child Health Training Institute, Dhaka.
Experience On:
„yHardwares :
ć Emerson DC Power System - Actura 48701, Actura 48800, 48300.
ć Emerson DC/AC Inverter System.
ć Ericsson DC Power system PBC6500, BBU9500, BBU 9500i.
ć Power One DC power System.
ƒá Generators ¡V Mitsubishi, Pramac, Denyo, FG Wilson, Mason.
ć Automatic Voltage Regulator (Avr).
ć Fire Alarm System, Water Detection System.
ć Air Conditioning System.
„yEmbedded Software with Emerson Power systems, Ericsson Power Systems and RBS¡¦s.
„yMaintenance Work before Hand Over.
„ySupporting Work with Optimization Team in Field.
Training Certificates:
Class Room Training:
# Telecom Power System Overview. (Organized & Directed by Ericsson Education Center, SWEDEN)
This course provides the basic technical knowledge for power solutions used in the telecommunications industry. The course is focusing on explaining the functionality and dependencies of the power units, also including more detailed information of the battery characteristics. In addition, the course gives the basic know how for power dimensioning of RBS and Core Sites.
# RBS Power Sales Training. (Organized & Directed by Ericsson Education Center, Sweden)
The course is focusing on Ericsson RBS Power Portfolio and the values add and functionality that can be offered in RBS Integrated power solutions as well as stand alone power systems. The course also gives the practical know how for power dimensioning in tender proposals.
# Introduction to Props - C. (organized & Directed by LM Ericsson Bangladesh Limited).
Computer Skills:
ć Operating System : Windows.
ć Programming Language: C, C++, Java (JDK 1.3.3).
ć Application Software : MS Office Package. Visual Basic. Oracle 8i, Developer-2000.
ć Graphics Software : Computer Aided Designing with AutoCad.
Interests:
ć Familiar with new telecom and power equipments.
ć Radio Network Design & implementation.
ć Hardware Fault Escalation & Troubleshoot.
Abilities:
ć Fluent in both English and Bangla.
ć Excellent inter personal communication.
ć Having analytical with problem solving capacity.
ć Like to work in a group under the guidance of others.
ć Also have the ability to guide others. |
|
|
|