|
|
| Position wanted: |
Structural Engineer |
| Job category: |
ConstructionEngineering |
| Objective and Resume Summary: |
|
I am Graduate Civil Engineer from Bangladesh University of Engineering and Technology, Dhaka, Bangladesh.
My Key Qualification are Develop professional skill particularly for Designing, construction supervision and Quality control of construction works of Highway Bridges, (These Include RCC Bridges, Prestressed concrete ‘I’ Girder Bridges, Prestressed concrete Box - Girder Bridge, RCC Box Culverts) High rise buildings, strengthening of existing building against seismic effects etc. also leads a design and construction supervision team of mid-level and junior engineers and Co-ordinate the activities of CAD operators in preparing drawings etc.
|
| Skills: |
|
| Known languages (and levels): |
English-GoodHindi-A little
|
| Type of Employment wanted: |
Full Time
|
| Minimum Yearly Salary in Numbers: |
Unspecified
|
| Current Location: |
Bangladesh, Dhaka |
| Education History, Qualifications & other additional information: |
| Level of Education: |
Unspecified
|
| B.Sc. in Civil Engineering
|
| Work History & Experience: |
| Years of Work Experience: |
No experience |
I worked 15 year as a structural design engineer like,
- Detail Design of 2 Nos. 300m, 1 No. 150m and 1 No. 250m permanent steel bridge on RCC substructure with cast insitu pile foundation under United Nations Office for Project Services at SriLanla.
- Detail design 260m long PC I girder bridge and others 05 Nos. small bridge for Roadtranservice Department, of Azerbaijan.
- Detail design of 6.50 Km long PC girder flyover with pile foundation at Muchak – Mogbazar of Bangladesh.
- Detail design of 750m long (100m span) Prestressed Concrete box girder bridge with well foundation.
- Design of 12 storied training academy cum office building of “Rural Electrification board” Uttara, Bangladesh.
- Design review for the office building of “Department for International Development” of (Uk) in Bangladesh.
- Detail design and feasibility study for Beira Fishing Port at Republic of Mozambique.
- Design of 35m Prestressed Concrete Bridge at Mopipi - Rakops road at Botswana.
- Detail design of 450m Prestressed Concrete Bridge at Bangladesh
- Responsible for site selection & preliminary design of 6.8 Km long PC box girder Prestressed Bridge including foundation design.
- Structural design of a cold storage at Chapai Nawabgonj.
- Design of Jamuna bridge end facilities structure like staff Quartet, Police station, Fire station, Toll Plaza etc. of Jamuna Multipurpose Bridge Project.
- Design of 670m long Prestressed Box Girder Bridge at Bhairab, Bangladesh.
Hydrological & hydraulic design, stability analysis, structural & foundation design and construction supervision of various types of hydraulic structures
- Hydraulic design, stability analysis, structural & foundation design, of 22 vent Hamkura regulator over Hamkura River at Khulna Bangladesh.
- Foundation & Structural Design of 200m steel Railway Bridge over Sangu River, 320m & 240m steel Railway Bridge over Matamuhari River & 150m steel Railway Bridge over Bakkhali River at Bangladesh.
- Prepare detail design of Jetty, sea wall, wave breaker and other infrastructures of Department of fisheries, Govt. of Maldives.
I worked 6 year as a quality control engineer and construction supervision engineer like
- Construction supervision of 75 Nos. Villa and 2 Km long elevated road (Bridge, maximum span length varies 12m 25m) inside the sea, for connecting all the villas from main road at Abu Dhabi, UAE
- Construction Supervision of 2 Nos 300m 1 No. 150m and 1 No. 250m permanent steel Bridge.
- Construction supervision and quality control of 12 Storied training academy cum office building. The job was to confirm the building structures as per requirements of local and British Standards.
- Construction supervision and quality control of retrofit schemes to bring the building hired by DFID for use as their office up to desired safety level was prepared to the satisfaction of the client.
- Construction supervision and quality control of bridge construction activities of Bridge Replacement Project. Provide technical advice to the contractor during construction.
- Construction Supervision of 2 Nos. 100m (span length 25m) steel railway bridge over Turag river (up and down line) at Tongi, Bangladesh.
- Construction supervision of 450m (span length 50m) Prestressed concrete bridge over Arailkhan River on Mawa – Bhanga Road Project at Bangladesh.
- Quality Control of the construction works of 04 storied cold storage.
- Trainer for the training of Thana engineer and construction supervision engineers of contractors for the design procedure, Quality control of civil construction works of pile foundation and substructure, super structure of bridge and water control structures.
|
|
|
|