|
|
| Position wanted: |
Process Engineer |
| Job category: |
Engineering |
| Objective and Resume Summary: |
|
Almost (7) years experience as Process Engineer in oil and gas industries especially in upstream oil & gas projects, both on shore and off shore. Having experience in process engineering design, conceptual design, feasibility study, FEED and detail engineering in on shore and off shore overseas oil and gas projects. Having experience as Facility/Process Engineer in Operation Engineering Team. The experience includes the following duties:
1.Prepare conceptual design, basic engineering, technical preparation for bid and detail engineering either on shore and off shore oil & gas projects
2.Prepare Simulation Mass & Heat balance, Hydraulic pipeline and PSV Network, Heat Exchanger, Process Flow Diagram (PFD), Piping & Instrumentation Diagram (P & ID).
3.Prepare basis of design, Process engineering design, calculation & sizing (topside facilities, wellhead platform, central processing platform, dew point control system, glycol dehydration unit, H2S & CO2 removal unit, well testing, line sizing, vessel, pump, heat exchanger, utilities, etc), Process Datasheet, Mechanical and Instrument data sheet, SAFE CHART, control philosophy, operating manual, start up procedure.
4.Steady state pipeline hydraulic simulation (using Pipeline software).
5.Prepare Flare relief, blowdown, radiation and dispersion calculation / report.
6.Preparation of engineering deliverables includes study report, specification, data sheets,
7.Design fire water distribution system & fire fighting facilities
8.HAZOPS Facilitator for small projects. HAZOPS participant, reviewer and evaluation for big project.
9.Production, Operation, Field, Construction, Commissioning & Start up for oil & gas project
10.Prepare AFE Package (Authorization for Expenditure), request for quotation of vendor package, prepare technical bid Analysis of vendor package.
11.Familiar with Oil & Gas Standard and Code (API, ASME, NFPA, GPSA, ISA, DnV).
12.Familiar with Oil Company Standard and Specification such as: ConocoPhillips, Chevron, Total, Shell, Petronas, CNOOC |
| Skills: |
Almost (7) years experience as Process Engineer in oil and gas industries especially in upstream oil & gas projects, both on shore and off shore.
Computer Literacy :
1.HYSYS, PRO Ii, Chemcad
2.Pipesim, Pipephase, Pipesys
3.Flarenet
4.Htri
5.Flaresim, Fred |
| Known languages (and levels): |
English-GoodRussian-Very GoodOther: Indonesia, Malay
|
| Type of Employment wanted: |
ContractFull Time
|
| Minimum Yearly Salary in Numbers: |
Unspecified
|
| Current Location: |
Indonesia, Jakarta |
| Education History, Qualifications & other additional information: |
| Level of Education: |
Bachelor
|
EDUCATION : Bachelor Degree of Gas & Petrochemical, Chemical
Engineering Department,
Graduated in Aug 2002 from University of Indonesia,
Jakarta, Indonesia. GPA 3.15 (Scale 4.00)
|
| Work History & Experience: |
| Years of Work Experience: |
7 to 10 Years |
Experience Detail :
Sept.2008-Now : MMC-Amec, Malaysia
Company Business : Oil & Gas Engineering Consultant
Position : Senior Process Engineer
Project/ Job : Technical Preparation for Engineering Proposal
Basic Engineering Study for Malikai Deep Water Project (Client: Shell Serawak Berhard, Malaysia)
Preparation for Pre FEED Project
Golshan & Firdowsi On shore Processing Facilities & LNG System (Client: SKSOG Petrofield, Iran) in the phase of review of client documents
FEED Layang Field Development Project
FEED for green field Layang Wellhead Platform 120 MMscfd. Responsible for preparing process design basis, PFD, HMB, P&ID, Safe Chart, Shutdown philosophy, Process Cause & Effect Matrix, overpressure study (relief and blowdown), dispersion and radiation report. Prepare safeguarding memorandum. Prepare and review process data sheet for instrument & mechanical. Checking the adequacy of existing Helang Processing Platform to receive additional gas from Layang Wellhead Platform (checking the line, equipment, relief, blowdown, venting system, etc). Giving input and review pipeline dynamic simulation report (by third party).
Client : Nippon Oil Exploration, Ltd - Petronas.
Location : Layang Field & Helang Integrated Platform, Malaysia
Work Location : Kuala Lumpur, Malaysia
Jul.2007 Aug.2008 : Chevron Pacific Indonesia
Company Business : Oil & Gas Operator Company (on shore Oil Field)
Position : Facility/ Senior Process Engineer Operation Engineering Team
Project/ Job : Area 1-4 Waste Gas Mitigation Project
Conceptual design, process selection, feasibility study, economic analysis, FEED of on shore waste gas mitigation facilities in Duri field. Prepare basis of design, process simulation using HYSYS, steady state hydraulic pipeline simulation using Pipephase, equipment sizing, prepare control philosophy, Pfd & Hmb, P&id, etc. Scope of work 21 Km pipeline (totally from 5 sections), slug catcher, condensate vessel.
Area 8 CVC System Interconnection Line Project
Conceptual design, process selection, feasibility study, economic analysis, back pressure study, FEED & detail engineering to install 20 pipeline interconnection line 2 Km length between CVC system in Area 7. Prepare process simulation and pipeline hydraulic simulation (steady state using PIPEPHASE).
Small Projects Related to Operational Issue
Portable well test package design, jumper line, enclosed flare & incinerator reability issue, back pressure study, pumps trouble shooting, etc (trouble shooting & plant optimization issue). One of HAZOP Facilitator for Operation Engineering Team.
Work Location : Duri Field, Riau, Indonesia
Apr.2006 Jul.2007 : Technip Indonesia
Company Business : Oil & Gas Engineering Consultant
Position : Process Engineer
Project/ Job : North Belut Engineering and Technical Support Services Project
Detail engineering for 315 MMscfd Central Processing Offshore Platform contain of production separator, gas booster-export compressor, MEG regeneration, dew point control unit with Turbo Expander and JT Valve.
Responsible for preparing PFD and P & ID, overpressure study, relief & blowdown, prepare process datasheet for instrumentation: PSV, Control Valves, metering system, etc. Prepare process data sheet for mechanical equipments. Prepare hydraulic calculation. Equipments design : Pumps, Separators, Tanks, etc. Vendor package review. Flarenet simulation for PSV network. HAZOPS participant. Giving input and review dynamic simulation study from third party.
Client : ConocoPhillips Indonesia
Location : North Belut Central Processing Platform
Heera Redevelopment Project Mumbai India
Detail engineering for wellheads offshore platform HI, HJ, HSC & B134A contain of lift gas manifold, production manifold, water injection manifold test separator, crude condensate drum, utility & instrument gas, and vent stack.
Responsible for prepare deliverable list and job distribution. Prepare PFD and P & ID, overpressure study, relief & blowdown, hydraulic calculation, firewater hydraulic calculation, process datasheet for instrumentation: PSV, Control Valves. Prepare steady state offshore pipeline simulation using PIPESIM. Prepare process data sheet for mechanical equipments, equipments design: Pumps, Separators, Tanks. Etc.
Client : PT Sempec Indonesia
End User : ONGC
Location : Mumbai, India
Work Location : Jakarta, Indonesia
Aug. 2005 March.2006 : Pt. Arindo Semesta
Company Business : Oil & Gas Engineering, Procurement & Construction
Position : Process Engineer
Project/ Job : Dew Point Control System Project
Detail engineering for 100 MMscfd Processing Platform contain of Production separator and dew point control unit using JT Valve
Responsible for prepare simulation for heat and material balance, PFD and P & ID, prepare process engineering calculation: line sizing, vessel sizing, relief capacity, SAFE Chart, process data sheet, mechanical data sheet for vessel.
Client : Cnooc Ses Ltd
Location : Zelda F Platform & Zelda PC Platform, Indonesia
Low Tension Natural Gas Compressor (EPC Tender/Proposal)
Responsible for technical preparation. Prepare simulation for heat and material balance. Prepare PFD, Heat & Material Balance and P & ID. Prepare process datasheet for heat exchanger, mechanical data sheet for vessel and instrument data sheet. Prepare technical proposal and commercial proposal.
Client : PT Pindo Deli Pulp & Paper
Location : Unit Kerawang-2, Indonesia
CO2 Removal & Glycol Dehydration Unit (EPC Tender)
Prepare CO2 Removal P & ID, calculation for determining glycol concentration and glycol circulation rate. Prepare simulation for glycol dehydration unit. Prepare PFD and heat & material balance, P & ID, process engineering calculation: contactor diameter sizing, vessel sizing, line sizing, relief capacity, pump sizing, etc. Prepare mechanical & process data sheet for vessel, heat exchanger, filter, structure packing. Prepare RFQ for mechanical equipments, vessel, heat exchanger, filter, structure packing, etc.
Client/End User : PT Insani Mitrasani Gelam / Energi Mega Persada
Location : Jambi, Indonesia
Work Location : Jakarta, Indonesia
Oct. 2004 Jul.2005 : Pt. Istech Resources Asia
Company Business : Oil & Gas Engineering & Management Consultancy Services
Position : Process Engineer
Job : Central Gathering Station 10 Retrofit Project, Heavy Oil OU
As built P & ID Oil Treating Plant, Water Treatment Plant I, Water Treatment Plant II, Slop Oil & Foul Production Plant, Sand Removal Plant and Utilities (water, chemical injection, steam & air). Study CGS-10 operation problem, conduct HAZOPS for CGS-10 modification. Prepare marked up P & ID of CGS-10 modification & equipments datasheet
Pager Gathering Station Project, SLN-Bekasap Operation
Responsible for Basic Design and Preliminary Design of Pager Gathering Station. Prepare simulation, PFD, HMB & P&ID. Prepare process engineering calculation: line sizing, vessel (two phase) sizing, tank sizing, vent stack sizing, pump sizing, NPSH calculation, hydraulic calculation, PSV & venting capacity, utility demand calculation (air compressor sizing), etc.
Pungut Gathering Station, Water Flood Project, SLN-Bekasap
Responsible for Detail Engineering (brown field project). As built Oil Treating Plant Pungut Gathering Station. Do Pungut Gathering Station # 2 facility assessment and prepare facility assessment report. Prepare simulation, Heat & Material Balance for Pungut Gathering Station #2, Oil Treating Plant and Water Flood Plant.. Assist process selection for Oil Treating Plant. Prepare PFD & P & ID. Prepare process engineering calculation: line sizing, vessel (two phase & three phase) sizing, tank sizing, vent stack sizing, pump sizing, NPSH calculation, hydraulic calculation, PSV & venting capacity, gas blanketing capacity, utility demand calculation (air compressor sizing).
Client : Chevron Pacific Indonesia
Work Location : Duri, Riau, Indonesia
May. 2004 - Sept. 2004 : Pt. Rekayasa Engineering
Company Business : Oil & Gas Engineering Consultant
Position : Process Engineer
Job : FEED and Detailed Design Engineering for Blanket Engineering Service that includes modification works of gas onshore facilities owned by VICO Indonesia. Assist as field engineer for start up & commissioning some projects such as: Mutiara Beras Water Injection, Mutiara LP Compressor, rental compressor, etc.
Client : VICO Indonesia (a subsidiary of Bp eni)
Work Location : Mutiara, East Borneo - Indonesia
Sept. 2003 - May. 2004 : Pt. Natuna Engineering Internusa (kota Minyak Int.)
Company Business : Oil & Gas Engineering, Procurement & Construction
Position : Process Engineer
Job : Central Gathering Station & Condensate Expansion Facility Area 4
Responsible for Detail Engineering, Construction, Commissioning and Start up. Scope builds new one FWKO Tank, one Wash Tank & Condensate Line. Prepare PFD, Heat & Material Balance, P & I D, Hydraulic Calculation Engineering Manual, Operating Manual, General Commissioning Procedure. Prepare Job Safety Analysis for Commissioning and Start Up. Training CGS 4 Expansion facility for operator.
Area 9 CVC Cooler & 8/9 Area H2S Mitigation Project
Responsible for Detail Engineering, Construction Commissioning and Start Up. Prepare PFD, Heat & Material Balance, P & I D, Hydraulic Calculation, Engineering Manual, Operating Manual and Maintenance Manual for Area 9 CVC Cooler Facility, General Commissioning Procedure, Training Area-9 CVC cooler & Area-8/9 H2S Mitigation for engineering and operator.
Client : Chevron Pacific Indonesia
Work Location : Duri, Riau, Indonesia
Oct. 2002 - Aug. 2003 : Pt Tripatra Engineering & Constructor, Indonesia
Company Business : Engineering Consultant & EPC Contractor
Position : Process Engineer
Job : Ujung Pangkah Gas Plant Development (EPC Tender/Technical Preparation)
Responsible for Preliminary Design and Preparation of Technical Document (on shore gas plant). Prepare and review Feed Pfd, P & I D, Prepare preliminary design PFD and P & ID of H2S Removal System. Prepare design, calculation, UFD and P & ID of fire water distribution system and fire fighting facilities. PSV network simulation. Prepare Request for Quotation (RFQ), scope of work, scope of supply, etc. Prepare Technical Bid Analysis for vendors package.
Client : Amerada Hess Indonesia
Location : Gresik, Jawa Timur
Sumbagsel Gas Plant Development Project (EPC Tender/Technical Preparation)
Responsible for Preliminary Design and Preparation of Technical Document (on shore gas plant) : preliminary PFD and P & ID, Prepare process datasheet, Assist preparation of instrument and mechanical datasheet
Client : PERTAMINA
Location : Sumatra Bagian Selatan, Indonesia
Work Location : Jakarta, Indonesia
|
|
|
|