| Position wanted: |
Project engineer, Project controller, Planning Engineer, Bid Estimator |
| Job category: |
EngineeringGas IndustryOil Industry |
| Objective and Resume Summary: |
|
Objective :
To apply and pursuing the best work practices
Resume summary :
1. Site engineer – mechanical
2. Project control
3. Task force engineer - mechanical & project control
4. Procurement coordinator & bid estimator
5. Task force engineer - mechanical & project control
6. Task force engineer - mechanical & bid estimator
7. Task force engineer - mechanical & project control
8. Task force engineer - mechanical & bid estimator
9. Task force engineer - mechanical & project control
10. Task force engineer - mechanical & bid estimator
11. Project engineer – mechanical |
| Skills: |
Project engineering, Project controller, Planning engineering, Bid estimation |
| Known languages (and levels): |
English-GoodOther: Bahasa
|
| Type of Employment wanted: |
ContractFull Time
|
| Minimum Yearly Salary in Numbers: |
4800 USD
|
| Current Location: |
Indonesia, Jakarta |
| Education History, Qualifications & other additional information: |
| Level of Education: |
Bachelor
|
Education :
- Trisakti University, Environmental Engineering, 1990 – 1996, Jakarta, Indonesia, Bachelor degree
- Trisakti University, Petroleum Engineering, 1999 – 2001, Jakarta, Indonesia, Bachelor degree (not completed)
- Institut Sains & Teknologi Nasional, Mechanical Engineering, 2008, Jakarta, Indonesia, Master degree (post poned)
Course / Training :
2008 Venture Gulf Training Center Doha, Qatar
H2S / B.A. Awareness
2008 APG Jakarta, Indonesia
Pipe Stress Analysis
2008 EDP Jakarta, Indonesia
Primavera 6 (Planning, Scheduling, Resources management)
2007 SAP Edugate Jakarta, Indonesia
SAP Fundamental
2004 PT. Mesitech - PT. Caltex Pacific Indonesia Duri, Indonesia
Submersible Pump System Installation
2002 LPPM – PT. Meta Epsi Jakarta, Indonesia
Project Management
2000 PT. Mesitech Jakarta, Indonesia
In house training for HSE management & ISO 9001 application
1996 Mechanical Eng. Dept. Universitas Indonesia Jakarta
Preventive Maintenance
|
| Work History & Experience: |
| Years of Work Experience: |
10 to 15 Years |
June 2008 – present QIPCO - Black Cat Engineering & Construction w. l. l , Qatar
Project : EPIC for Replacement of Glycol Separator and Installation of Air cooler at NGL-2 Mesaieed, Qatar Petroleum
Position : Project Engineer - Mechanical
Responsibilities :
- Preparing project method statements.
- Preparing – coordinating work permit and conduct clarification to QP engineering & NGL control room.
- Planning, tracking – controlling activities.
- Estimating, preparing material take off.
- Performing construction activities and project engineering.
2006 – 2008 PT. Mesitech Jakarta, Indonesia
User / owner : PT. Badak NGL. CO., Pertamina & Production Sharing Contractor.
Position : Task force Engineer - Mechanical & Bid estimator
Responsibilities :
-Planning-scheduling project work detail of bid.
- Preparing take off sheet of material, equipment & tool, manpower, consumable.
- Preparing engineering and cash flow calculation of bid proposal.
- Preparing and fill in technical and commercial aspect of bid proposal.
- Conducting bid clarification (technical & commercial aspect) to user, vendor & subcontractor.
- Assisting project engineering and the execution.
2004 – 2006 PT. Mesitech Duri, Riau, Indonesia
Project : Maintenance service of Production Facilities & Drilling in Bekasap Operation area. PT. Caltex Pacific Indonesia – Chevron Texaco IBU.
Scope of work : Fabrication, Construction, Maintenance work, Well work & Drilling Assistance, Well submersible pump installation
Position : Task force Engineer - Mechanical & Project Control.
Responsibilities :
- Making and controlling actual cash flow.
- Making Project Completion Strategy, including HES program.
- Assisting in estimating work order into job step sequence.
- Assisting in examining completed job step sequence of service order, and approve them for invoicing purpose.
- Planning-scheduling detail of work execution, tracking work execution, making catch up / recovery plan.
- Determining number and specification requirement of manpower, Equipment & Tool, consumable.
- Making project progress report.
- Coordinating execution of work to Field Maintenance Team, Well Work & Drilling, Reliability Equipment Maintenance, Submersible Pump System PT. Caltex Pacific Indonesia
- Supervising 1 person Operation officer, 1 person Sr. Planner / controller, 1 Person Transportation officer (light vehicle & heavy equipment), 1 person mini warehouse officer.
2004 PT. Mesitech Jakarta, Indonesia
User / owner : Oil & gas area : PT. Badak NGL. CO., Pertamina & Production Sharing Contractor.
Position : Task force Engineer - Mechanical & Bid Estimator
Responsibilities :
- Planning-scheduling project work detail of bid.
- Preparing take off sheet of material, equipment & tool, manpower, consumable.
- Preparing engineering and cash flow calculation of bid proposal, conduct clarification to Operation manager for appraisal and approval.
- Preparing and fill in technical and commercial aspect of bid proposal.
- Preparing & fill in Preliminary Questioner (PQ) & Health Safety Environment (HSE) aspect of bid pre-qualification proposal.
- Conducting bid clarification (technical & commercial aspect) to vendor & subcontractor.
- Assisting project engineering and the execution.
2003 PT. Mesitech Bontang, East Kalimantan, Indonesia
Project : Permanent Repair of Train A Plant #1 CO2 Removal Pressure Vessel (A1-C-2). PT. Badak NGL. CO., Bontang – East Kalimantan.
Position : Task force Engineer - Mechanical & Project Control
Responsibilities :
- Making and controlling actual cash flow.
- Planning-scheduling detail of work execution, tracking – controlling project during execution, and making catch up / recovery plan.
- Determining number and specification requirement of material, equipment & tool, manpower, consumable.
- Making project progress report.
- Coordinating execution of work to Stationary Equipment Section & Inspection Section PT. Badak NGL. CO.
- Supervising 2 persons mechanical supervisors, 1 person Planner / controller, 1 person welding inspector / QA/QC, 1 person project control, 2 subcontractors (NDE & heat treatment service).
2002 PT. Mesitech Bontang, East Kalimantan, Indonesia
Project : Maintenance of Natural Gas Liquefaction Plant. PT. Badak NGL. CO., Bontang – East Kalimantan.
Scope of work : Mechanical maintenance of stationary plant equipment of Train A – H, Utilities I – 2, LNG & LPG loading facility, Fabrication of piping & structure, Workshop (welding, valve, machining).
Position : Task force Engineer - Mechanical & Project Control
Responsibilities :
- Making and controlling actual cash flow.
-Assisting in estimating work order into job step sequence.
- Assisting in examining completed job step sequence of service order.
- Assisting in planning-scheduling detail of work execution, tracking - controlling project execution, making catch up / recovery plan.
- Determining number and specification requirement of material, equipment & tool, manpower, consumable.
- Making project progress report.
- Coordinating execution of work to Maintenance Section PT. Badak NGL. CO.
- Supervising 1 person Mechanical coordinator, 1 person Sr. Planner/ controller.
- Estimating technical and commercial aspect for several bid performed by PT. Badak NGL. CO. & Pertamina production sharing contractor in East Kalimantan area.
2002 PT. Mesitech Bontang, East Kalimantan, Indonesia
Project : Replacement of Train H Plant #4 Propane Desuperheater (H4-E-1 A/B), Train F Plant #4 MCR Intercooler & Aftercooler (F4-E-5 A/B & F4-E-6 A/B).
PT. Badak NGL. CO., Bontang – East Kalimantan.
Position : Task force Engineer – Mechanical & Project Control
Responsibilities :
- Making and controlling actual cash flow.
- Planning-scheduling detail of work execution, tracking – controlling project during execution.
- Determining number and specification requirement of material, equipment & tool, manpower, consumable.
- Performing project engineering, included making lifting work method & conduct technical clarification to Project Section PT. Badak NGL. CO.
- Making project progress report.
- Coordinating execution of work to Project Section PT. Badak NGL. CO.
- Supervising 2 persons mechanical supervisors, 1 person Planner /controller, 1 person rigging specialist, 1 person welding inspector / QA/QC, 1 person project control, NDE subcontractors.
2001 PT. Mesitech Jakarta, Indonesia
User / owner : PT. Badak NGL. CO., Pertamina & Production Sharing Contractor.
Position : Task force Engineer - Mechanical & Bid Estimator
Responsibilities :
- Planning-scheduling project work detail of bid.
- Preparing take off sheet of material, equipment & tool, manpower, consumable.
- Preparing engineering and cash flow calculation of bid proposal.
- Preparing and fill in technical and commercial aspect of bid proposal.
- Preparing Health Safety Environment (HSE) aspect of bid pre-qualification proposal.
- Conducting bid clarification (technical & commercial aspect) to vendor & subcontractor.
- Assisting project engineering and the execution.
2001 PT. Mesitech Suralaya, West Java, Indonesia
Project : Catch up program of Retubing High Pressure Heater #5 PT. Indonesia Power UBP Suralaya – West Java.
Position : Task force Engineer – Mechanical & Project Control
Responsibilities :
- Making & controlling actual cash flow.
- Planning-scheduling detail of work execution, tracking – controlling project execution, making catch up / recovery plan.
- Determining number and specification requirement of material, equipment & tool, manpower, consumable.
- Performing project activities and engineering, included making lifting work method & designing reinforce structure, conduct technical clarification to engineering section PT. Indonesia Power for approval.
- Making project progress report.
- Coordinating execution of work to PT. Indonesia Power.
- Supervising 3 persons supervisors (fabrication, assembling, rigging), 3 subcontractors (Fabricator, NDE & heat treatment service).
2000 PT. Mesitech Jakarta, Indonesia
Position : Procurement Coordinator & Bid Estimator
Responsibilities :
- Coordinating to Engineering section for determining number and specification of material, equipment & tool, consumable.
- Performing vendor selection and evaluation.
- Making appraisal to vendor quotation, and selecting the best price of quotation.
- Conducting technical clarification with engineering section to selected vendor for technical and commercial aspect to get a final best price.
- Preparing Purchase Order document & making vendor payment schedule.
- Planning – scheduling & tracking material dispatch / freight.
- Assisting bid proposal calculation for engineering section.
- Supervising 2 persons procurement officer (foreign, local).
1999 PT. Mesitech Bontang, East Kalimantan
Project : Plant #1 Upgrade, Train B Piping Replacement & Train F Lean MDEA Exchanger (F1E-4A-F) Demolition. PT. Badak NGL. CO., Bontang – East Kalimantan.
Position : Task force Engineer - Mechanical & Project Control
Responsibilities :
- Making and controlling actual cash flow.
- Planning-scheduling detail of work execution, tracking – controlling project execution, making catch up / recovery plan.
- Determining number and specification requirement of material, equipment & tool, manpower, consumable.
- Making project progress report.
- Performing project activities and engineering, included making shop and as built drawing.
- Coordinating execution of work to Life Extension Project Train A – B PT. Badak NGL.. CO.
- Supervising 2 persons supervisors (Mechanical, Civil), 1 person welding inspector / QA/QC, 1 NDE subcontractor.
1998 – 1999 PT. Mesitech Bontang, East Kalimantan, Indonesia
Project : Maintenance of Natural Gas Liquefaction Plant. PT. Badak NGL. CO., Bontang – East Kalimantan.
Scope of work : Maintaining stationary plant equipment on Train A – G, Utilities I – 2, LNG & LPG loading facility, Fabricating & erecting piping & structure.
Position : Project Control
Responsibilities :
- Making and controlling actual cash flow, and report them to Site manager.
- Assisting in estimating work order into job step sequence.
- Assisting in examining completed job step sequence of service order, and approve them for invoicing purpose.
- Assisting in planning-scheduling detail of work execution, tracking - controlling project execution.
- Determining number and specification requirement of material, equipment & tool, manpower, consumable.
- Coordinating execution of work to Maintenance Section PT. Badak NGL. CO.
- Supervising 1 person Sr. Planner / controller.
1996 – 1997 PT. Mesitech Jakarta, Indonesia
Project : Fire Protection System. Pondok Indah Hospital Extension (3rd basement – 8th floor).
Scope of work : Fabricating & erecting sprinkler and hydrant piping system, Installing fire alarm instrument system.
Position : Site Engineer - Mechanical
Responsibilities :
- Planning-scheduling work detail.
- Determining number and specification requirement of material, equipment & tool, manpower, consumable.
- Performing construction activities and project engineering, included making shop and as built drawing.
- Making project progress report.
- Coordinating execution of work to construction management.
- Supervising 2 persons Supervisors (Mechanical, instrument). |
|
|
|