Profile:
Qa/qc in welding with progressive experiences in the Inspection sector at various International & national Company. Employment within the Oil & Gas, Power Plant, Structural Steel, Pipe Mill, Floating Production Storage Offloading FPSO (Offshore), Platform Modification (Offshore), Refinery and Pressure Vessel Sectors.
Worked in a variety of capacities including Operation Management, NDE Testing, Construction & Fabrication, Certification, Quality Control Inspector, and Clients Representative Inspector
Objective:
To obtain a responsible position and give contribution in a company, where my experiences, relationship, accomplishment and proficiency will allow me the opportunity for grows and improves.
Experiences and expertise
Inspection, testing and certification
1.Capable in Quality control of fabrication, installation, quality control/assurance of non-destructive test for oil & gas production, Floating Production Storage Offloading FPSO, off shore platform, pressure vessels, heat exchanger, boiler, pipeline, piping welding inspection, OCTG inspection, Wellhead & Christmas tree inspection.
2.Capable for technical review of document, WPS, drawing and field inspection of pressure vessels, storage tank, process piping, pipeline, flow line and off shore platform.
3.Familiar with international standard and codes such as: American welding Society (AWS), American society of Mechanical engineer (ASME), American Petroleum Institute (API), ANSI, British Standard, NACE and other codes.
4.Capable to operate non-destructive test non-radiation and interpreting film of Result Radiographic test
Management System
Development, review, implementation and auditing of:
-ISO 9001:2008, Quality management system latest edition
-OHSAS 18001:1999, Occupational health and safety management system
-Indonesia Industrial Safety and Health regulation Ministry of Manpower requirement No. Per 05/MEN/1996, Health and Safety management system (Smk3)
Professional Society Member:
-singapore Welding Society member No. Sws F 2191
-certification Body for Indonesia Inspection Company Association (Bs-apitindo) as Assessor
|
| Skills: |
|
| Known languages (and levels): |
English-Very GoodFrench-A littleArabic-A littleChinese-A littleOther: Malay and Indonesia
|
| Type of Employment wanted: |
Full Time
|
| Minimum Yearly Salary in Numbers: |
75000 USD
|
| Current Location: |
( Confidential ) |
| Education History, Qualifications & other additional information: |
| Level of Education: |
Bachelor
|
Education Background
- 2003 Bachelor in Planology Engineering Pakuan University - Indonesia
- 1992 Graduated Senior High School Majoring in Biological Science
Professional training & seminar attended:
-cswip 3.1 certification course on 13 to 18 April 2009 Twi Uk - Twi Sea Kuala Lumpur.
-Quality Management System QMS Upgrading Iso 9001:2008 by Isc Rabqsa Australia, February 2009. Cert. No. QM-09237
-STOP ( Safety Training Observation Program) conducted by HSEQ Prosafe Production Services
-PTW Permit to Work training in FPSO installation by Prosafe Production Services Pte.Ltd
-BOSIET including EBS, Fire fighting & Self rescue and HUET with EBS conducted by SMTC Global Singapore approved OPITO
-Train to Trainer course by DTT Malaysia and DUJ Batam June 2008
-Improving Quality of Welding Based on International Standard (International Institute of welding IIW Guidelines) by Germany Welding Institute Mannheim and University of Indonesia.
-Internal Audit Quality Management System ISO 9001 Training, Conducted by PT.GKS
-Internal Audit OHSAS 18001:1999 Occupational Health and Safety Management Systems conducted by PT.GKS
-Radiographic Interpretation Course CSWIP 3.4
TWI Kuala Lumpur August 28 thru Sept 1, 2006, Certified as CSWIP 3.4 Inspectors
CSWIP CERT. NO. 26527
-Awareness Iso 9001: 2000, By Velosi International Sdn Bhd, Malaysia, August 21, 2005
-Expediting In house Training, October 2003, Mody Inter Indonesia
-welding Inspector Course, July 14 to September 14, 2002, Certified as Welding Inspector
-Magnetic Particle Testing Re-certification, August 22, 2002,Certified as MT Level II (two) ASNT Inspector
-Ultrasonic Theoretical and Practical Course for All Configurations, September 12 to 27 1994, Certified as UT Level II (two) All Configuration ASNT.
-Magnetic Practical Testing Training Course. November 29 to Dec 11, 1993,
Certificate and Certified as MT Level II ASNT Inspector.
-Dye Penetrant Testing Training Course for Industrial Application, October 25 to Nov 10, 1993, Certified as Dye Penetrant Level II ASNT Inspector
|
| Work History & Experience: |
| Years of Work Experience: |
10 to 15 Years |
Prosafe Production Services Pte. Ltd
International Business Park - Singapore
August 2008 to Present
Position ; Quality Control Supervisor report directly to Project Quality Manager
Project Assignment
-as QA/QC Supervisor Espoir Ivoirien FPSO Upgrade Project phase 1, Ph. 2 and Ph. 3. As per DNV classification, Asme Viii, Asme B 31.3 , AWS D1.1 and Client specification.
Ivory Coast West AFRICA.
PT. BUREAU Veritas Indonesia
Jakarta Indonesia
June 2008 August 2008
Position ; Inspector representative
Project Assignment
-as Client Representative on behalf Total E&p Indonesie for Gas Fuel Package Tunu North Ph. 11 fabrication as per ASME VIII and Client specification at SM0E & Profab Batam.
-As Client representative ENI Australia for Pressure Vessels Black Tip Project as per Australian standard AS 2885.1 applies for design & fabrication code of Pig receiver at PT Heat Exchanger Indonesia Batam.
PT. DUA Utama Jaya
Batam Indonesia
Nov. 2007 to June 2008
Position ; Senior Inspector ,Inspection coordinator, Welding Engineer
Project Assignment
-as Client Representative Inspector on behalf Prosafe Production Services Pte. Ltd for Espoir Ivoirien Project 183-V056, Module and Pressure Vessels (Separators, Glycol Contactor, Suction Scrubber and Piping) fabrication as per DNV classification, Asme Viii , Asme B 31.3 Power Piping and Client specification at Profab and Transalindo Batam.
-As QC Project coordinator for Lifting test Heat exchanger cooler Su Tu Vang Jord International Pte Ltd.
-As Third Party Inspector MIGAS for WPQT and WQT Total Tunu Phase 11 & 12 Construction and fabrication of structural as per AWS D1.1, Total spec. Gs Str 301, Gs Str 201 and Migas regulation at Sembawang Marine Offshore Engineering, Batam
Pt. Gerbang Krenindo Sakti
Jakarta Indonesia
Dec. 2006 to Oct. 2007
Position : Senior Inspector and Operation Manager
Project Assignment
-as TUV Rheinland Indonesia Inspector Representative for Schneider Kessel Germany of Waste Heat Recovery Boiler at Asahi Mas Chemical Plant as per En 12952 En 12953 and Pressure Equipment Directive.
-As Third Party Inspector MIGAS for WPQT and WQT Total Tunu Phase 11 & 12 Construction and fabrication of structural as per AWS D1.1, Total spec. GS STR 301, GS STR 201 and Migas regulation at Sembawang Marine Offshore Engineering, Batam
-As Third Party Inspection for fabrication of casing servo Hydraulic Pump Jatiluhur Power Plant
-As Third Party Inspector for TUV Rheinland Indonesia , for Resistance Blast film glasses Inspection for Germany International School, Indonesia Project.
-As Third Party Inspector for TUV Rheinland Indonesia , Certification & Inspection for Germany International School Installation , Indonesia Project.
PT. JAVA Velosi Mandiri (velosi Intl Sdn Bhd)
Jakarta Indonesia
March 2005 to November 2006
Position : Senior Inspector & Operation Manager
Project Assignment
-as Inspection Coordinator for BP Tangguh Dcu 0065, Oil Country Tubular Goods, Wellhead Equipment and X-Mas Tree Drilling Equipment Project. As per API 5CT and API 6A
-As QC Client Representative / seconded Behalf Biothane Asia Pasific BV Netherland for BP Zhu Hai EGSB Settler fabrication include FRP Filter. As per Aws D1.1 & client spec.
-As QC Representative Coordinator / seconded behalf Hyundai Engineering for pressure Vessels Suban Phase 2 Conoco Phillips project. As per ASME sect. VIII and Client spec.
-As Client Inspector representative KOC for OCTG project at Imeco Inter Sarana batam, Hydrill Csg 22 7/8 R3.
-As Client Inspector Representative /seconded for Pressure Vessel inspection for KBR Escravos project. As per ASME sect. VIII and Client spec.
-As QC Client Representative / seconded behalf Goro Nickel Australia for Fiber glass Reinforced Pipe Vinylester Piping Systems Project as per 15 LR App. B, ASTM D2583, D2584 and client specGCT01-000-8440-SP006
PED (Pressure Equipment Directive)
-As QC Client Representative behalf Biothane Asia Pasific BV Netherlands for EGSB Settler fabrication include Fiberglass filter As per AWS D1.1 & client spec.
-As Client Inspector Representative for Pressure Vessel inspection for Agip KCO Kazakhstan, Petrofac JI 176 Kashagan Development project. As per ASME sect. VIII and Client spec.
PT. MODY Inter Indonesia (moody international)
Jakarta Indonesia
February 2005 to March 2005
Position : Qa/qc Inspector
Project Assignment
-shell Refinery Geelong Australia Ltd as Client inspector Representative/seconded for Catalyst Cooler E 5311 A Fabrication, . As per Australian Standard As/nzs 1210 Specification for Pressure Vessels, Client Spec. DEP.31.22.10.32 GEN. Vendor Jord International Australia
-Merla sakti Abadi as QA/QC inspector for Kodeco Energy Ltd. Gas Delivery Expansion Hook Up project onshore and off shore. As per Ansi B 31..3 Process Piping Specification.. Location KE-5 CPP Central Process Compressor Madura offshore North East Java Sea
Pt. Citrabuana Indoloka - Intertek
Jakarta Indonesia
July 2004 to December, 2004
Position : Qc Inspector
Project Assignment
-rekayasa Persada Joint venture Rekayasa Industri IKPT as client inspector representative for Kujang Plant 1B Ammonia Urea Bridges Strengthening Structural Project as per AWS D1.1 structural specification, Cikampek West Java
-Sekayu Bina Drilling as Inspector supervisor for drilling rigs hoisting and equipment certification including air compressors and pressure vessels as per Api 617, Api 8a-8c, Api 11c and Asme Viii. Cirebon-West Java
-Dharma Subur Satya as QC/ NDT inspector for Migas Crane & heavy Equipment Certification for BP Tangguh. As per AWS D1.1 Structural Specification.
PT. MODY Inter Indonesia (moody International)
Jakarta Indonesia
January 2003 to June 2004
Position : Qc Inspector
Project Assignment
-shell Eastern Petroleum Pte. Ltd Singapore as client inspector representative/seconded for Air Cooled Heat Exchanger Hds4 Revamp Project as per Asme Viii. Vendor Jord international c/o PT. Surya Besindo Sakti Cikande, Serang Banten, Indonesia
-J Ray Mc. Dermott as client inspector representative for Total Peciko project BDF Platform structural as per AWS D1.1 structural specification, vendor Punj Lloyd Indonesia c/o CHC Cigading Habeam Cilegon West Java.
-Chicago Bridge and Iron (CBI), Dubai UAE as client inspector representative for Nigeria LNG plus pipeline support shoes project as per AWS D1.1, vendor Binder Engineering Australia C/O Binder Indonesia.
-Technip Coplexip c/o Technip Indonesia as client resident inspector representative for Conoco Phillips BBSD Project, Malong 22 Mbf - 001 Slug Catcher Skid fabrication as per ASME sect. VIII pressure vessels specification at Sanggar Sarana Baja, Jakarta.
-Spie Capag Lucas JV, Adelaide Australia as client inspector representative for Pressure vessels Horizontal gas filter Sea Gas Pipeline lorna Minerva Adelaide Australia project, vendor Jord International c/o Surya Besindo Sakti Serang - Banten
-Conoco Phillips as Client inspector representative for Block B Subsea Development Belida project various valves inspection at Crane Indonesia, Cikarang West Java.
-Kellogg Joint Venture, UK England as client inspector representative for project pipeline pipe support, PTFE slide plate and acoustic plate of Nigeria LNG plus, Egypt-Damietta segas project, Binder Engineering Australia C/O Binder Indonesia, Bekasi West Java.
-Technip Coplexip Paris France c/o Technip Indonesia as client representative inspector for Conoco Phillips BBSD material receiving verification at PT. IMSF Jakarta.
-PT. Mc Dermott Indonesia as client inspector representative for various project at Jakarta Area such as Valve Inspection at PT. Crane Indonesia, Chatodic Protection Inspection at PT. Southern Tri Star, Cikarang
Pt. Rizky Aldita Nuraga
Bogor Indonesia
March 1997 to 2002
Position ; Qc Inspector / NDE Coordinator
Project Assignment
-pt. Southern Tristar, for Clough Offshore West Seno Deep Water Project
-Pt. Patra Drilling Contractor Balikpapan East Kalimantan.
-Pt. Binder Indonesia, Bekasi for Kellog Joint Venture Nigeria LNG, Chicago Bridge and Iron project
Pt. Budikarya Nastiti
Jakarta Indonesia
January 1996 to Dec. 1996
Position : Ndt Level II Multidiscipline Inspector
Project Assignment
-coordinator for Pressure vessel Re-Certification Pt. Atlantic Richfield Indonesia (arco) East Area North West Java Offshore
Pt. Bixindo Utama
Surveyor and Inspection Services
October. 1992 to Dec. 1995
Position : Ndt Level II Multi discipline Inspector
QC / NDT Level II Inspector for various project such as PT PAL for Arco CCO Monopod platform project, Patra drilling contractor for Unocal East Kalimantan, Nippon Steel Batam, Mc Dermott Indonesia Batam, Barata Indonesia Surabaya and ARCO Indonesia North West Java Offshore.
|
|
|
|