Project Experience:
Project 9: M/s Petroleum Development Oman LLC (PDO)
Muscat, Oman
Period : May’07 to till date
Responsibilities:
Project Brief: DD for Harweel PC Laboratory
• Working as Design Electrical Engineer and set up the Oil and Gas Design field. Project scope includes detail design for PC Laboratory at Harweel station instigated by PDO. Involved in overall electrical design & preparation of single line diagram, earthing, cable tray and cable trench/routing layouts, Cable sizing / Voltage drop, preparation of cable schedule and material take –off
Project Brief: Qarnalam Steam Project (off plot)
• Working as Design Electrical Engineer. Project scope involved detailed design for the Qarnalam steam injection Project at Qarnalam instigated by PDO. Involved in preparation of 33kV OHL for steam injection wells, Aquifer wells, Raw water wells, single line diagram for LV and Utility power distribution, earthing, CP scope of work and voltage drop calculation.
Project Brief: FEED for Thuleilat 132kV Substation
• Worked as Design Electrical Engineer. Project scope includes Front end design for 132kV Substation at Thuleilat instigated by PDO. Involved in 132kV OHL, 33kV substation, 33kV OHL preparation of single line diagram, earthing, cable tray and cable trench/routing layouts, Cable sizing / Voltage drop, preparation of preliminary material take –off
Project 8: M/s Petroleum Development Oman LLC (PDO)
Muscat, Oman
Period : Mar’06 to April’07
Responsibilities:
• Worked as Design Electrical Engineer and set up the Oil and Gas field.
Project Brief: DD for HPG flowlines at Saih Rawl
• Worked as Design Electrical Engineer. Project scope includes detail design for Gas wells at SaihRawl instigated by PDO. Involved in System study for HPG wells, UPS load study, preparation of 660V UPS DB & feeder pillar single line diagram, earthing, cable tray and cable trench/routing layouts, Cable sizing / Voltage drop, preparation of cable schedule and material take –off
Project Brief: DD for Power supply to Chiller at MAF.
• Worked as Design Electrical Engineer. Project scope includes detail design for Power supply to chiller at MAF instigated by PDO. Involved in RMU extension, Transformer installation , preparation of all equipments specification & feeder pillar single line diagram, earthing and cable trench/routing layouts, Cable sizing / Voltage drop, preparation of cable schedule and material take –off
Project Brief: DD for Thamoud Pipeline protection
• Worked as Design Electrical Engineer. Project scope includes detail design for Thamoud Pipeline protection at Thamoud instigated by PDO. Involved in 33kV OHL, Auto Recloser, IFB panel installation, 33kV OHL route survey, preparation of single line diagram, earthing, cable trench/routing layouts and preparation of preliminary material take –off
Project Brief: Sohar Aluminium Smelter Project
• Worked as Design Electrical Engineer. Project scope involved detailed design for the Sohar Aluminium Smelter Project. Involved in preparation of single line diagram for Lighting & small power installations, HVAC installation, lighting calculation, small power layouts, earthing, lightning protection design, conduit and cable tray design and voltage drop calculation.
Project 7: M/s Reliance Industries Ltd,
Hazira, Gujarat
Period : Dec’04 to Feb’06
Responsibilities:
• Worked as a Electrical Design Engineer and set up the new Petrochemical plant.
Project Brief: FEED for PTA -3 Plant.
• Worked as a Electrical Design Engineer. Project scope includes Front end design for 33/6.6kV Substation at Hazira plant by RIL. Involved in 33/6.6kV substation, preparation of single line diagram, earthing, cable tray and cable trench/routing layouts, Cable sizing / Voltage drop, preparation of preliminary material take –off
Project 6: M/s Bhoruka Power Corporation Ltd, (Transmission Line Project)
Bangalore
Period : April’03 to Nov ’04
Responsibilities:
• Worked as a Senior Engineer and set up the new construction site for Transmission Line
• 11kV Double circuit Transmission Line, Substation to Mini Hydel Power plant 2*1.75MW In between area Tower(A,B,D Type) erection , Pole, guarding pole erection Inspection of Stringing works, In Substation 800A VCB,11kV/110v PT ,200-400A /1A CT ,9kV 10kA, 3.3kV/11kV 2.7MVA Transformer erection, substation Earth mat, Tower Earthing, All Instrument Ear thing Inspection, preparation of As built ,Contractor bills checking, Land Compensation works and Co-ordination with Clint.
Project 5: M/s Embassy Orchid. (Multistoried Building)
Bangalore
Period : May’02 to March’03
Responsibilities:
• Worked as an Site In charge and set up the new construction site for multistoried building
•Planned and conducted preventive materials, tools, safety class taken, planning schedule
Preparation, Contractor bills checking, Estimation, Execution and Co-ordination with Client.
Project 4: M/s Syngene Ltd. (A Pharmaceutical Industries)
Bangalore
Period : Nov’01 to Apr‘02
Responsibilities:
• Worked as a Electrical Engineer to set up the new construction site for Pharmaceutical industries
• This included Hazardous Area , Non Hazardous Area cable laying , power point works, Inspection of 800A, 630 A LT Panel installation, 40kW, 70kW motor, 5MVA Transformer erection, Installation of Earthpit and As built drawing preparation
Project 3: M/s Tidel Park (Multistoried Building)
Chennai
Period : July’00 to Oct ‘01
Responsibilities:
• Worked as a Electrical Engineer to set up the new construction site for multistoried
Building
• This included LDB, ELDB, UPSDB, LV Panel erection, garden Pole erection for the light,4kV 5kA Lightning Arrestor erection and 2.5 MVA Transformer Erection ,Installation of Bus duct from Transformer to LV Panel and Ducter Testing.
Project 2: M/s Ford India Limited (Four Wheeler Company)
Chennai
Period : Aug’ 99 to June ‘00
Responsibilities:
• Worked as a Electrical Engineer to set up the new construction site for Four Wheeler Industries
• This included 6.6kV/440V 1MVA Service Transformer, 1250A panel Erecting, Inspection of cable tray, LT Motor Erection and testing, trench works and Substation earth mat laying and As-built Preparation
Project 1: Chennai Petrolium Corporation Ltd, (refinery)
Chennai
Period : Nov’ 98 to July ‘99
Responsibilities:
• Worked as a Trainee Engineer to set up the construction site for Refinery Industries
Refinery area lighting, cable laying, cable tray erection, earthling, Transformer O&M, testing, installation and commissioning Co-ordination.
Motor O&M, installation, testing, commissioning and Co-ordination Relay testing, LV, HV cable laying and testing and commissioning .Erection 230V AC UPS, 230V AC Fire and Gas UPS systems. Commissioning (HT & LT) Motors, MCC, LDB and Panels.
|
| Skills: |
Engineer |
| Known languages (and levels): |
English-Very GoodArabic-A littleHindi-Good
|
| Type of Employment wanted: |
Full Time
|
| Minimum Yearly Salary in Numbers: |
36000 USD
|
| Current Location: |
( Confidential ) |
| Education History, Qualifications & other additional information: |
| Level of Education: |
Bachelor
|
Safeer Apts,
Flat 501,
Al kuwair,
Muscat, oman
:- +968 95641054
E-Mail: subbi2k @yahoo.Com
M.Subramanian
Profile:
Having Ten years Experience in Electrical Design and Construction activities .Can work efficiently and effectively as an individual and also as a team member. Posses excellent interpersonal and communication skills.
Education:
Qualification : B.E (Electrical and Electronics)
Year of Passing : 1998
Institution : A. K. College of Engineering
Madurai Kamaraj University, Tamilnadu
Computer Skill Set
Languages : VB 6.0
Operating System : Windows’98, MS-DOS
Personal Details:
Marital status : Married
Permanent Address : 23, South puthu Street
Srivaikuntam
Tuticorin (DT)
Tamilnadu
India
Pin.628 601
Ph: 00 91 – 96779 38060
00 91 – 99520 17469
00 91 – 4630 255449
Passport No : H 1847182
|
| Work History & Experience: |
| Years of Work Experience: |
10 to 15 Years |
Professional Experience:
M/s Tebodin & Partner LLC, Sultanate of Oman
Designation : Electrical Design Engineer
Duration : May’07’ to till
M/s Worley Parsons - Arabian Industries (JV) LLC, Sultanate of Oman
Designation : Electrical Design Engineer
Duration : Mar’06 to April’07
M/s Reliance Engineering Associates (p) Limited, Mumbai
Designation : Electrical Design Engineer
Duration : Dec’04 to Feb `06
M/s Rohini Industrial Electricals Pvt Ltd, Mumbai
Designation : Senior Engineer
Duration : Apr’03 to Nov ’04
M/s Vijaya Enterprises, Bangalore
Designation : Electrical Engineer
Duration : Nov’01 to Mar’03
M/s Hope Engineers, Chennai.
Designation : Electrical Engineer
Duration : Nov’98 to Oct’01
|
|
|
|