|
|
| Position wanted: |
Project Engineer / Engineering Manager / Project Manager |
| Job category: |
ConstructionEngineeringIndustrialInstallationManagement/ManagerOil IndustryPublic Sector |
| Objective and Resume Summary: |
|
More than 13 years of overall experience in project management, project engineering, design, estimation, construction supervision, inspection for quality control, testing and start-up of Petroleum Installations, Refinery, Oil and Gas Installations, Fertilizer Plant and Pipeline facilities.
More than 8 years of extensive experience in Project and Construction Management of Oil and Gas storage Terminal facilities
Well versed with Design, Engineering and construction of Piping and Tanks.
Experience in handling development project from definition, project sanction, scope finalization, execution, commissioning to the satisfaction of client / consultants & handing over.
Well versed with Codes/ Standards like ASME Section II, Section V, Section VIII, Section IX, B 31.3, B 31.8, API 650, 620, 1104, ISO 9001:2000.
Excellent relationship management, analytical and negotiation skills with deftness in swiftly ramping up projects in close co-ordination with external agencies and ensuring on timely delivery.
Outcome focused.
|
| Skills: |
Project Management, Engineering, Coordination, Piping, Tank |
| Known languages (and levels): |
English-Very GoodHindi-Very GoodOther: Gujarati
|
| Type of Employment wanted: |
Full Time
|
| Minimum Yearly Salary in Numbers: |
72000 USD
|
| Current Location: |
Oman, Muscat |
| Education History, Qualifications & other additional information: |
| Level of Education: |
Bachelor
|
Qualifications
B.Eng. From Shantilal Shah Engineering College, Bhavnagar University, Bhavnagar, Gujarat in 1995. (Secured Distinction)
Chartered Engineer
Memberships
Member of The Indian Institute of Welding
Associate Member of The Institution of Engineers (India)
Training
Technical
Piping Engineering from Sofincad Technology, Vadodara
Welding and Inspection from Welding Research Institute, Trichy
ASNT Level-II in Radiography Testing
ASNT Level-II in Visual Testing
Industry Required
Basic Managerial Skill
Project Management
Presentation Skills
Finance for Non-finance Executives
Software Knowledge
Windows
Microsoft Office
AutoCad
Ms Project
|
| Work History & Experience: |
| Years of Work Experience: |
10 to 15 Years |
May 2007 present
Oiltanking odfjell terminal & co., oman
Engineering manager
Responsibilities include:
Monitoring all phases of EPCC project activities of Oil and Chemicals Storage tanks and Terminal facility of 36 nos. Of tanks (Api 650), 02 nos. Of Horton spheres (Pd 5500), Jetty pipelines, pump stations, associated piping and other facilities.
Coordinating multi discipline activities, handling contractors / vendors to maintain deadline.
Reviewing project specifications requirements and implementation during project execution.
Reviewing / approving of drawings and documents for Plot Plan layout, Piping, Tanks and associated facilities, cross checking of Bill of Materials with respect to drawings.
Participating in HAZOP study and technical discussions.
Formulating operational requirements, Method Statements, Work Specific Quality Control Plans, HSE Documents, review / preparation of site construction documents.
Reviewing / preparing project plan, manpower forecast, and recovery plan for critical activities. Monitoring projects with respect to Cost, Resource Deployment, Time over-runs, Compliance to HSE & Quality requirements, timely execution of projects.
Managing overall operations for Project Management within cost & time norms.
Participating / conducting in project review meetings for evaluating project progress and de-bottlenecking.
Certification of contractors RA Bills and variations.
In charge of piping system with associated equipments, total scope was 145,000ID of welding and 310,000IM of erection for phase-1 which was completed before two month from the contractual completion date. For phase-2 the total scope of 78,000ID of welding and 175,000IM of erection completed before one month from the contractual completion date.
In charge of LPG storage system with associated facilities comprises 2 Horton spheres, associated piping and jetty loading facilities. Work is in under progress and 5% ahead of schedule.
Liaising with consultants, contractors and external agencies for determining technical specifications, approvals and obtaining work / construction permit and statutory clearances.
Completed 5 nos. Of hot tapping activities within available timeframe in closed coordination with owner of facilities, EPC contractor, hot tapping contractor without any incident and operational difficulties.
Member of multidisciplinary group charged with preparation of final check list before commissioning of facilities.
Facility for phase-1 commissioned as per schedule without any trouble and handed over to operation group.
June 2006 march 2007
Manco international (al mana group), qatar
Project engineer
Responsibilities include:
Monitored all phases of EPC project activities of Ras Laffan Olefins EPC Project of 4 nos. Of spheres (ASME Sec.VIII Div. 2, U2 stamp) and 8 nos. Of tanks (API 650/ 620)
Project specifications requirement was implemented during Engineering, design, procurements and construction phases.
Material Planned and followed-up with vendors for timely delivery of materials and equipments for smooth execution of project.
Ensured that required manpower deployed and equipments made available.
September 2004 may 2006
Essar constructions ltd., MUMBAI, INDIA
Dy. Manager - Mechanical
Responsibilities included:
Incharge of fabrication shop and responsible for timely delivery of equipments, fabricated pipes, technological and heavy Industrial building structure for the expansion work of Essar Power and Essar Steel Plant, Hazira, Surat
Anchored construction activities to ensure completion of priorities within the time and cost parameters with effective resource utilisation, achieved maximum output.
Led, coordinated and supervised 18 engineers and sub-contractors.
Assured that production targets, safety awareness and quality requirements achieved and completed within budgeted cost.
Power Plant completed 4 month ahead of schedule and CRM completed on schedule.
January 2000 september 2004
Indian oiltanking ltd., MUMBAI, INDIA
Project Engineer
Responsibilities included:
Inspecting field sites to observe and evaluate condition and operability of facilities and to collect field survey data and measurements.
Liaised with clients, consultants, contractors and external agencies for determining technical specifications, approvals and obtaining statutory clearances.
Executed piping fabrication, erection, testing in time and at live plant sites following the safety permit and safety norms requirements.
Handled fabrication, erection, testing of Cone roof, Floating roof, Internal-floating roof tanks, technological & heavy industrial structures.
Assured quality with implementing approved procedures, ITPs, WPS, PQR, WQT etc.
Ensured and checked quality by incoming material inspections, fit-up, weld visual, dimension checks, mechanical completion, NDT like LPT, MPT, RT etc. And documentation of all records.
Managed the tendering process from floating of bids to awarding of contracts; coordinating with contractors with regard to techno-commercial negotiations.
Proposal Estimation, scop finalisation, Co-Ordination and Contract Management
Resolved contractual issues like extra claims, time extension in delivery schedules.
Provided feedback to management on various aspects of job including profitability, relation with client / consultants, etc.
Prepared RA Bills and certification of contractors / vendors Bills and extra claims.
Involved in testing, pre-commissioning / commissioning activities of Tanks, Piping and Fire protection system like preparation of checklist, flushing, cleaning, Air blowing, final box-up and leak testing.
Following projects completed within available time frame and budget.
1. IOCL-GR Other Storage Tanks EPC job for Storage Tanks (6 Nos.) and associated piping of LAB plant
2. GSPL-NG Pipeline EPC job for pipeline laying, metering station (3 Nos.) and automation.
3. IBP POL Depot - EPC job for Storage Tanks (7 Nos.), associated piping, Fire protection system, Building structure and associated facilities.
4. IOCL - POL Terminal - EPC job for Storage Tanks (13 Nos.), associated piping, Fire protection system, Building structure and associated facilities.
July 1998 july 1999
Reliance industries ltd., jamnagar, india
Piping engineer
Responsibilities include:
Fabrication and erection of Piping and technological Structures, Installation of equipments for CDU/VDU plant of Reliance Petroleum Ltd., Jamnagar.
Coordinated with material departments and contractors for timely delivery of material at site and utilised for further processing.
Certification of contractors RA Bills and extra claims.
Plant completed and commissioned well ahead of schedule.
May 1997 may 1998
Tecnimont icb ltd., vadodara, india
Asst. Mechanical engineer
Responsibilities include:
Piping fabrication, erection, loop checking, pressure testing, check list preparation and implementation for 1350 MTPD Ammonia project, GSFC Ltd.
Ensured that material received and utilised as per PMS and VMS.
Coordinated and followed-up with store and contractors to ensured availability of material and priority achieved. Resolved site constrains related to piping route and materials.
Executed painting and insulation activities.
September 1995 may 1997
Ladco enterprises, vadodara, india
Asst. Engineer - mechanical
Responsibilities include:
Fabricated and erected piping, technological structure, installed pumps and equipments, for MEK Oxime Plant of GSFC Ltd.
Utilised available resources to complete pipeline fabrication, erection and laying between IOCL-GR to GSFC Tank farm (4km) within completion schedule.
Assisted to client for plant shutdown and regular maintenance jobs. |
|
|
|