| Position wanted: |
Cost Control |
| Job category: |
Management/Manager |
| Objective and Resume Summary: |
|
| To obtain a position as Project Manager, Project Services Manager, Project Controls Manager or Senior Project Engineer where my skills and expertise will be effectively used to enhance the quality of any project from concept through to commissioning and hand over to a satisfied client. |
| Skills: |
Management,Project Controls,Project Services, Project Engineering. EPCM, Estimating,Scheduling,Planning,Document Control, Contracts,Procurement. |
| Known languages (and levels): |
English-Very GoodOther: Bahasa Indinesia (basic)
|
| Type of Employment wanted: |
Full Time
|
| Minimum Yearly Salary in Numbers: |
320000 USD
|
| Current Location: |
Indonesia, Jakarta |
| Education History, Qualifications & other additional information: |
| Level of Education: |
College
|
Born: Australia
Passport: Australia current valid until 16 February 2016. E3035057
D.O.B. 14 January 1958
Married with nil dependants
Memberships
Australian Institute of Engineers AIE # 3279190
Self Improvement Courses undertaken
Microstation
Autocad
BHPB Project Management PM101, 201 & 301
BHPB Contractor Management System - HSECS
Primavera P3
Primavera P5
Pertmaster V8
Quest Estimating
CMS cost management system
Bahasa Indonesia
QuickBooksAccounting
Hobbies & Interests
Family; Camping; Fishing; Golf; Dining; Computers; Photography. Bowling; Gardening
|
| Work History & Experience: |
| Years of Work Experience: |
More than 15 Years |
Professional Experience
Project Services Manager Dec 2008 to present
PT Lahai Coal BHP Billiton Indonesia
Achievements
The setting up and engagement of a team moving into execution phase of the Project.
Management of the following areas; Contracts & Procurement; Document Control; Estimating; Budgets; Cost Control; Planning & Scheduling;
Management and development of Contracting Procedures & Processes
Project Controls Principal Sept 2007 to Mar 2008
Maruwai Coal Projects Group BHP Billiton Indonesia
Achievements
The development of and auditing of systems and data, creation and implementation of procedures and controls within the department and across the project divisions.
Continuous training of staff in the project controls team in the operations of an EPCM project and in all the areas of project controls as listed above.
mentor to the team
Senior Project Engineer Mar 2008 to Dec 2008
PT Maruwai Coal Lampunut BHP Billiton Indonesia
Achievements
Assisting with the coordination of all aspects of the design phase for the Lampunut Stage 1 Project including project controls, development of the WBS, coding, contracting strategy for the construction, project approval requirements
Senior Project Engineer Jul 2007 to Dec 2007
PT Lahai Coal Haju Trial Mine Feasibility BHP Billiton Indonesia
Achievements
Developed a close working relationship with contractor assisting them in the development of their systems to comply with BHPB requirements, standards and quality.
Team Leader Project Manager Jan 2007 to Jul 2007
PT Lahai Coal Haju Trial Mine BHP Billiton Indonesia
Achievements
Led peer review of the design of a 41 km haul road and delivery of a detailed report of findings and analysis of the design.
Area Manager Jan 2006 to Jan 2007
PT Maruwai Coal 5mtpa Feasibility Study BHP Billiton Indonesia
Achievements
Managed preparation of the WBS, Scope, Deliverables, Risk and Schedule, Tenders, Evaluations and Contract for feasibility study for the above areas of Works to a +- 10% costing.
Manage all aspects of the feasibility study development reporting to the project manager
Successful design completion of 16km Overland Conveyor of unique design to overcome environmental and biodiversity issues.
Senior Project Engineer Jan 2005 to Jan 2006
West Angelas Mine 25Mtpa Upgrade Rio Tinto
Achievements
Management of all aspects of 25 Contracts for the Supply, manufacture, delivery and Installation of Equipment to the value of $40M.
Designing a new methodology for the replacement and installation of wear liners resulting in an 86% improvement in time taken.
The development, design, fabrication and installation of pneumatic gate on top of 600tonne bin to disperse ore evenly between divider in bin. Successful installation during extreme shutdown time pressures,
Senior Project Engineer Mar2003 to Jan 2005
Yandi Mine- 36Mtpa Upgrade Rio Tinto
Achievements
Managed preparation of the WBS, Scope, Deliverables, Risk and Schedule, Tenders, Evaluations and Contract, administration, change management, progress reporting and budget control..
Managed Engineering, Procurement and Construction of the Overland Conveyor System. The conveyors being 1.6kms 900mm wide, 4.5 m/s, 2200 tph and 2.9kms in length1050 wide, 7 m/s, 6000 tph valued at $22M.
Having Rio Tinto naming the river crossing over Marillana Creek where my bridge and overland conveyor crosses named after myself as Naylor Crossing
Successful operation of all conveyors, on time, under budget and 371 days incident free.
Senior Project Engineer Apr2002 to Mar 2003
Eastern Range Mine Paraburdoo Rio Tinto
Achievements
Managed preparation of the feasibility study for the Overland Conveyor Works to a +- 10% costing. Attend site during Implementation phase and monitor Contractor during construction. Assist with Commissioning and handover.
Overland Conveyor Feasibility, Design and Construction
O Manage all aspects of the Engineering, Procurement and Construction of the Overland Conveyor System, Value $8M 1.6kms in length, 4.5m/s, 2200 tph
O Management of Contractor, Budget, Schedule, Deliverables, Construction and Close Out
Attend on site and supervise the construction of overland conveyors through to commissioning and handover.
Successful completion of conveyor under time and under budget
Good contractual and working relationship between contractor and client maintained
Project Controls/Logistics Engineer Aug2000 to Apr2002
West Angelas Mine & Cape Lambert Port Upgrade 25Mtpa Greenfields Hamersley Iron
Achievements
Management of Project Equipment/Project Spares - Logistics
O Management of all aspects of Project Equipment & Spares, Inspections, Expediting, Release, Receivables, Issues to Installation contractors.
O Liaisons with all vendors.
Management of Materials control on both sites, laydown areas gridded with coding.
Successful control of all equipment to both Port Facilities and green fields mine without loss or delay in supply.
The design of an electronic database to control all equipment and spares which was adopted by RIO Tinto for all their projects moving forward.
Work Experience 1976 to 2000
Area C Project, Via Newman Apr02 to Aug02 Project Spares / Equipment Manager
West Angelas Plant Project And Cape Lambert Upgrade Aug00 to Apr02 Project Controls Officer
Park Lane Constructions Pty Ltd Jul99 to Jun00 Contracts Administration Manager
BHPIO Capacity Expansion Project At Nelson Point, Port Hedland, Western Australia Apr96 to May99 Document Control Administration Manager/Lead Mechanical Drafter
Mt Edon Gold Mine Upgrade, Leonora Jul95 to Apr96 Senior Mechanical Design Drafter
Further details of work history back to 1976 available on request
|
|
|
|