|
|
| Position wanted: |
Planning engineer |
| Job category: |
Oil Industry |
| Objective and Resume Summary: |
|
Objective:
* Still working with an oil and/or a gas company.
* Give the maximum efficiency for the company.
* Accept working on an offshore
* Work 4 weeks by 4 weeks off, or on full time with family accommodations. (Accept other way if working conditions are satisfactory)
* Accept to make trainings before start working
|
| Skills: |
Planning engineer, British petroleum, Maximo, Algeria, Algiers, very good speaking French, very good speaking Arabic, turnaround engineer, shutdown, primavera P3, MSproject, 4*4, 4X4, 4x4, 4 weeks on, 4 weeks off, 6 weeks, married, offshore, turbine, |
| Known languages (and levels): |
English-GoodFrench-Very GoodSpanish-A littleArabic-Very Good
|
| Type of Employment wanted: |
Full Time
|
| Minimum Yearly Salary in Numbers: |
120000 Euro
|
| Current Location: |
Algeria, Algiers |
| Education History, Qualifications & other additional information: |
| Level of Education: |
Bachelor
|
2008: Work Permit training
2005: Accidents/Incidents investigation training (How to determinate the root causes)
2004: Maintenance Management, equipment availability control. At the French Petroleum School (IFP ENSPM of Paris)
2007-2002: Several seminars different themes.
1993-1998: Degree Studies in maintenance mechanical engineering. At University of Boumerdes, Algeria
1990-1993: Studies to obtain the senior technician diplomat on Engines maintenance. University of Boumerdes.
1987-1990: Bachelor on science class, high school Emir Abdelkader
English: writing and speaking good.
French: specking and writing very good (excellent)
Arabic: (excellent)
Perfect use of MS office tools: Word, Excel, PowerPoint, Access, MS Project, business Object, Outlook . . .
First aid Training.
Working with Primavera P3.
Perfect Use of MAXIMO.
Ready for improvements and trainings on any speciality for the company needs.
|
| Work History & Experience: |
| Years of Work Experience: |
7 to 10 Years |
2000-2001 (1 year for a test Period) Planning engineer
Company SONARCO (Sonatrach-British Petroleum)
2001-2006 Planning engineer.
Company SONARCO (Sonatrach-British Petroleum)
Duties
• Coordinate with tem to develop a preventative maintenance plan and curative job plan.
• Manage and Organize safety Meetings for the maintenance team.
• Manage Work requests, Work Order, Purchase request, purchase Order, PMs, Equipment historic, using MAXIMO.
• Coordinate with SCM to improve the stock management.
• Shut Downs Preparation.
• Set the 5 years maintenance plan.
• Set the yearly Maintenance plan.
• Monitor the annual inspections program of turbines and static equipments.
• supervise planning team work (Electrical, Mechanical and Instrument Planner)
• Order and Prepare Parts and consumable needed for the work orders.
• Make and follow maintenance plan using MSProject.
• Prepare the plan for the turbines Major inspection & hydro test of vessels.
• Establish the monthly report (reliability and availability of Machines) and Work Order Statistics report.
2006- until now: Chef Planning (Equivalent of Senior Planning engineer)
Company SONARCO (Sonatrach-British Petroleum)
Duties:
• Monitor team, apply the HSE rules.
• Supervise the Planning team: 2 engineers, 2 supervisors, 6 planners (2electrical, 2 Mechanical, 2 Instrumental Planner), 2 doc controllers.
• Manage a daily meeting (maintenance-operation)
• Attend and provide assistance on several meetings:
MOC meetings (management of change)
SCM meetings.
Budget meeting.
Risk assessment meeting
• Monitor the Use of MAXIMO tool and manage maintenance operations, procurement, manage spare parts, manage work requests, and manage the history of interventions on equipments.
• Participate on the budget preparation.
|
|
|
|