| Position wanted: |
Electrical supervisor oil&gas construction |
| Job category: |
Oil Industry |
| Preferred Location: |
Qatar |
| Preferred City-State/County: |
Al-Dawhah (Doha) |
| Objective and Resume Summary: |
|
. Company Name : M/s gulf petrochemical services & trading llc,
Designation : supervisor - electrical
Period of service: from august-2003 to till date
responsibilities & work executed :
• terminal facility project for Oman Refinery Company – MAF, MUSCAT.
• Deep Water Disposal project at Petroleum Development Oman (PDO), NIMR, RIMA.
• Water Injection System expansion project at PDO – Bahja.
• Deep Water Disposal system for Zauliyah W.I & Suwaihat.
• Birba Gathering station Expansion Project, Marmul PDO
• Harweel Well Head distribution system monitoring Facilities.
• MCD-Project, Al-khalata-dwd Expansion Project & Gas Compressor Project in Main Marmul Production Station, PDO
• Second stage Depletion Compression Project for YIBAL, Government Gas Plant, Oman.
• Fahud-buraimi Gas compressor station project for Oman Gas Company.
• Expansion of South Oman Gas Transportation System, Shalala, Oman. At present Marmul construction development -3, thuleilat station expansion project. Marmul
installation and testing
• 8 mva 33KV / 6.6 KV Transformers.
• 33KV Gas Insulated Switchgears - SIEMENS,
• 6.6KV Vacuum Circuit Breaker – TAMCO Make,
• Auto Recloser Installation & Testing,
• GIS Termination – Pfister Make,
• 6.6 KV H.T Motor ( Up to 2100 KW ),
• SCADA System – Siemens Make,
• 14 MVA, 33KV / 11 KV Transformers,
• 440V PCC/MCC – L&T Panels,
• Air Circuit Breakers – 2000A, ABB Make,
• H.V and L.V cable termination & straight through jointing (RAYCHEM) and Testing,
• Variable Frequency Drives – Allen Bradley –Make,
• UPS System Installation, Chloride –Make & ALCAD-Batteries Installation & Testing,
• 90 MVA, 18MVA, TX Erections, Gis (tamco), Vfd (siemens),
• Commissioning activities Testing, Hypotest, Module Functioning test, etc.
• 25KVA UPS System Installation, Testing & Commissioning with BORRI, ITALY.
|
| Skills: |
Installation And Testing
• 8 Mva 33KV / 6.6 KV Transformers.
• 33KV Gas Insulated Switchgears - SIEMENS,
• 6.6KV Vacuum Circuit Breaker – TAMCO Make,
• Auto Recloser Installation & Testing,
• GIS Termination – Pfister Make,
• 6.6 KV H.T Motor ( Up to 2100 KW ),
• SCADA System – Siemens Make,
• 14 MVA, 33KV / 11 KV Transformers,
• 440V PCC/MCC – L&T Panels,
• Air Circuit Breakers – 2000A, ABB Make,
• H.V and L.V cable termination & straight through jointing (RAYCHEM) and Testing,
• Variable Frequency Drives – Allen Bradley –Make,
• UPS System Installation, Chloride –Make & ALCAD-Batteries Installation & Testing,
• 90 MVA, 18MVA, TX Erections, Gis (tamco), Vfd (siemens),
• Commissioning activities Testing, Hypotest, Module Functioning test, etc.
• 25KVA UPS System Installation, Testing & Commissioning with BORRI, ITALY.
|
| Known languages (and levels): |
English-Very GoodArabic-A littleHindi-Very GoodOther: tamil,malayalam
|
| Type of Employment wanted: |
Full Time
|
| Minimum Yearly Salary in Numbers: |
1400 USD
|
| Current Location: |
Oman, Muscat |
| Education History, Qualifications & other additional information: |
| Level of Education: |
College
|
Qualification :
1) I.T.I. - Electrical
2) “b “ License Holder (Tamil Nadu Electricity Board)
3) Authorized License Holder (petroleum development of
Oman)
Training :
1 year Apprentice Ship Training in bharat heavy electricals ltd,
Trichirapalli, tamil nadu-india
Additional qualification:
competent Electrical Person (CEP) by Petroleum Development of Oman (valid till 2011 South Oman),
Electrical PTW Applicant By OGC (Validation N/a) & Pdo ( Valid till 2011 )
Gas Tester Valid till 2012
PDO Related certified courses like JHA , ESSW , H2S
|
| Work History & Experience: |
| Years of Work Experience: |
10 to 15 Years |
. Company Name : M/s gulf petrochemical services & trading llc,
Designation : supervisor - electrical
Period of service: from august-2003 to till date
responsibilities & work executed :
• terminal facility project for Oman Refinery Company – MAF, MUSCAT.
• Deep Water Disposal project at Petroleum Development Oman (PDO), NIMR, RIMA.
• Water Injection System expansion project at PDO – Bahja.
• Deep Water Disposal system for Zauliyah W.I & Suwaihat.
• Birba Gathering station Expansion Project, Marmul PDO
• Harweel Well Head distribution system monitoring Facilities.
• MCD-Project, Al-khalata-dwd Expansion Project & Gas Compressor Project in Main Marmul Production Station, PDO
• Second stage Depletion Compression Project for YIBAL, Government Gas Plant, Oman.
• Fahud-buraimi Gas compressor station project for Oman Gas Company.
• Expansion of South Oman Gas Transportation System, Shalala, Oman. At present Marmul construction development -3, thuleilat station expansion project. Marmul
installation and testing
• 8 mva 33KV / 6.6 KV Transformers.
• 33KV Gas Insulated Switchgears - SIEMENS,
• 6.6KV Vacuum Circuit Breaker – TAMCO Make,
• Auto Recloser Installation & Testing,
• GIS Termination – Pfister Make,
• 6.6 KV H.T Motor ( Up to 2100 KW ),
• SCADA System – Siemens Make,
• 14 MVA, 33KV / 11 KV Transformers,
• 440V PCC/MCC – L&T Panels,
• Air Circuit Breakers – 2000A, ABB Make,
• H.V and L.V cable termination & straight through jointing (RAYCHEM) and Testing,
• Variable Frequency Drives – Allen Bradley –Make,
• UPS System Installation, Chloride –Make & ALCAD-Batteries Installation & Testing,
• 90 MVA, 18MVA, TX Erections, Gis (tamco), Vfd (siemens),
• Commissioning activities Testing, Hypotest, Module Functioning test, etc.
• 25KVA UPS System Installation, Testing & Commissioning with BORRI, ITALY.
2. Company Name: M/s ongc offshore,
Blq-1 & blq-2, bpa & bcpa platform bombay hai
Mumbai.
Designation : electrical-technician
Period of service: from june-2002 to may-2003.
Responsibilities & work executed :
preventive maintenance, breakdown & shut down of electrical installations.
• transformers
• Gas Turbines of 5.8 MW Capacity,
• HVAC System,
• Pcc & Mcc Maintenance.
• All Electrical equipments & motors.
3. Company Name: M/s Larsen & Toubro Ltd, Pondichery,
INDIA.
Designation : electrical-technician
Period of service: from june-1999 to janaury-2002.
Responsibilities & work executed :
involved in all types of panel construction, installation & maintenance activities.
• switch Racks,
• 22KV VCB’s indoor & outdoor,
• Transformer Assembly,
• Inter-Panel wiring,
• Maintenance Works (Machinery & Panels /Generators Preventive Maintenance Works).
|
|