|
|
| Position wanted: |
Telecom job |
| Job category: |
Telecommunications |
| Objective and Resume Summary: |
|
Carrier Objective
To secure a suitable position in Telecommunication in BTS & MW Transmission (Field Operation, Planning, Implementation, Commissioning, LOS, O&M, Rollout), BSS and finally work with a reputed company. I have more than 3.5 years of experience in Telecommunication and in different sections of Information Technology. So if given an opportunity to serve your company I will prove my eligibility utilizing my strong technical skill, leadership, communication, and project management skills for a post that matches with my expertise.
|
| Skills: |
NSS,BSS,O&M in telecom field |
| Known languages (and levels): |
English-Very GoodHindi-Very GoodOther: Bangla
|
| Type of Employment wanted: |
Full Time
|
| Minimum Yearly Salary in Numbers: |
3000 USD
|
| Current Location: |
Bangladesh, Dhaka |
| Education History, Qualifications & other additional information: |
| Level of Education: |
Bachelor
|
Academic Qualification
Course name:-Bachelor of computer science.
Area of Study:-Information Technology.
Year of Pass:-2002.
Name of Institution:-Bangalore University-India.
Division/Class/ Grade/CGPA:-First class (63%).
O Course name:-Diploma Engineering.
Area of Study:-Electrical Engineering.
Year of Pass:-1997.
Name of Institution:-Bogra Polytechnic Institute.
Division/Class/ Grade/CGPA:-First class (67%).
O Course name:-SSC.
Area of Study:-Science.
Year of Pass:-1994.
Name of Institution:-Rajshahi Education Board.
Division/Class/ Grade/CGPA:-First class (69%).
Training Attended:
Achieved the special training on Huawei Bts (312 & 3012)
Duration- Seven Days
BTS 312 and BTS 3012(supports 2G n 3G both)
Both theoretical and Practical (Field)
Hardware Structure
Installation process
Cabling (External & Internal)
Different Modes of BTS Configuration
On Quality as per Huawei Standards
Commissioning and Integration
Being trained up on Huawei BSC6000
Duration- Seven Days
Hardware Structure
Installation process
Cabling (External & Internal)
External Signal Cabling
Commissioning
On Linux operating system
Quality Installation as per the Huawei Standards
Trained on Switching (Msoftx3000, Umg8900, Hlr8920)
Duration- Seven Days
Msoftx3000 (huawei)
Hardware Structure
Installation process
System Structure
Device Introduction
Different Frame Connection
Interfaces
Signal Processing Path (over Ip, Atm)
Cabling (External & Internal)
External Signal Cabling
UMG8900 (Huawei)
Hardware introduction
Frame and Dip Switches
Board Function
Classification of Subsystems
Cabling (cascading, clock and monitoring cable)
Cabling (internal and external)
HLR8920 (Huawei)
Hardware Installation manual
Frame Classification
Cabling (External & Internal)
Interfaces
Signal Processing Path (over Ip, Atm)
Quality Installation as per the Huawei standards
RectifierPs481000-5/100 System (Emerson)
Duration- Two Days
Cabinet Installation
Electrical Assembly
System setting
Resistance Requirements
Cabling
Connection of AC Input Cables in Rectifier Rack
Connection of Communication Cables in AC Distribution Cabinet
Connection of Communication Cables in DC Distribution Cabinet
DC Load Cable Connection
Battery Cable Connection in DC Cabinet
Installing and Commissioning of Siemens Mw.
Institute:- SIEMENS Training room.
From:-23-Sep-2005 To:-04-Oct-2005.
Location:- Dhaka-Bangladesh.
Professional Qualification
O Name of Degree/ Diploma/Certificate: - Microsoft certified system engineer (Mcse).
Location:-Bangalore,INDIA.
O Name of Degree/ Diploma/Certificate: - Cisco certified network administrator (CCNA).
Location:-Bangalore,INDIA.
|
| Work History & Experience: |
| Years of Work Experience: |
3 to 5 Years |
Professional Experience (01)
Designation : Field Manager-Network Services
Company : GTL-Limited (Bangladesh Branch)
Duration : From 10-Jan-2008 to 15 Feb 2009.
Project : Eicsson-tmib (po07_lca02 & Po07_lca03)
Eicsson-tmib (swap)-feni and Noakhali
Job Responsibility:
O Support project preparation works as part of start up team.
O Support PM in preparing Quality Plan & preparation of e-Tracker quality module
O Supports PD/ SPM/ PM to prepare/ update Roll-out schedule
O Following up the time schedules and checking if the work is executed according to plan and escalations to project management as needed
O Providing installation status reports regularly to project management
O Reporting to project management of foreseeable problems/ all deviations from the original planning, i.E. Extra works, delays, cancellations, etc.
O Make sure site Implementation is done properly by sub-contractor. Report to PM
O Work with PM to review rollout and technical competence of partners and suppliers. If needed support rollout training for partners together with PM
O Regular contact with the counterparts (service suppliers/ Customers) to discuss planning
O Definition of site-specific documentation, share of responsibilities and site acceptance process
Implement Project Quality Plan and e-Tracker quality module for site work
O Ensure proper process implemented for checking site congurations for logistics ordering process
O Support with any problem solving for implementation issues on site
O Make sure site quality assessment is done according to project quality process and reporting requirements
O Checking the site specific documentation and providing all needed documentation to the partners to enable them to perform the job
O Collecting site quality checklist from service suppliers and ensuring that the quality tool is updated
O Ensuring that the planned installation teams have access to site
O Ensuring that the installation teams are working according to the health and safety plan
O Handover sites to customer installation works done by installation teams
Designation : Senior Enginerr-Telecom
Company : GTL-Limited (Bangladesh Branch)
Duration : From 21-July-2007 to 09 January
Job Responsibility:
Ericsson-warid Project
O Installation and commissioning of PDH (Ericsson MiniLink E, Minilink TN, Minilink craft) Microwave Transmission system.
O Installation, commissioning & integration of bts (rbs 2206, 2206 v2, 2216 2106i).
O Installation of Power System Bbs (2000 & 2000i), PBC 6500, AVR.
O Testing VSWR of feeder cables by site master (Bird, Anritsu).
O Loop and Digital path testing between link to base by BER tester (Sunrise).
O TSS Survey, Line of Sight (LOS) Survey.
O Prepare Line of Sight (LOS) confirmation document
O Perform PAT & Hand Over the site to the customer.
O Supervise and mobilize several teams.
Professional Experience (02)
Designation : Telecom Engineer.
Employer : Bonafide Engineering Solution And Technology.
Address : House#10, Road#7 1st floor, dhanmondi, Dhaka-1205
Employer Type : Telecommunication (Subcon).
Duration : From 01-December-2004 to 15-July 2007
Job Responsibility:
HUAWEI City Cell CDMA Project
HUAWEI Banglalink GSM Project
Huawei Tmib Gsm Project
Ericsson Tmib Gsm Project
O Supervision of BTS Outdoor installation (Antenna Fixing, Electrical and Mechanical Tilting, Azimuth, Connector Making, Lightning Proofing, Weather Proofing, Feeder Cable Management according to cell, Grounding, Labeling etc.).
O BTS Indoor installation (Ladder Preparation in the cabin, Placing of BTS, Power System, Battery racks, DDF, Alarm Box and accessories etc. Power and grounding cable management, Indoor Connector and short jumper Preparation, Lightning arrester, Labeling etc.).
O Site Analyze (DTF and VSWR) by site analyzer.
O GPS installation, Labeling, Cable Management etc.
SIEMENS Banglalink GSM Project
O Installation as well as Supervision of BTS Outdoor installation (Antenna Fixing, Electrical and Mechanical Tilting, Azimuth, Connector Making, Lightning Proofing, Weather Proofing, Feeder Cable Management according to cell, Grounding, Labeling etc.).
O BTS Indoor installation (Ladder Preparation in the cabin, Placing of BTS, Power System, Battery racks, DDF, Alarm Box etc. Power and grounding cable management, Indoor Connector and short jumper Preparation, Lightning arrester, Labeling etc.).
SIEMENS Banglalink MW Project
O Installation of MW Antenna (Outdoor) full system (ODU termination, earthing, weather proofing, Alignment, Labeling etc.).
O Installation of Indoor System (Rack placing, indoor unit termination, RF, Power and grounding cable management, DC panel, CB, Wide Muller, Labeling etc.)
O Commissioning and PCM through etc.
Achievement
Successfully handed over 45 BTS Sites in the CTG and DHK region for Huawei City-cell Cdma Project and 40 BTS Sites in the country for Huawei Banglalink Gsm Project.
Successfully handed over 50 BTS Sites in the DHK and KHU region for Siemens Banglalink Gsm Project.
Successfully handed over 60 MW Sites in the DHK and CTG region for Siemens Banglalink Project.
Successfully handed over 60 BTS Sites in the CTG and Khulna region for Huawei Tmib Project.
Successfully handed over 20 RBS and MW Sites in the DHK and BOGRA region for Ericsson-warid Project.
.
Professional Experience (03)
Designation :Asst. System engineer.
Employer :Rooman Technology Ltd.
Address :Bangalore –India.
Employer Type :Network and hardware training inst.
Duration :From 19-Mar-2002 to 07-May-2003.
Job Responsibility:
LAN Setup, Configuration of server, Hardware and software maintenance, providing backup and troubleshooting.
|
|
|
|