|
|
| Position wanted: |
Transmission planning |
| Job category: |
Telecommunications |
| Preferred Location: |
Saudi Arabia |
| Objective and Resume Summary: |
|
Nsn transmission network planning coordinator
Out sourced by PT. Dyka - Jakarta, Indonesia February 2009 - Recently |
| Skills: |
|
| Known languages (and levels): |
English-Good
|
| Type of Employment wanted: |
Full Time
|
| Minimum Yearly Salary in Numbers: |
60000 USD
|
| Current Location: |
Indonesia, Jakarta |
| Education History, Qualifications & other additional information: |
| Level of Education: |
Masters
|
Education
Trisakti University January 2004 until November 2006
Jakarta, Indonesia
Master degree of Electrical Engineering majoring Telecommunication Management, GPA 3.4 (on a scale of 4.00) Regulation Management in Indonesia for Thesis
Trisakti University June 1997 until September 2002
Jakarta, Indonesia
Degree of Electrical Engineering (Telecommunication Engineering)
Professional Training
• Mini Satellite Application Course Held by the Indonesian Satellite Association (ASSI) & Satelindo March 2001.
• Group Dynamics & Team Sensitivity Training, 2002
• Microsoft Office Workshop (Word, Excel, power point), 1997
• Wireless Local Loop Implementation, Flexi Telkom, 2001
• Customer quality of service requirement, 2001
• Qualcomm Tele density Increase solution for Indonesia, 2001
• Aspects of Economy for CDMA implementation in Indonesia, 2001
• Human Resources Competency in Telecommunication Industry, 2002
• Microsoft role in reducing cost in telecommunication services, 2003
• CDMA implementation for Indonesian Telecommunication, 2003
• CDMA application for 3G, 2003
• Team building and outbound, 2006
|
| Work History & Experience: |
| Years of Work Experience: |
5 to 7 Years |
Professional experiences
Nsn transmission network planning coordinator
Out sourced by PT. Dyka - Jakarta, Indonesia February 2009 - Recently
TNP Rehoming National Coordinator for HCPT/Three Project
Nsn Transmission Network Planning
Out sourced by PT. Nexwave - Jakarta, Indonesia April 2007 - October 2008
Transmission Planning for NSN Indonesia on Indosat 2g project for Central Java Area
• Working with MapInfo, PathLOS
• Microwave planning:
- Microwave hop analysis
- Profile, terrain and ducting
- Transmission Capacity planning (capacity E1)
- Detail planning (Hop calculation, Link budget and requirement for implementation)
- Verification LOS Survey using PathLOS
- Database weekly & monthly maintenance
- 2MB Plan
- Network Topology
- Re homing & Re parenting
• Liaise and make coordination with internal, Customer, Solutions & Network Planner groups to assist with technical inquiries and ensure agreed design delivery methods.
• Designing transmission network topology, access network and backbone network.
• Supervise, maintain & acceptance for sites survey with base on Transmission LOS & doing coordination with RND & Customer.
• Maintain and monitoring transmission network capacity for any transmission requirement related to project needs for short and long term planning.
• Update transmission data base, and MapInfo.
• Coordinating with Transmission Implementation groups for the proper implementation of the designed transmission network. And also provide, monitor, support & assist for on-site technical support, transport route & any transmission implementation problems.
• Capacity Planning for TRS, BSC, MSC transmission network solutions to meet customer technical and financial requirements (BOQ) while conforming to network architecture standards.
• Reporting planning & implementation progress periodically and escalation the problems to Team Leader, TND Manager (Line Manager) & RF Planning Project Manager.
Ericsson Transmission Project Coordinator
Out sourced by PT. Xerindo December 2004 to May 2006
Jakarta, Indonesia
ERICSSON office Indonesia
Jabotabek Single Bss Inner Indosat Project, and Indosat 3g Project
Job Description:
• To keep change-out manager and Minilink manager informed about the progress and relevant matters related to implementation activities
• To take responsibility for dedicated clusters tasks and coordinate the activities within own discipline and with other
• Follow up blocking issues with other department and report it to change-out manager disciplines in the project
• To check Minilink site survey and LOS report and follow up missing data with partner, if any
• To ensure final installation binder is available prior to installation start date
• To ensure Minilink site is ready for integration prior to network cutover
• Supporting the preparation of Minilink implementation
• Managing the Final Acceptance Test (FAT) for the Minilink.
• To deliver Minilink site list with installation complete prior to workmanship inspection
• Follow up corrective action with service partner based on quality audit report
• To support partner during network cut-over
Transmission Network Planning
Pt. Duta Sembilan Kartika Telecom March 2003 to January 2004
Jakarta, Indonesia
Transmission Network Planning for Siemens Indonesia on INDOSAT project for Lampung, Padang, Bengkulu, Palembang (Sumatera)
• Perform for LOS survey & report for Telkomsel Central Java GSM transmission link (by using PathLos 4.0 and proper maps).
• Do coordination with Radio Network Design, Site Acquisition & Civil team for deciding nominal and candidates BTS position.
• Deciding the most suitable transmission equipment to be used.
• Detail Existing Survey (Indoor Transmission data, BBS, DDF mapping, Antenna Placement drawing, floor plan, space for existing and new equipment)
• Create Site Design Documents or Installation for review & approval by Siemens
• Los Survey for Backbone all Around Sumatera Island (Lampung, Padang, Bengkulu, Palembang)
• LOS Survey for New HOP and Transmission Swap
• Path LOS software report
• Site Installation Document/site binder
• Using Topographic map
Field Engineer
Pt. Soon Poh Telecommunications June 2002 to November 2002
Jakarta, Indonesia
Site Acquisition Staff; Nokia-Telkomsel Swap Upgrade BTS Jabotabek
(Upgrade, New Installation, Replacement)
• Perform site acquisition preliminary survey: In-building, Rooftop, Greenfield all around Jakarta Area
• Survey including: site location, site acceptance, Neighborhood permit, Lease negotiations, Electricity connection, pre-implementation acceptance, technical site survey, as built drawing
• Paper works: Neighborhood permit, Lease agreement, acceptance letter, government acceptance letter
• Detail survey, LOS survey, Installation Document, Implementation, Dismantling and/or install re-use material
Field Engineer; Ericsson-Excelcomindo (XL) BTS Installation
• Perform installation supervision, supervise more than 5 teams (5-10 person/team)
• In-building turnkey installation implementation coordination and supervision
- Material Arrival - Floor Plan- Schematic Diagram- Data Configuration - Labeling - Cable Tray
|
|
|
|