From: August 2006 To: Till date
Employer: DevCon-ACE-KCI-ESL Consortium Consultants.
Positions held: Team Leader
From: August 2004 To: August 2006
Employer: Parsons Corporation (U.S.A) in association with ESL (Bangladesh)
Positions held: Resident Engineer
From: January 2001 To: July 2004
Employer: Japan Overseas Corporation & Bangladesh Consultants Ltd. (Joc-bcl)
Positions held: Resident Engineer
From: December 1998 To: December 2000
Employer: Dhv-ces-ddc-dul Consulatnt
Positions held: Resident Engineer
From: October 1995 To: November 1998
Employer: Snowy Mountain Engineering Corporation & Bangladesh Consulltants Ltd.
Positions held: Asstt. Resident Engineer/Highway Engineer
From: January 1994 To: September 1995
Employer: Mir Akhter Hossain Ltd (Bangladesh) & China Harbour (China) Jv.
Positions held: Deputy Project Manager
From: January 1993 To: December 1993
Employer: Samwhan Corporation (South korea) & Mir Akhter Hossain Ltd (Bangladesh) Jv.
Positions held: Material Engineer
From: December 1990 To: December 1993
Employer: Samwhan Corporation (South Korea) & Mir Akhter (Bangladesh) Jv.
Positions held: Planning Engineer
From: October 1988 To: November 1989
Employer: F.F. Cruz (Philippines) & Mir Akhter (Bangladesh) Jv.
Positions held: Junior Highway Engineer
|
| Skills: |
Team Leader, Resident Engineer/Project Manager |
| Known languages (and levels): |
English-Very GoodArabic-GoodOther: Bengali
|
| Type of Employment wanted: |
Full Time
|
| Minimum Yearly Salary in Numbers: |
60000 USD
|
| Current Location: |
Bangladesh, Dhaka |
| Education History, Qualifications & other additional information: |
| Level of Education: |
Masters
|
Education Bachelor of Science in Engineering, Department of Civil Engineering
University : Chittagong University of Engineering & Technology (CUET) (Erstwhile BIT, Chittagong)
Duration of Course : Four years
Year of Passing : 1988
Masters of Business Administration (Finance)
Department of Business studies
United International University, Dhaka, Bangladesh.
M.Engg. (Transportation Engineering) perusing –likely completion by the mid of 2010.
Dhaka University of Engineering & Technology
Gazipur, Dhaka
|
| Work History & Experience: |
| Years of Work Experience: |
More than 15 Years |
Name of assignment or project:
Project: Supervision of 3rd Buriganga Bridge in Dhaka, Bangladesh, implenting under FIDIC conditions of contract (KFAED Funded)
Year: August 2006 to till date
Location: Bangladesh
Client: Roads & Highways Department
Project Cost : U.S $15 million
Features of the project bridge: Supervision of 708m long, having superstructure of PSC box girder in main stream and PSC I girder in approach on pile foundation. The project scope also includes construction of a 2-lane standard carriageway approach roads on both ends (Total length 2.64 km) with necessary road appurtenants.
Positions held: Team Leader
Duties and tasks performed:
• Bridge & Road construction supervision activities , approve construction materials, workmanship and quality control activities including quality assurance plan (QAP).
• Responsible for supervision , contract administration and management and quality control.
• Explain and /or adjust ambiguities and/or discrepancies in the Contract Document and to provide assistance to the Client (RHD) in the settlement of disputes with the Contractors.
• Reviewing , verifying and further detail the design of the contract works to approve the Contracts “working drawings if necessary , to issue further drawings and or to give instructions to the Contractors for any works which may not sufficiently detailed in the contract document.
• Approving and rejecting data for setting out of work
• Approving the Contractors’ superintendence key personnel , construction programmes , land to be occupied by the Contractors, materials and sources of materials.
• Ordering special tests of materials or completed works and/or removal and substitution of improper materils and/or work as required.
• Controlling and appraising the progress of the works , to order suspension of works and to authorize, with the Clients’ approval , extensions of the period for completion of the works.
• Issuing variation orders, to evaluate variations , to fix rates for unpriced work , to order day work after obtaining prior approval of the Client, and/or to make recommendation to the Client regarding alternatives.
• Issuing interim certificates for payment to the Contractors on the basis of measured work items or to certify the completion of the works or parts thereof; the interim and final measurements of work recorded by Engineer’s Representatives shall be subject to percentage check by the Clients designated representative(s)
• Inspecting the works periodically , during the construction period and Defects Liability Period and to issue Defects Liability Certificates after the rectification by the Contractor of possible defects
• Carrying out generally all the duties of the Engineer as specified in the Contract , within the limitation specified therein;
• Advising the Client on all matters relating to claims from the Contractor and to make recommendations thereon; including the possible resource to arbitration.
• Preparing a Construction Supervision Manual outlining routines and procedures to be applied in contract management, construction supervision and administration and
• Recording of the progress of the works, including keeping and regularly updating , records of all construction activities , inspections, site meetings, quantity measurements, payments to the Contractor, etc and reporting such progress on a regular monthly basis to the Engineer, together with recommendations for expediting the works and for solving technical or contractual problems encountered by the Contractor which are causing , or have the potential to cause , delay in the works.
Name of assignment or project:
Bibiyana gas development project, Sylhet, Bangladesh, implanted under FIDIC Condition of Contract.
A) Sherpur to Southpad & Southpad to NorthPad (15 Km. Road)
B) Construction of 2000 Nos. Piles & different foundation of tanks & other machine foundation.
C) Construction office & residential Building
Year : August 2004 to August 2006
Location: Bangladesh
Client: Chevron (Bangladesh) Ltd.
Project Cost : U.S $30 million
Main project features: a) Supervision of embankment work,, improved subgrade, sub-base, lower base, upper base course , asphalt concrete of binder and wearing course, 1 Nos. Prestressed I girder bridge on cast-in-situ , 7 Nos. RCC Multi-cell box culvert necessary road appurtenants.
B) Supervision of 1890 bored piles construction ( in North Pad and South Pad sites) , 20,000 cu.M of concrete work for different foundation of tank & machine foundation of a gas field
C) Supervision two storied office & residential building of 21,000 sq.Ft.
Positions held: Resident Engineer
Duties and Tasks performed:
As a Resident Engineer responsible for ;
• Preparation of construction supervision manuals , quality assurance manuals etc.
• Review/modifications in designs and working drawings.
• Used modern survey equipment like Total Stations, Autolevels etc.
• Checking and readjustment of alignment, review/modification of quantities to suit to prevailing site condition.
• Design and drawing for temporary works as – staked drawings, variation orders, instructions, contractual notices, correspondences.
• Day to day construction supervision and inspection of works, sampling and testing of materials an works including embankment, subgrade, granular sub base; quality assurance in accordance with Aashto/astm?bs standard and contract specifications.
• Checking and certification of materials and works.
• Scrutinizing /checking/certification of advances , interim bills/invoices, contract completion certificates, maintenance certificates, as-built drawings , project completion reports.
• Provide complete technical guidance to staff an contractor.
• Liaison with the client and other concerned authority for the project performance.
• Ensuring proper execution of road , culverts and bridge works , concrete work for foundation and building construction work as per the specifications.
• Preparation of monthly progress reports, monitoring the environmental monitoring plan and implementation on site.
• Conducting the weekly /montly progress review meeting with the Team Leader and the concerned department.
• Implementing the Health, Environmental & Safety (HES) aspects among our staffs, client and the contractors.
Name of assignment or project:
Project: Southwest Road Network Development Project, Contract No.3, , Bhanga-Bhatiapara National Highway in Bangladesh (37.6 Kms. Length), Implemented under FIDIC condition of contract (ADB funded)
Year: January 2001 to July 2004.
Location: Bangladesh
Client: Roads & Highways Department
Project Cost : U.S $35 million
Features of the project bridge: Supervision of embankment with geo-grid, improved subgrade, sub-base, lower base, upper base course , asphalt concrete of binder and wearing course, 11 Nos. Prestressed I girder bridge on cast-in-situ and pre-cast pile foundation, 90 Nos. RCC Multi-cell box culvert necessary road appurtenants.
Positions held: Resident Engineer
Duties and tasks performed:
As a Resident Engineer responsible for ;
• Administration and management of project under FIDIC condition of contract.
• Interperetation of technical specifications an contract documents.
• Scrutinize the contractor’s detailed work program, method statements and suggest modification (if any).
• Check and approve working and detailed drawings.
• Provide technical audit of work to detect financial irregularities and ensure financial discipline and minimize large scale change in during execution.
• Preparation of construction supervision manuals , quality assurance manuals etc.
• Review/modifications in designs and working drawings.
• Used modern survey equipment like Total Stations, Autolevels etc.
• Checking and readjustment of alignment, review/modification of quantities to suit to prevailing site condition.
• Design and drawing for temporary works as – staked drawings, variation orders, instructions, contractual notices, correspondences.
• Day to day construction supervision and inspection of works, sampling and testing of materials an works including embankment, subgrade, granular sub base; quality assurance in accordance with Aashto/astm?bs standard and contract specifications.
• Checking and certification of materials and works.
• Scrutinizing /checking/certification of advances , interim bills/invoices, contract completion certificates, maintenance certificates, as-built drawings , project completion reports.
• Provide complete technical guidance to staff an contractor.
• Liaison with the client and other concerned authority for the project performance.
• Ensuring proper execution of road , culverts and bridge works , concrete work for foundation and building construction work as per the specifications.
• Preparation of monthly progress reports, monitoring the environmental monitoring plan and implementation on site.
• Conducting the weekly /montly progress review meeting with the Team Leader and the concerned department.
• Implementing the Health, Environmental & Safety (HES) aspects among our staffs, client and the contractors.
Name of assignment or project: 3rd Road Rehabilitation & Maintenance Project (Rrmp-iii), Contract-1 “Construction of Nalka –Hatikamrul-Bonpara New Road” road in Bangladesh. Implemented under FIDIC condition of contract (World Bank Funded),
Year: December 1998 to December 2000
Location: Bangladesh
Client: Roads & Highways Development.
Project Cost : U.S $7.0 million
Main project features: Supervision of 4.0 Km long, 2-lane existing road of National Highway standard involving earth work, Sub-base, Lower-base, Upper-base, Asphalt concrete binder & Wearing courses and Bituminous surface treatment works with 2 Nos. Pre-stressed girder bridges and 6 Nos. RCC multi-cell box culverts, square intersection (Rotary Round about) & Protection works around bridge & culvert locations and Road appurtenant works.
Positions held: Resident Engineer.
Duties & Tasks performed:
• Construction supervision and contract management for re-construction of 4 km of existing road with bridges and culverts as per contract Specifications.
• Preparation of construction supervision manuals , quality assurance manuals etc.
• Review/modifications in designs and working drawings.
• Used modern survey equipment like Total Stations, Autolevels etc.
• Checking and readjustment of alignment, review/modification of quantities to suit to prevailing site condition.
• Design and drawing for temporary works as – staked drawings, variation orders, instructions, contractual notices, correspondences.
• Day to day construction supervision and inspection of works, sampling and testing of materials an works including embankment, subgrade, granular sub base; quality assurance in accordance with AASHTO/ASTM/BS standard and contract specifications.
• Checking and certification of materials and works.
• Scrutinizing /checking/certification of advances , interim bills/invoices, contract completion certificates, maintenance certificates, as-built drawings , project completion reports.
• Responsible for supervision of road & structural works.
• Responsible for construction supervision , quality control , contract administration and management.
• Responsible for preparation of quality assurance system/procedure manual /construction supervision manual and implementation.
• Approved & issued working drawings and As- Built drawings.
• Checked setting out , design of cement concrete –bituminous & no-bituminous mixes , evaluation trial stretches of pavement layers and suggest modifications.
• Approved works method statement –sequence & construction program.
• Approved completed works and reject improper works .
• Checked and certify contractor’s payment statement .
• Checked and recommended contractor’s claim for time extension and disputes.
• Assisted client in issuing variation orders , recommended issuing completion certificate and impart training to client site staff.
Name of assignment or project: 2nd Road Rehabilitation & Maintenance Project (Rrmp-ii), Contract-4 “Construction of Rajshahi to Nawabgonj national highway section (447.5 Kms) in Bangladesh.(World Bank Funded), Cost: Us $ 19.11 millions.
Year: October 1995 to November 1998.
Location: Bangladesh
Client: Roads & Highways Development.
Main project features: Supervision of of 47.5 Km long, 2-lane road of National Highway standard involving embankment (8 Kms. New alignment) , Improved subgrade, Sub-base, base course, Asphalt concrete binder & Wearing courses with 27 Nos. RCC multi-cell box culverts, 17 Nos. RCC pipe culvert, square intersection (Rotary Round about) & Protection works around bridge & culvert locations and Road appurtenant works.
Positions held: Assistant Resident Engineer /Highway Engineer
Duties & Tasks performed:
As Asstt. Resident Engineer/ Highway Engineer responsible for :
• Assisting RE for the supervision of the construction work.
• Day to day detail supervision of embankment and pavement work as per contract drawing and specifications.
• Formal communication with contractors agents, clients and resolving site problems including all site persons in quality and safety issues.
• Checking the measurement and keeping all necessary records.
• Approving the materials sources
• Checking and approving the drawing for temporary works.
• Design of minor modification and corrections wherever needed overall document control from project sites.
• Liaison with local authorities , clients and other district administration.
• Attending weekly site rolling program meetings and the monthly quality & progress meetings and reviewing the contractors work program etc.
• Involved with the setting out of center line , curve and superelevation.
• Coordinated the junior Engineers, Surveyors and other field related personnel.
• Participated in the joint measurement with the contractor for preparing monthly interim statement.
• Submitted daily , weekly , fortnightly and monthly progress to the Resident Engineer.
• Responsible for construction supervision , quality control of materials & works and contract administration.
• Inspection and checking of setting out of works.
• inspection of contractor’s plant & equipment, certification of completed works & rejection of improper works.
Name of assignment or project: 2nd Road Rehabilitation & Maintenance Project (Rrmp-ii), Contract-4 “Periodic Maintenance of Tekerhat to Barisal national highway section (75 Kms) in Bangladesh. Implemented under FIDIC condition of contracts (World Bank Funded), Cost: US $ 9.38 millions.
Year: January 1994 to September 1995.
Location: Bangladesh
Client: Roads & Highways Development.
Project Cost: US $15
Main project features: Periodic maintenance consisting asphalt overlay work , reinstatement and development of shoulder and Road appurtenant works.
Positions held: Deputy Project Manager.
Duties & Tasks performed:
• Preparation of program of works and it’s implementation. Also responsible for planning & procurement of resources and materials
• Execution of construction activities for construction of asphalt overlay work with shoulder development work..
• Establishment and management of a well equipped project materials testing laboratory for conducting the specified tests during construction on materials and works as per Aashto, Astm and British Standards test procedures.
• Preparation of payment applications and Variation Order applications and follow up actions for approval and attending of post completion activities.
Name of assignment or project:
2nd Road Rehabilitation & Maintenance Project, Contract No. 1/2B, Ullapara -Bhagabari Highway (25 Km.), World Bank funded, Cost: Us $ 15.62 millions.
Year: January 1993 to December 1993
Location: Bangladesh
Client: Roads & Highways Department.
Main project features: Construction of Earth work, Sub-grade, Lime stabilized Sub-base, Lower base, Upper base, Asphalt binder and Wearing courses, 120m long pre-stressed I girder bridges on cast-in-situ pile foundation, 25 Nos. RCC Multi-cell box culverts, 15 Nos. RCC pipe culverts and Road appurtenants works.
Positions held: Material Engineer
Activities performed:
• Detailed inspection and test plan preparation.
• Carryout necessary lab and field test for the embankment, improved subgrade, subbase, base course etc.
• Design of job mix formula for asphalt and concrete mixes.
• Executed daily bitumen extraction and marshal stability tests.
• Executed field quality control tests pertaining to earthwork excavation /filling road base works and asphalt paving works viz. Determination of field densities by nuclear gauge method ,determination of prime/tack coat application rates, asphalt laying control test etc.
• Organized the specialized tests in independent laboratory.
• Controlled the quality of raw materials from suppliers and processing of controlled mixes for various items as per approved mix design.
Name of assignment or project: Feeder Roads Improvement Project (FRIP), Contract 6, 7 & 8, Shepur-Jamalpur-Nalitabari, Sherpur-Nakla –Phulpur and Sherpur-Jhulgaon-Jhenaigati roads (total length 92 Kms), Implemented as per FIDIC condition of contract. (ADB funded).
Year: December 1990 to December 1993
Location: Bangladesh
Client: Roads and Highways and Department
Project Costs : US$32 millions
Main project features: Construction of embankment, Sub-grade, stone aggregate sub-base, stone aggregate base, asphalt concrete binder & wearing courses and bituminous surface treatment works, 102m long pre-stressed I girder bridge on cast-in-situ pile foundation, 175 nos. New RCC box culverts and Road appurtenants.
Positions held: Planning Engineer
Activities performed:
• Conducted the details survey of the project.
• Prepared shop drawing as cross-sections, long profile of the road as well as shop drawing for bridge & culverts.
• Prepared works program .
• Calculated the quantity of the project as well as requirement of materials.
• Prepared IPC, Variation orders and claim of the project.
• Monitored the progress of the project.
• Maintained liaison with our construction , procurement , mechanical, quality control & administrative division.
• Prepared the forwarding letter of the project.
• Participated in the all sorts of meeting in the project with the project management.
•
Name of assignment or project: 2nd Road Rehabilitation & Maintenance Project, Contract No. 1/1B, Ullapara - Bogra Highway (50 Kms), Implemented under FIDIC condition of contract (World Bank funded). Millions
Year: October 1988 to November 1989
Location: Bangladesh
Client: Roads and Highways department
Project Cost : US $20.68 million
Main project features;
1) Construction of Embankment, sub-grade, sub-base, base, asphalt binder & wearing courses, 6 Nos. Pre-stressed I girder bridges on cast-in-situ and pre-cast pile foundation, 66 Nos. RCC box culverts.
Positions held: Junior Highway Engineer
Activities performed:
• Involved in execution of construction of road embankment and pavement.
|
|
|
|