|
|
| Gewünschter Job: |
Management Traning Programs |
| Job Kategorie: |
Allgemeiner Sektor |
| Zielvorstellung und Zusammenfassung: |
|
| I am interested in joining a training program in the field of Lean Management or Management in general, in which I could learn and do at the same time guided by experts and contribute to the company’s performance. |
| Kenntnisse: |
Pro-engineer,
C-Mold (Mold and plastic parts design and simulation),
EM Plant,
SAP APO and R/3
Visio.
|
| Sprachkenntnisse (und Grad): |
Englisch-Sehr GutDeutsch-GutSpanisch-Sehr Gut
|
| Bevorzugte Beschäftigungsart: |
Vollzeit
|
| Minimales Jahresgehalt in Zahlen: |
Keine Angabe
|
| Aktueller Ort: |
Deutschland, Berlin |
| Ausbildung: |
| Grad der Ausbildung: |
Master
|
2006-2008: Master of Sciences in Global Production Engineering. TU-Berlin, Germany.
GPA: 1.6 (1 = best)
1998-2005: Materials Science Engineering, Polymers. Universidad Simón Bolivar (USB). Venezuela.
|
| Berufserfahrung: |
| Ihre Erfahrung in Jahren: |
1 to 2 Years |
2008: Professional Internship. Mercedes Benz, Daimler AG (from April to July 2008)
Process Improvement Department for standard inspections. Powertrain factory, Mettigen. Main functions related to Lean Manufacturing: preparation, performance and analysis of “in factory” inspections; including machines and personnel layouts, material flow diagrams related to the process-chain, standardized work forms and value stream mapping.
2005-2006: Coordinator for Innovation and Technology. Phoenix Packaging Group.
Research, propose and implementation of several measures committed to achieve manufacturing and products optimization (including factory re-design, products and production systems, material flow analysis, automation, internal consultant).
2004-2005: Professional Internship. Department for Control and Quality Assurance. Teleplastic, C.A
Research-Industrial project developed to determine the causes for changes in Flexible Packaging Friction Coefficient. Recommendations about product storage and handling conditions were found and implemented.
|
|
|
|