Technical Construction Manager (m/f/d) – PV & HV Infrastructure (m/f/d) ID27126-2
Verfasst am 2026-08-11
-
Bau/Baubetrieb
Elektrotechnik-Ingenieur, Bauingenieur, Baustellenleiter -
Ingenieur
Elektrotechnik-Ingenieur, Bauingenieur, Baustellenleiter
Technical Construction Manager (m/f/d) – PV & HV Infrastructure (m/f/d) ID27126-2
Technical Construction Manager (m/f/d) – PV & HV Infrastructure (m/f/d) ID27126-2
Project Description
A large-scale solar PV project in Northern Germany is currently in its final construction and commissioning phase. The site is almost finalized, with commissioning activities, punch list works and other minor items still outstanding.
The PV park consists of a 17 MWp ground-mounted solar installation on a landfill site, including a fixed substructure and a high-voltage grid connection within an existing substation infrastructure.
The aim of the project is the successful technical completion, comprehensive documentation and final handover of the PV park and the associated substation infrastructure.
Task DescriptionThe scope of services includes the following tasks, which are performed independently by the external contractor based on their own knowledge and experience:
- Provision of technical consultation and recommendations for interface alignment of construction activities executed by external subcontractors on-site regarding technical milestones and project schedules, without exercising operational or disciplinary leadership over client staff or third parties.
- Technical tracking and reporting of construction progress, material availability and project schedules during the project execution phase, including the preparation of a recommendation paper to identify potential delays and potential resource bottlenecks for upcoming project milestones and handover to project management for decision-making.
- Consolidation and technical analysis of project deliverables from external stakeholders, including the independent assessment of project execution regarding its alignment with technical plans and defined project requirements.
- Participation in weekly progress meetings to present technical status updates on own deliverables, as well as the technical review of the weekly progress reports submitted by the Engineering, Procurement, and Construction (EPC) contractor.
- Technical inspection of site safety practices and technical documentation of identified unsafe conditions for site management to facilitate regulatory compliance, without assuming the legal or operational HSE responsibility.
- Execution and documentation of independent quality inspections and creation of the corresponding technical documentation, including photographic evidence, inspection reports and quality records.
- Technical identification, documentation and evaluation of technical deviations, and formulation of resolution proposals for Non-Conformance Reports (NCRs).
- Creation of technical construction schedules during the development phase and conceptualization of project-specific technical improvements explicitly limited to the defined project deliverables.
- Preparation of weekly project status reports regarding construction milestones, detailing the technical progress, achieved milestones and identified technical risks, and handover to the Project Manager as the single point of contact.
- Creation of a final report covering all deliverables mentioned above and handover to the project management for review and further use.
- Several years of experience as a Technical Construction Manager, Site Manager, Construction Manager or Site Engineer
- Experience with ground-mounted solar PV installations
- Experience in the technical coordination of EPC contractors and subcontractors
- Experience in construction progress monitoring and milestone tracking
- Experience in construction scheduling and project timeline management
- Experience in identifying delays, resource bottlenecks and technical risks
- Experience in commissioning and punch list management
- Experience in quality inspections and QA/QC activities
- Experience in the preparation of inspection reports, quality records and photographic documentation
- Experience with Non-Conformance Reports (NCRs) and technical deviations
- Experience with high-voltage (HV) infrastructure and grid connection projects
- Experience with substations and electrical infrastructure
- Good understanding of the electrical integration and grid connection of PV plants
- Ex…
Um nach Stellen zu suchen, sie anzusehen und sich zu bewerben, die Bewerbungen aus Ihrem Standort oder Land akzeptieren, klicken Sie hier, um eine Suche zu starten: