Production Scheduler
Listed on 2026-10-27
-
Manufacturing / Production
Operations Management, Manufacturing & Industrial Operations
Korpack is a food-grade (SQF) co-packer for leading consumer brands, providing contract packaging, packaging materials and automation in the western Chicago suburbs. We're doubling into 350,000 sq ft across two facilities, Bloomingdale and St. Charles, and investing in the people and systems to run them. Two things define how we work. Efficiency: lines that run to standard, every shift. Accuracy: work orders, inventory and shipments that are right the first time in our ERP (Acumatica).
Our customers see their product move work-order by work-order, and we've promised them no delay. If you want a place where your work shows up in the numbers, keep reading.
About the Job
Korpackis a food-grade, SQF-certified contract packaging company — and athree-time Inc. 5000 honoree in the last six yearsas one of America's fastest-growing companies. Growth like ours createsa very specific kind of scheduling challenge: a wide variety of products, customers whose needs change fast, and a production plan thathas toflex without breaking.
We'relooking for a Production Scheduler who thrives in exactly that environment. Not someone who prints a schedule Monday and defends it all week — someone who treats the schedule as a living thing, re-sequences with confidence when reality changes, and keeps production, materials, and shipping all rowing in the same direction while it happens.
The Journey
You'llreport to our Director of Manufacturing Operations and own the production schedule across our facilities. Your day lives inside our ERP (Acumatica) and scheduling tools — building the plan,validating material availability, sequencing changeovers intelligently, and communicating changes so the floor is never surprised.
You'llwork shoulder-to-shoulder with Production Managers, Materials Managers, and our customer-facing teams. When a customermovesa date, when a line goes down, when materials land early or late —you'rethe person who reworks the puzzle and gets the newanswer outfast.
What Success Looks Like
- The floor runs off the schedule — because the schedule is accurate, achievable, and current
- Schedule changes are absorbed in hours, not days, and communicated before they become surprises
- Changeovers are sequenced to minimize downtime, not just to check boxes
- Material availability is confirmedbeforea job is scheduled, not discovered when the line is waiting
- On-time performance to customer commitments climbs and stays there
- The schedule lives in the system — visible, current, and trusted — not in a spreadsheet only you understand
Requirements
- Experience scheduling in a fast-paced manufacturing environment is required— food packaging or food-grade experience is strongly preferred, including familiarity with allergen sequencing, sanitation windows,lot control, and why food products add extra scheduling considerations.
- Experience with co-manufacturing or co-packing is a plus— you understand what it means to run someone else’s product, on their timeline, to their specifications.
- Highly tech savvy—you'regenuinely comfortable living in an MRP/ERP system and dedicated scheduling software, and you pick up new tools fast (we run Acumatica)
- Experience scheduling in ahigh-mix environment— a company that makes a wide variety of products with frequent schedule changes, not one SKU on repeat
- Strong communicator — you deliver schedule changes clearly, quickly, and without drama
- Organized under pressure — you can hold competing priorities and re-sequence without losing the thread
The Challenges
Let'sbe honest: co-packing means the schedule changes. A customer's launch moves, a truck shows up a day early, a line needs maintenance — and your beautiful plan from this morning is history. This role is not for someone who finds schedule changes…
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).