Electrical Engineer – Nuclear Waste Facility
Listed on 2026-10-15
-
Engineering
Electrical Engineering
SIMCO, LLC at the WIPP site in Carlsbad, New Mexico seeks an Electrical Engineer to perform engineering calculations, analyze designs, and document decisions supporting safe operation of TRU waste facilities.
The role interfaces with QA, procurement, project management, and operations; provides field leadership to resolve equipment malfunctions; maintains drawings, specs, and system health records; and ensures compliance with DOE security and site requirements.
This opportunity is for the Electrical Engineer – Nuclear Waste Facility, 4‑Day Week role at SIMCO, LLC.
We are currently recruiting a Electrical Engineer – Nuclear Waste Facility, 4‑Day Week for our team in Carlsbad, NM, United States.
This is a genuine position to take on the Electrical Engineer – Nuclear Waste Facility, 4‑Day Week role at SIMCO, LLC.
As a Electrical Engineer – Nuclear Waste Facility, 4‑Day Week, you will play an important part at SIMCO, LLC in Carlsbad, NM, United States.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).