×
Register Here to Apply for Jobs or Post Jobs. X

Mechanical Fire Sprinkler Project Manager

Job in City Of London, Central London, Greater London, England, UK
Listing for: EA-RS Fire Management Ltd
Full Time position
Listed on 2026-09-16
Job specializations:
  • Engineering
    Mechanical Engineer, Operations Management
Salary/Wage Range or Industry Benchmark: 55000 - 75000 GBP Yearly GBP 55000.00 75000.00 YEAR
Job Description & How to Apply Below
Location: City Of London

EA-RS Group – Mechanical Fire Sprinkler Project Manager

Join one of the UK's fastest-growing fire and security specialists.

Who we are

EA-RS Group Ltd provides end-to-end fire safety, security, and compliance solutions, helping organisations keep people and buildings safe. We design, install, and maintain critical systems including fire alarms, suppression systems, and security controls across sectors such as healthcare, education, housing, and commercial properties.

Purpose of the role

EA-RS Group require a self-motivated individual who can manage all aspects of mechanical sprinkler or water mist suppression systems.

The role requires a pro-active and pragmatic individual who can work alone and part of a team to collaborate with all relevant contributors for the design, supply, installation and commissioning of the systems with excellent communication and quality results to our customers.

The project manager will have direct involvement from pre-order through to final account and warranty period.

Key tasks
  • To review allocated project(s) from technical and commercial perspectives as part of handover process.
  • To setup and structure allocated new project(s), following handover, ensuring systems are accurately maintained throughout project(s) life cycle
  • To create and issue a Project program and task schedule (WBS) that meets the allocated projects client time frame / issued program of works and clearly defines all key tasks and critical path actions
  • To setup procurement schedule / cash flow (cost & sales) forecasts following handover, and to ensure margin is maximised and a positive cash flow is maintained throughout project(s) life cycle
  • To liaise, formally task and work closely with the Design Team Group to provide detailed design drawings and calculations during pre-construction phase of the allocated project(s) and to submit those documents to the client team for approval using a formal control mechanism.
  • To act as main point of contact and work manage from office and site locations all design, planning, procurement, co-ordination, installation, commissioning, handover elements of the allocated project(s) incl. all mechanical, electrical, documentation and ancillary works that make up the project(s) scope, using the appropriate departments within the company and sub-contractor support (as/when) necessary, ensuring all work is installed to program, to the highest quality, to the relevant standards and to ensure the company is not exposed to commercial risk.
  • To ensure that our Program(s), Design Drawings, Calcs, RAMS, Quality Plans, Technical / Sample / Benchmark submittals, Plant / Tool Registers etc are produced during pre-construction phase of the allocated project(s) and to submit those documents to the client team for approval using a formal control mechanism. Then to maintain these drawings and documents throughout the project(s) life cycle.
  • Monitor progress/programme identify any issues via early warning notice to ensure these are captured/issued on regularly basis.
  • To ensure that all operatives are working within Health and Safety guidelines and are working to up to date and agreed (approved) SSOW (Method Statements and Risk Assessments) by regular review.
  • To ensure that quality documentation (check sheets) and relevant certification is produced, completed, signed off and issued as part of the build, commissioning and handover stages of the project(s).
  • LPCB supervision inspections, ensure these are booked at the correct stages of the project with the design department.
  • 50% of 1st fix install – only guide can be agreed with design department once progress on site is established.
  • LPCB observations are rectified in timely manner.
  • Sprinkler pumps demo on completion of manufactures on site commissioning.
  • To maintain and where possible improve project margin over that agreed and accepted at Sales/Operations handover at commencement of project, identify margin erosions early as possible to SMT, to ensure these are captured early.
  • To maintain cost control and ensure that all applications / invoices / variation costings and claims are current and up to date and submitted monthly in an agreed time frame, working closely with QS ensuring variations are recovered in timely manner.
  • To issue a weekly progress report to client/contracts teams in an agreed format
  • Carry out cost to completes monthly
  • To report monthly financial & installation progress, WIP etc on contract review form and to attend monthly Contract reviews with Contracts Manager or…
To View & Apply for jobs on this site that accept applications from your location or country, tap the button below to make a Search.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
 
 
 
Search for further Jobs Here:
(Try combinations for better Results! Or enter less keywords for broader Results)
Location
Increase/decrease your Search Radius (miles)
0
200
Filters
Education Level
Experience Level (years)
Posted in last:
Salary