Mechanical Fire Sprinkler Project Manager
Listed on 2026-09-16
-
Engineering
Mechanical Engineer, Operations Management
EA-RS Group – Mechanical Fire Sprinkler Project Manager
Join one of the UK's fastest-growing fire and security specialists.
Who we areEA-RS Group Ltd provides end-to-end fire safety, security, and compliance solutions, helping organisations keep people and buildings safe. We design, install, and maintain critical systems including fire alarms, suppression systems, and security controls across sectors such as healthcare, education, housing, and commercial properties.
Purpose of the roleEA-RS Group require a self-motivated individual who can manage all aspects of mechanical sprinkler or water mist suppression systems.
The role requires a pro-active and pragmatic individual who can work alone and part of a team to collaborate with all relevant contributors for the design, supply, installation and commissioning of the systems with excellent communication and quality results to our customers.
The project manager will have direct involvement from pre-order through to final account and warranty period.
Key tasks- To review allocated project(s) from technical and commercial perspectives as part of handover process.
- To setup and structure allocated new project(s), following handover, ensuring systems are accurately maintained throughout project(s) life cycle
- To create and issue a Project program and task schedule (WBS) that meets the allocated projects client time frame / issued program of works and clearly defines all key tasks and critical path actions
- To setup procurement schedule / cash flow (cost & sales) forecasts following handover, and to ensure margin is maximised and a positive cash flow is maintained throughout project(s) life cycle
- To liaise, formally task and work closely with the Design Team Group to provide detailed design drawings and calculations during pre-construction phase of the allocated project(s) and to submit those documents to the client team for approval using a formal control mechanism.
- To act as main point of contact and work manage from office and site locations all design, planning, procurement, co-ordination, installation, commissioning, handover elements of the allocated project(s) incl. all mechanical, electrical, documentation and ancillary works that make up the project(s) scope, using the appropriate departments within the company and sub-contractor support (as/when) necessary, ensuring all work is installed to program, to the highest quality, to the relevant standards and to ensure the company is not exposed to commercial risk.
- To ensure that our Program(s), Design Drawings, Calcs, RAMS, Quality Plans, Technical / Sample / Benchmark submittals, Plant / Tool Registers etc are produced during pre-construction phase of the allocated project(s) and to submit those documents to the client team for approval using a formal control mechanism. Then to maintain these drawings and documents throughout the project(s) life cycle.
- Monitor progress/programme identify any issues via early warning notice to ensure these are captured/issued on regularly basis.
- To ensure that all operatives are working within Health and Safety guidelines and are working to up to date and agreed (approved) SSOW (Method Statements and Risk Assessments) by regular review.
- To ensure that quality documentation (check sheets) and relevant certification is produced, completed, signed off and issued as part of the build, commissioning and handover stages of the project(s).
- LPCB supervision inspections, ensure these are booked at the correct stages of the project with the design department.
- 50% of 1st fix install – only guide can be agreed with design department once progress on site is established.
- LPCB observations are rectified in timely manner.
- Sprinkler pumps demo on completion of manufactures on site commissioning.
- To maintain and where possible improve project margin over that agreed and accepted at Sales/Operations handover at commencement of project, identify margin erosions early as possible to SMT, to ensure these are captured early.
- To maintain cost control and ensure that all applications / invoices / variation costings and claims are current and up to date and submitted monthly in an agreed time frame, working closely with QS ensuring variations are recovered in timely manner.
- To issue a weekly progress report to client/contracts teams in an agreed format
- Carry out cost to completes monthly
- To report monthly financial & installation progress, WIP etc on contract review form and to attend monthly Contract reviews with Contracts Manager or…
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).