Supply Chain Coordinator; Logistics,Forecasting & Freight Admin
Listed on 2026-09-01
-
Supply Chain/Logistics
Logistics Coordination, Supply Chain & Logistics, Freight
Location: City of London
Location: London Office
Contract: Full-time
Reports to: Production & Operations
Working hours: 09:00-17:30 UK time, with flexibility for early-morning contact
with Asia-based suppliers]
Salary: Dependent on experience
About us
We are a consumer health and wellness brand selling across the UK, EU and US.
Our products are manufactured in Asia and distributed through national retailers, e-commerce marketplaces and our own DTC channels.
We move air, ocean and road freight globally, and a large part of our range is classified as dangerous goods.
The operations team is small, fast-moving and hands-on. There is no layer of middle
management to hide behind - you will own your workload end to end and speak directly with
suppliers, forwarders and internal stakeholders every day.
We’re looking for a motivated self-starter who is hungry to grow and learn in both this role and
the business.
Competence and curiosity in how AI can supercharge productivity in this role is essential to
success.
Key responsibilities
1. Freight and logistics execution
- Request, compare and log freight quotes across air, ocean (FCL and LCL) and road,
from our nominated forwarders and carriers.
- Raise bookings, confirm pickup-ready dates with suppliers and book collections at origin.
- Prepare, collect and check the full shipping document pack before departure:
commercial invoice, packing list, bill of lading or air waybill, certificate of origin, HS
codes, SDS, UN38.3 test summaries and dangerous goods declarations.
- Check documents against the purchase order and against the destination country's
import requirements before release. Catch errors at origin, not at the port.
- Track shipments daily from booking to delivery. Chase forwarders for milestone updates
and flag delays, rolled sailings, port congestion or customs holds as soon as they
appear, not after the ETA has passed.
- Hand over accurate, timely inbound data to the Operations Manager so that receipts can
be announced and booked into the warehouse and into retailer routing portals correctly.
- Maintain the shipment tracker as the single source of truth: booking references,
container and AWB numbers, ETD/ETA, milestone dates, costs and status.
2. Dangerous goods
Our range includes lithium-ion battery products (UN3481) and essential oil based liquids
(UN3082 and similar). Getting this wrong stops shipments, costs money and creates regulatory
exposure.
- Identify which shipments are regulated and under which mode: IATA DGR for air, IMDG
for ocean, ADR for European road, 49 CFR for US domestic movements.
- Maintain and version-control the DG document library: SDS, UN38.3 test summaries,
DG transport reports and battery test data. Check validity and expiry dates against every
booking, and request new or renewed factory documents through the Production team
well before they lapse.
- Prepare and check dangerous goods declarations, packing instruction references, marks
and labels, and limited quantity determinations, for internal sign-off.
- Confirm that the nominated carrier or lane actually accepts the DG class in question
before booking.
- Escalate anything ambiguous. We would far rather answer a question than fix a rejected
shipment.
Formal DG certification is welcome but not essential. Demonstrable, hands-on exposure to
shipping batteries or flammable and environmentally hazardous liquids is.
3. Supplier coordination (pickup scope only)
- Act as the day-to-day pickup contact for our manufacturing partners in Asia, with contact
multiple times per day where needed.
- Confirm pickup-ready dates against the PO, chase slippage, and pull the date forward
before a factory volunteers that it has moved.
- Confirm the booked pickup back to the supplier and to the forwarder, and confirm that
each pickup has physically happened, with quantities and pallet or carton counts as
loaded.
- Escalate any pickup date movement immediately to Production and Operations. A
slipped pickup is a planning problem before it is a shipping problem.
- Track supplier pickup-date accuracy over time and feed the actuals into planning lead
time assumptions.
- Hand off cleanly. Anything a supplier raises that touches quality or specification goes to
the Production…
To Search, View & Apply for jobs on this site that accept applications from your location or country, tap here to make a Search: