Skip to content
×

Lead Planning Engineer

Listing for: Tolani Projects
Full Time position Listed on 2026-11-18
Job specializations:
Salary/Wage Range or Industry Benchmark: 16000 - 20000 USD Yearly USD 16000.00 20000.00 YEAR

Job Description & How to Apply Below

Job Description Lead Planning Engineer (Storage Tank EPC)

Company: Tolani Projects Private Limited
Location: Bhaskar Field, Central Processing Facility (CPF), Pandad-Tamsa Road, Village:
Pandad, Tal:
Khambhat, Dist:
Anand, Gujarat 388625.
Minimum experience: 5 years in the relevant field.
Minimum qualification: B.Tech in Mechanical Engineering.
Application / communication email:

Role Summary

Lead planning, scheduling and progress control for the crude oil storage tank EPC project. Integrate engineering, procurement, supply, fabrication, civil works, erection, inspection, testing and commissioning into a coordinated execution schedule; provide reliable progress visibility, early warnings and recovery planning to project management.

Project Context

The LOA covers six site-fabricated crude oil storage tanks, each 30 m internal diameter 10.8 m height, with associated civil, piping, electrical, instrumentation, cathodic protection and fire safety scope. The contractual completion schedule is 18 months from the LOA dated 29.10.2026, with reasonable efforts required to complete within 16 months while maintaining quality, safety and full scope compliance. The 16-month effort target must not be represented as replacing the 18-month contractual schedule.

Draft role responsibilities are adapted from the LOA and existing storage-tank JD. Detailed tender requirements, bulletins and post-bid clarifications were not supplied; scheduling assumptions, progress measurement rules and staffing arrangements require confirmation against the approved contract documents.

1.

Key Responsibilities
Integrated Planning & Scheduling
  • Develop and maintain an integrated baseline schedule and work breakdown covering engineering, procurement, supply, fabrication, civil works, erection, inspection, testing and commissioning.
  • Build tank-wise and discipline-wise activities, dependencies and milestones; integrate foundations/dyke works, tank appurtenances, piping/heating coils, electrical, instrumentation, cathodic protection, firefighting, calibration and hydrotest.
  • Maintain the contractual 18-month completion basis and a separate 16-month effort-target plan, subject to project approval and quality/safety constraints.
Progress Measurement & Reporting
  • Establish agreed progress measurement and reporting formats; collect and validate engineering, procurement and site progress with responsible teams.
  • Maintain planned-versus-actual trackers, look-ahead schedules, milestone reports and management/client dashboards.
  • Track work performed and accepted against the Annexure-A scope breakdown; provide validated progress evidence to support monthly progressive billing without assuming unapproved weightings.
Procurement, Resources & Site Interfaces
  • Track drawing approvals, vendor commitments, material deliveries and fabrication readiness against site requirements.
  • Coordinate manpower, equipment and material needs with execution teams; identify constraints affecting tank-wise and discipline-wise work fronts.
  • Integrate inspection hold points, hydrotest, calibration, pre-commissioning and commissioning readiness into the schedule with QA/QC and discipline teams.
Risk, Recovery & Change Control
  • Analyse critical activities, dependencies, delays and emerging risks; issue early warnings and propose practical recovery options.
  • Assess scope changes and execution deviations for schedule impact; maintain revision history and supporting records for project review.
  • Prepare recovery schedules with responsible teams, track agreed actions and report unresolved constraints to project management.
Completion & Closeout
  • Track mechanical completion, punch-list closure, documentation, commissioning and handover milestones.
  • Maintain final progress records and capture scheduling lessons learned for project closeout.
2. Technical Knowledge & Skills
  • Proficiency in MS Project or Primavera P6, and MS Excel for schedules, trackers, resource plans and progress reporting.
  • Understanding of EPC sequencing for API 650 storage tanks and associated civil, piping, electrical, instrumentation and fire safety interfaces.
  • Ability to develop work breakdown structures, identify critical paths, manage dependencies and maintain baseline/revised schedules.
  • Ability to validate progress quantities and documentary evidence, monitor procurement milestones and assess schedule impacts.
  • Working familiarity with drawing review, document control, testing/commissioning milestones and progress support for monthly billing.
3. Personal Attributes
  • Analytical…
To View & Apply for jobs on this site that accept applications from your location or country, tap the button below to make a Search.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
View / Apply for Jobs
Matching My Jurisdiction

Search for further Jobs Here:

SEARCH JOBS: 10+ Million Listings
(Try combinations for better Results! Or enter less keywords for broader Results)
Education Level
Experience Level (years)
Posted in last:
Salary