Strategic Materials Planner – Onsite, Day Shift, MRP
Listed on 2026-10-11
-
Manufacturing / Production
Manufacturing & Industrial Operations, Manufacturing Engineer
Teledyne Energy Systems, Inc. is seeking an experienced Planning/Scheduling professional to drive manufacturing planning in a fast-paced environment in Maryland.
You will coordinate with manufacturing, engineering, purchasing, and program management to ensure on-time delivery and optimal material flow. The role requires 5+ years of experience in planning/scheduling, strong ERP and MRP knowledge (Deltek Costpoint preferred), and excellent attention to detail.
The Strategic Materials Planner – Onsite, Day Shift, MRP position in the Management & Operations field is open for applications.
Are you ready to take on the Strategic Materials Planner – Onsite, Day Shift, MRP role at flir?
We would love to welcome a new Strategic Materials Planner – Onsite, Day Shift, MRP to our group in Cockeysville, MD, United States.
For the Strategic Materials Planner – Onsite, Day Shift, MRP position at flir, we are reviewing applications now.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).