Finishing Operator Assistant
Listed on 2026-10-13
-
Manufacturing / Production
Manufacturing & Industrial Operations, Machine Operator
Shaw Plant 4, 2225 S Hamilton Street Extension, Dalton, GA 30721 USA
Full time
R-157933
Job Title
Finishing Operator Assistant | Monday - Friday
Position OverviewThis position is Monday
- Friday 3pm-11pm.
Maintain correct and steady application of latex onto carpet, provide assistance to coater operator and froth operator.
ESSENTIAL DUTIES:I. Latex Application
A. Ensure carpet is feeding correctly into precoat direct applicator and Tillotson adhesive applicator, making sure to fix and report folded carpet to Coater Operator and Sew-on Operator.
B. Identify style to be run using Sew-In Tracker screen.
C. Reference spec sheet to identify correct application settings for the given style.
Application (precoat and adhesive)
Cupweight
Puddle height (precoat and adhesive)
Gap
D. Enter correct settings into Latex Control System.
E. Manually check gap with gages and adjust system if necessary.
F. Visually inspect latex application and troubleshoot using Latex Control System as necessary. Notify supervisors of issues.
G. Make sure end dams are set up correctly and latex is not getting on carpet selvage. Adjust end dams as necessary.
H. Perform all previous steps again for each style change.
I. Manually check cupweight and viscosity 4 times per shift and log in notebook. Also do this for any backing or weight check requested by supervisor.
J. Work with department management to improve Latex Control System and latex application process.
II. Maintain Precoat Area
A. Ensure proper operation of pre-coat pumps and blenders.
B. Make sure soap, water, latex tank levels are sufficiently high.
C. Clean out precoat filter baskets twice per week.
D. Report any issues to supervisor.
III. Perform Coater Operator Duties
A. The assistant operator must relieve the coater operator for breaks and absenteeism.
B. The assistant operator will be held responsible for all duties of the coater operator during this time.
IV. Perform Froth Operator Duties
A. The assistant operator must relieve the froth operator for breaks and slack time (when froth operator is changing out secondary backing).
B. The assistant operator will be held responsible for all duties of the froth operator during this time.
V. Conduct Secondary Application Weight Checks
A. Conduct check at direction of supervisor.
B. Place 3 two-part paper forms on secondary (after application) as secondary rises to the marriage roller.
C. Place 3 2-part paper forms on
Alley side
Center
Wall side
VI. Attendance Policy
A. Must adhere to the Corporate Attendance Policy
B. Must notify the previous shift supervisor of an imminent absence 1 to 2 hours before shift change
C. Must speak personally with supervisor detailing the reason for absence
VII. Work Schedule
A. Must work all scheduled work hours for your shift
B. Must be able to work weekends
C. Must be able to work 12-hour shifts
D. Must be able to work holidays as necessary
NON-ESSENTIAL DUTIES:I. Daily Clean-Up
A. Maintain a clean work area at all times. All areas should be picked up, swept up, or blown down at every opportunity.
B. All equipment should be properly stored when not in use.
C. Keep grease and oil off the floor.
II. Painting
A. Clean and paint all areas assigned during downtime.
PHYSICAL REQUIREMENTS:Must be able to:
- Withstand temperatures of 100 degrees
- Stand for long periods of time
Must be able to:
- Read and write legibly
- Operate Latex Control System
- Operate Coater Console
- Operate Shopflex / Sew-In Tracker
- Operate wings control
- Keep downtime report
- Communicate clearly via 2-way radio
- 3 weeks on-the-job training
- Utility knife
- Putty scraper
- Scale
- Viscometer
- Kronos badge
- Safety glasses
- Ear plugs
- Cut-resistant gloves
8 Hr non-rotating shift, Hrs fall to in punch day, Observed Calendar, shift starts PM
Shaw Industries is an equal opportunity employer as to all protected groups, including protected veterans and individuals with disabilities.
A history of success, a future of possibilityFounded in 1967, Shaw Industries' leadership has been built on a history of success. Over time, our products have expanded, the customers we serve have been broadened, and the technology we use has advanced, but our vision to create a better future remains the same. Exceeding our customers' expectations for quality, service and performance is at the heart of our business.
GlobalFlooring Provider
Shaw Industries Group Inc. supplies carpet, resilient, hardwood, tile and stone, synthetic turf,…
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).