Comprehensive Building Assessment and Handover Technical Audit
Comprehensive Building Condition Assessment and Handover Technical Audit
Services Posted On:
June 5, 2026
• Closing On:
June 8, 2026
JOB REFERENCE: JB004-26-02116
ObjectiveTo conduct a comprehensive Building Condition Audit (excluding fire alarm, firefighting, CBS, and voice evacuation systems) in line with the latest RERA requirements, with the primary objective to:
- Identify all building defects and deficiencies
- Establish a clear, measurable, and execution‑ready snag list
- Enable HOAM to proceed with rectification works strictly based on the audit findings
1. Technical Inspection & Assessment
Carry out a detailed inspection of all accessible common areas, systems, and components, including but not limited to:
- HVAC systems
- Plumbing and drainage systems
- Electrical systems
- Elevators and vertical transportation
- BMS and ELV systems
- Any other building‑related services and components
The consultant shall:
- Identify all defects, deficiencies, and performance issues
- Assess severity and urgency of each defect
- Highlight any condition impacting safety, durability, or functionality
- Fire Alarm, Fire Fighting, CBS, and Voice Evacuation Systems
All identified issues shall be:
- Clearly defined and individually listed
- Classified
- Supported with:
- Photographic evidence
- Description of defect
- Recommended rectification method
A. Detailed Snag Register (Core Deliverable)
- Each snag must include:
- Severity level
- Recommended rectification
Note:
Rectification works will be executed strictly based on the submitted snag register. Any omissions or unclear items shall not be considered at a later stage.
- Estimated cost per snag shall be submitted in a separate document and strictly excluded from the BCA report
- A consolidated summary shall be provided per system and for the overall building
C. Final Report
Submit a clear, structured, and RERA‑aligned technical report, including:
- Risk‑based prioritization
- Consolidated snag register
Upon completion of rectification works, the same consultant shall:
- Conduct re‑inspection of all identified snags
- Verify closure status
- Remarks on incomplete or ongoing works
- Be in line with latest RERA Law.
- Follow accepted technical audit and documentation practices.
- Be suitable for reserve fund justification (if required).
- Conduct full site inspection prior to submission.
- Ensure complete building coverage.
- No variation due to incomplete inspection.
- Coordinate with HOAM / FM team.
- Attend clarification meetings without additional cost.
- No variation will be accepted after submission.
- Scope shall be deemed fully understood.
- Timeline must be clearly defined.
- Submission shall be building‑specific.
Attend any clarification meetings or site walkthroughs after report submission, at no extra charge.
Binghatti West Boutique SuitesResidential
Binghatti West, Dubai Land Residence Complex, Dubai, United Arab Emirates
#J-18808-Ljbffr(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).