×
Register Here to Apply for Jobs or Post Jobs. X

Shop Floor Scheduler - 1st Shift - Repair Solutions

Job in El Cajon, San Diego County, California, 92021, USA
Listing for: GKN Aerospace
Full Time position
Listed on 2026-01-12
Job specializations:
  • Manufacturing / Production
    Production Manager, Manufacturing Engineer, Operations Engineer, Manufacturing Production
Salary/Wage Range or Industry Benchmark: 100000 - 125000 USD Yearly USD 100000.00 125000.00 YEAR
Job Description & How to Apply Below

Fantastic challenges. Amazing opportunities.

GKN Aerospace is reimagining air travel: going further, faster and greener! Fuelled by great people whose expertise and creativity sets the standards in our industry, we’re inspired by the opportunities to innovate and break boundaries. We’re proud to play a part in protecting the world’s democracies. And we’re committed to putting sustainability at the centre of everything we do, opening up and protecting our planet.

With over 16,000 employees across 33 manufacturing sites in 12 countries we serve over 90% of the world’s aircraft and engine manufacturers and achieved sales of £3.35  2023. There are no limits to where you can take your career.

Overview

Manages Shop Floor Scheduling activities in the Production Area. It includes the management of visual systems to communicate / monitor the sequence of production orders, Create and maintain sequenced production execution which through production change-over optimization will ensure maximum capacity utilization, to achieve master production schedule.

Responsibilities
  • Schedule production for specified products and production Lines understanding all the physical and manning constraints of these Lines
  • Ensure that Build Plan:
  • Is feasible and balanced against resource finite/demonstrated capacity
  • Includes all phase-in/out, localization and transfer plans as well as new programs development/prototyping
  • Is based on SIOP agreed working calendar and includes all planned downtime (Holiday, routine maintenance, Line closures, etc.)
  • Is in line with Supplier/Subcontractor available supply capacity
  • Can be supported with available WIP and FG packaging
  • Provide input for Material Requirement Planning / Vendor Scheduling process
  • Proactively communicate/escalate to the management team potential MPS issues/constraints to trigger preventive actions in order to mitigate supply failure risk
  • Monitor manufacturing output/performance daily against the plan, challenging and understanding whenever performance differs from the plan
  • Monitor Stock cover daily in order to avoid Stock outs as well as overstocks by adjusting the plan if possible or raising the issue with Planning Leader
  • Manage inventory levels of materials used for production by reviewing WIP levels and communicating with Purchasing team lead times of said production materials
  • Regularly analyze Inventory target level vs Customer demand in order to optimize/challenge current status and search for improvement opportunities
  • Provide communication/feedback to program/business line teams in case of any potential supply issues and also in order to improve Forecast accuracy
  • Liaise with PM team to support and coordinate all production planning related new programs launch/prototyping activities
  • Monitor WIP Inventory in light of any potential write off to support planning/commercial decision to be made to minimize impact
  • Ensure processes relevant KPI’s are monitored and PDCA approach applied with A3 in case of deviation to ensure targets are delivered in a sustainable way (e.g.: Schedule Adherence, Customer DSA, Inventory Turns)
  • Manage or take active part in SC and Plant performance related continuous improvement projects/activities
  • Using production change-over matrix sequence weekly MPS into a day/shift detailed shop floor execution plan covering period between 1 to 2 weeks
  • Maximize shared manufacturing resource output/utilization while ensuring full coherence with MPS product mix, volumes and required availability dates
  • Ensure that sequenced plan:
  • Is feasible and balanced against resource finite/demonstrated capacity
  • Includes all planned downtime (Holiday, routine maintenance, Line closures, etc.)
  • Is supportable with available WIP and FG packaging
  • Plan, develop, and prioritizes schedules for production work centers to maximize performance and minimize production delay
  • Worked with PMO to understand production requirements and facilitated execution of those requirements to the production floor. Incorporated and maintained planning tools to assist with production execution including line-of-balance, work center throughput, and work center by work center priority lists to guarantee focus on delivery of…
To View & Apply for jobs on this site that accept applications from your location or country, tap the button below to make a Search.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
 
 
 
Search for further Jobs Here:
(Try combinations for better Results! Or enter less keywords for broader Results)
Location
Increase/decrease your Search Radius (miles)

Job Posting Language
Employment Category
Education (minimum level)
Filters
Education Level
Experience Level (years)
Posted in last:
Salary