Strategic Gas Turbine Repair Scheduler
Listed on 2026-10-07
-
Energy/Power Generation
Power Plant / Engineering
PROENERGY is seeking a Production Scheduler in Houston, TX to translate the master plan into a feasible sequence across gas turbine manufacturing operations. The role sits between production planners and the planning manager, ensuring a realistic, stable schedule that aligns with TAT targets and capacity constraints.
Reporting to the VP Production Planning & CI, this position requires strong Excel skills, ERP experience, and a proactive approach to replanning under pressure.
Are you ready to take on the Strategic Gas Turbine Repair Scheduler role at PROENERGY?
Join PROENERGY and contribute to our ongoing work.
Take a moment to read everything above and see whether this role is right for you.
This posting is for the Strategic Gas Turbine Repair Scheduler role at PROENERGY, based in Houston, TX, United States.
We are looking to fill the Strategic Gas Turbine Repair Scheduler position at PROENERGY in Houston, TX, United States.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).