IRATA Level 3 Offshore Wind Technician | Long-Term Rotations
Listed on 2026-10-10
-
Energy/Power Generation
Wind Turbine / Technician, Renewable Energy, Wind Energy
Apave UK Ltd. is recruiting IRATA Level 3 technicians for offshore wind projects across the UK. The role requires GWO qualifications (5 basic modules), GWO Enhanced First Aid, GWO Slinger/Signaller, and OEUK Medical & Chester Step.
Start dates begin mid-late April with long-term project opportunities and 14-day rotations. Accommodation is provided and LTD Co. contractors are offered placement on multiple offshore sites.
For the IRATA Level 3 Offshore Wind Technician | Long-Term Rotations position at Apave UK Ltd, we are reviewing applications now.
We aim to respond to suitable candidates as soon as possible.
Full responsibilities and requirements are described in the listing above.
Learn more about the IRATA Level 3 Offshore Wind Technician | Long-Term Rotations role in the description above.
We appreciate your interest in this position.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).