Workface Planner; Piping/Mechanical
Listed on 2025-12-31
-
Engineering
Mechanical Engineer, Process Engineer
- Relocation Authorized:
National - Accompanied - Telework Type:
Full-Time Office/Project - Work Location:
Lake Charles, LA
Since 1898, we have helped customers complete more than 25,000 projects in 160 countries on all seven continents that have created jobs, grown economies, improved the resiliency of the world’s infrastructure, increased access to energy, resources, and vital services, and made the world a safer, cleaner place.
Differentiated by the quality of our people and our relentless drive to deliver the most successful outcomes, we align our capabilities to our customers’ objectives to create a lasting positive impact. We serve the Infrastructure;
Nuclear, Security & Environmental;
Energy;
Mining & Metals, and the Manufacturing and Technology markets. Our services span from initial planning and investment, through start-up and operations. Core to Bechtel is our Vision, Values and Commitments. They are what we believe, what customers can expect, and how we deliver. Learn more about our extraordinary teams building inspiring projects in our Impact Report.
Louisiana LNG is located approximately 11 miles southwest of Lake Charles, Louisiana. The project includes a mid-scale, mixed‑refrigerant Liquefied Natural Gas (LNG) production and export facility on the west side of the Calcasieu River. There are five identical process plants. Each process plant consists of one gas pre‑treatment unit, one condensate stabilization unit, and four chart heavy hydrocarbon (HHC) removal and liquefaction groups.
The facility will include associated utilities, refrigerant storage, three 235,000m³ full‑containment LNG storage tanks, and three marine berths.
The Workface Planner Piping/Mechanical will be responsible to prepare Installation Work Packages (IWPs), Material Take‑offs (MTO) & Test Work Packages (TWPs) for specific disciplines and will also support office construction activities, such constructability reviews, ensuring safety in design, providing construction’s input to engineering and procurement teams that improves Total Installed Cost (TIC) on the projects.
Major Responsibilities:- The Piping/Mechanical Workface Planner is responsible for developing Installation work packages (IWPs), Test Work Packages (TWPs) for Piping installations in addition to being accountable for developing the detailed IWP release plan (90‑Day schedule) with the responsible Superintendent, or responsible Field Engineer.
- Review general installation priorities and check to assure the work accomplished meets the project requirements.
- Reviews work scope, checking sequences, access, resources, equipment needs, pre‑work, materials, and support services.
- Prepares the scope of the IWP/TWP in coordination with piping field engineer to gain approval for the IWP/TWP.
- Perform random checking of IWP/TWP assembled by the other Workface planner.
- Understand work packaging philosophy, scope of installation, Work Breakdown Structure, and scoping of installation work packages.
- Monitor project schedule and ensure performance and timely delivery of IWP/TWP; coordinate with Project Controls team, planners, other stakeholder of the project and ensure piping IWPs are issued as per the project priorities.
- Monitor quality of IWP/TWP ensuring scoping and preparation of IWP/TWP is done right the first time. Attend progress meetings, maintain effective interface with site management team, client’s organization ensuring IWP/TWP, and advance work packaging efforts are effectively delivered on the project.
- Develops detailed IWPs/TWPs as per the project guidelines and procedures, which includes, compiling mechanical & piping installation drawings, isometrics, installation details, model snapshots, vendor drawings, inspection test records, flange connection datasheets or any other documents or Engineering deliverables associated with the IWPs/TWPs.
- Supports development of various other construction engineering deliverables like material take‑off of Piping bulk material and vendor supplied piping components and bulks; upload material take‑off quantities and other attributes of Work Packages into the TEAMWorks database or project specific database.
- Preparation of…
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).