SAP Project System; PS) Functional Consultant​/IMS Integration

Job in Lexington, Fayette County, Kentucky, 40598, USA
Listing for: The Amatriot Group
Full Time position
Listed on 2026-10-12
Job specializations:
  • IT/Tech
    Systems Analyst, SAP Consultant, Business Systems & Technology Analysis
Salary/Wage Range or Industry Benchmark: 75 - 150 USD Hourly USD 75.00 150.00 HOUR
Job Description & How to Apply Below
Position: SAP Project System (PS) Functional Consultant / IMS Integration

Location: Lexington, KY (100% onsite, travel paid for)

Job Type: Contract (Sept-Nov 2026)

Target Salary Range*: $75-150/hr

  • This represents the potential salary range for this position depending on education level, years of experience and/or certifications in addition to other position specific requirements which may impact salary
Position Overview

The SAP Project System Functional Consultant leads the Project System deep dive and Blueprint workshop for the Lockheed Martin SOF GLSS engagement within SAP S/4

HANA 2023 on-premise. The engagement objective is to improve the Project System configuration so that Integrated Master Schedules maintained in the program scheduling tool can be uploaded into and reconciled against SAP project structures, enabling Task Order status reporting and project data collection from the system of record rather than from manually assembled spreadsheets.

This consultant owns the functional design of the Task Order project and WBS architecture, the network and activity structure that carries the Integrated Master Schedule thread, the schedule interface and reconciliation rules, and the Project System Progress Analysis configuration that turns production and procurement execution into measured project progress. The consultant facilitates the Project System deep dive and Blueprint sessions with program management, project controls, scheduling, and finance personnel, and authors the resulting Functional Description Documents.

Key Responsibilities Project System Architecture and Design
  • Design the Task Order project and WBS architecture, including project definition, coding mask, WBS templates, and standard project structures that mirror the Task Order, CLIN, and SLIN funding hierarchy so each new Task Order inherits a consistent cost-collecting structure.
  • Design the network, activity, and milestone structure that carries the Integrated Master Schedule thread in SAP.
  • Define the level at which Integrated Master Schedule activities map to Project System network activities and WBS elements.
  • Configure Project System scheduling, including network scheduling parameters, scheduling types, relationships, constraints, reduction strategies, and factory calendar assignment, so imported Integrated Master Schedule logic schedules correctly in SAP.
Schedule Interface and Reconciliation
  • Configure the schedule interface that loads and refreshes Integrated Master Schedules into Project System.
  • Evaluate Open PS, Microsoft Project integration, project connector, and file-based upload options.
  • Define field mapping, key strategy, and re-import rules that keep SAP and the external Integrated Master Schedule synchronized without duplicate maintenance.
  • Define reconciliation rules governing which system owns dates, network logic, and status.
  • Design exception reporting that surfaces divergence between the uploaded Integrated Master Schedule and SAP-scheduled dates.
Progress Analysis and Project Data Collection
  • Configure Project System Progress Analysis, including progress versions, measurement methods such as milestone technique, degree of processing, and quantity or cost proportionality, statistical key figures, and progress determination for orders assigned to WBS elements.
  • Establish assignment of production orders, purchase requisitions, and purchase orders to WBS elements.
  • Configure order type settings that make production order progress measurable from Project System.
  • Design the project data collection architecture covering actual cost capture, labor confirmation, material consumption against project stock, commitment management, and period-end automation of overhead calculation, results analysis, and settlement.
Budget, Cost Control, and Reporting
  • Configure planning and budget profiles, budget availability control tolerances, and settlement rules so funds discipline and cost flow are enforced at the correct WBS level.
  • Define the Task Order reporting set, including project structure, cost and schedule reporting, milestone trend analysis, and Fiori and CDS-based analytical content that replaces manually assembled status reporting.
Documentation, Workshops, and Client Enablement
  • Author Functional Description Documents, configuration workbooks, functional specifications, and UAT test scripts.
  • Maintain the decision and open item log for each assigned workstream.
  • Facilitate onsite Project System deep dive and Blueprint sessions with program management, project controls, scheduling, production planning, and finance personnel.
  • Enable client staff to…
To View & Apply for jobs on this site that accept applications from your location or country, tap the button below to make a Search.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
 
 
 
Search for further Jobs Here:
(Try combinations for better Results! Or enter less keywords for broader Results)
Location
Increase/decrease your Search Radius (miles)
0
200
Filters
Education Level
Experience Level (years)
Posted in last:
Salary