Electrical Foreman
Listed on 2026-11-06
-
Trades / Skilled Labor
Construction Manager/ Foreman, Installation Technician
Overview About M.C. Dean
M.C. Dean is Building Intelligence. We design, build, operate, and maintain cyber-physical solutions for the nation’s most mission-critical facilities, secure environments, complex infrastructure, and global enterprises. With over 9,000 employees, our capabilities span electrical, electronic security, telecommunications, life safety, automation and controls, audiovisual, and IT systems. Headquarters in Tysons, Virginia, M.C. Dean delivers resilient, secure, and innovative power and technology solutions through engineering expertise and smart systems integration.
WhyJoin Us?
Our people are passionate about engineering innovation that improves lives and drives impactful change. Guided by our core values—agility, expertise, and trust—we foster a collaborative and forward-thinking work environment. At M.C. Dean, we are committed to building the next generation of technical leaders in electrical, engineering, and cybersecurity industries.
ResponsibilitiesThe Electrical Foreman 1 is responsible for supervising and coordinating the work of a crew of electricians, apprentices and laborers on a job site as well as ensuring that all work installed is completed on time, on budget and according to all applicable plans, specifications, codes and industry standards.
ResponsibilitiesProductivity Planning for assigned scope of work
Material Phasing – Organize Material by specific areas/floors. (keep track of materials inventories).
Tools & Equipment - Identify all tools and equipment required to support each crew (Gang box Assignments, tool inspection and keep track of tools by signing sheet in-out).
Information Packages – Each crew activity must have information packages (contract drawings, shop drawings, panel schedules, cut sheets, etc…).
Keep control of breaks (loss time of personal breaks smoking time, conversation time).
Daily hour/unit reports for their crews – Submit hours/units daily for each employee assigned to Foreman on established from (Standard Time Sheet).
Quality control inspections of work completed – Must follow established QC plan & check lists.
Responsible for installing the work in a professional manner and high-quality standard.
Maintaining accurate as built drawings – As-built drawings are to be updated and logged onto master record contract drawings a minimum of once a week.
Inventory of all tools & equipment at the day’s end for assigned tools & equipment. (Everything must be accountable & secure) inventory/inspection sheets to be turned in every Monday.
Lost/Stolen/Damage tool report.
AHA’s – All AHA’s related to Foreman’s scope of work must be reviewed, signed by each crew member and stored at their gang box in the field.
Support Equipment Inspection – Foreman must submit daily equipment inspection sheets for all equipment assigned to Foreman once a week.
Accident/Incident Reporting & Investigation – Must follow the established procedures for responding and reporting accident and incidents. All reports must be submitted within 24 hours of accident/incident.
Clean Up – Foreman and Crew leader are responsible for all clean up related to their scope of work. All work areas are to be left in a broom swept condition at the end of the day.
Managing mid-sized to large projects of 15 or more persons.
Conferring with senior management, supervisory personnel, owners, contractors and design professionals to discuss and resolve matters such as work procedures, complaints and construction problems.
Scheduling the project in logical steps in order to budget enough time required to meet deadlines.
Determining labor requirements and dispatching workers to construction sites
Planning, organizing and directing activities concerned with the construction and maintenance of…
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).