Project Scheduler III
-
Construction
Job Description & How to Apply Below
At Blue Origin, we envision millions of people living and working in space for the benefit of Earth. We're working to develop reusable, safe, and low-cost space vehicles and systems within a culture of safety, collaboration, and inclusion. Join our team of problem solvers as we add new chapters to the history of spaceflight!
This role is part of Blue Origin corporate functions, providing centralized support across Blue Origin business unit teams, functions, and locations.
As part of a small, passionate, and accomplished team of experts, you will push the boundaries of what's possible in project management, as a visionary and hands‑on leader, supporting Blue Origin's Central Florida Facility. You will contribute substantively to the team's impact on all aspects of building our infrastructure and world class facilities.
Responsibilities Design Phase- Plan backward from required completion and operational need dates, establishing enabling milestones (dry-in, permanent power, environmental control, equipment readiness) at kickoff
- Build and maintain a Level 2 Executive Schedule that communicates the project strategy, key client decisions, and turnover commitments in minutes
- Develop a Level 3 Integrated Project Schedule linking design, procurement, construction, and commissioning logic, with every critical activity having a clear owner and tie to project need
- Create Design Work Packages tied to downstream procurement and construction need dates, replacing generic percentage-based releases
- Maintain the Milestone Register, ensuring every milestone has an owner and documented slip impact
- Maintain the Schedule Assumptions Log, validating assumptions or converting them to risks before they drive the schedule
- Lead critical and near-critical path reviews of logic (not just software output), identifying ways to protect or shorten the path
- Plan and control early release strategy for long‑lead and enabling packages (civil/site, foundations, structural steel, major equipment, utilities, permits)
- Develop, submit, and maintain the contract-compliant baseline CPM schedule, integrating trade and vendor schedules
- Issue monthly schedule updates with narrative covering critical path, float trends, forecast completion, and top risks
- Produce 3‑week look‑aheads and lead weekly constraint reviews with the field
- Track procurement and submittals against on‑site need dates, escalating long‑lead risks early
- Prepare fragnets and Time Impact Analyses for changes, RFIs, and delays; support change order and claims documentation
- Develop recovery schedules and mitigation options when the critical path slips
- Sequence commissioning, testing, training, punch list, and turnover activities through occupancy
- Run recurring schedule quality/health checks and correct issues before issuing updates
- Reconcile schedule progress with field‑verified quantities and support earned value/S‑curve reporting
- Act as a leadership‑facing project controls partner - challenging logic, assumptions, and release timing, not just operating software
- Interface regularly with the Project Director/PM, design leads, preconstruction/procurement, superintendents and trade partners, owner/client, and commissioning teams
- Use AI‑assisted review to support (not replace) scheduling judgment - e.g., CPM logic checks, milestone validation, float analysis, and risk identification
- Bachelor's degree in Construction Management, Engineering, Architecture, or related field - or equivalent experience
- 7+ years of CPM scheduling experience on commercial, industrial, or mission‑critical projects, spanning both design and construction phases
- Advanced proficiency in Oracle Primavera P6; working knowledge of Microsoft Project
- Experience developing…
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
View / Apply for Jobs
Matching My Jurisdiction