On-Site Chemical Process Engineer - Carbon Capture, Alkaline Electrolysis & Methanation Pilot at CCN
-
Engineering
Job Description & How to Apply Below
Location: CCNY, Manhattan | Engagement: Contract-to-Hire | Company: Standard Carbon
Standard Carbon is seeking a hands-on Chemical Process Engineer / Commissioning Engineer to own our installed carbon capture, hydrogen production, and Sabatier methanation system at CCNY.
This is not a remote design role. We need an engineer who can operate real process equipment, troubleshoot pumps, heat exchangers and controls, review P&IDs, manage trades, coordinate PLC changes, and validate the plant against DWSIM and Aspen HYSYS.
Goal: convert the CCNY pilot into a reliable automated demonstration plant that an authorized user can start with essentially one command through the Unitronics HMI/web/mobile interface.
Process and Current ConditionThe CCNY deployment demonstrates Standard Carbon's the Carbon Bridge process:
Combustion exhaust → MEA CO₂ capture → CO₂ conditioning → hydrogen production → Sabatier methanation → water removal → methane production/use
Approximate design basis: 3.9 kg/h CO₂ utilization, 0.7 kg/h H₂, 1.5 kg/h methane, ~35 kW electrolysis, 115°C
The desorber inventory appears large relative to the MEA flow receiving reactor heat. Measure actual flows, temperatures, inventory, exchanger performance and losses and close the real thermal balance.
Initial Semi-Batch StrategyBefore major expansion, establish and automate a semi-batch mode:
CO₂ ratio.
Calculate MEA regeneration heat demand, reactor heat generation, exchanger effectiveness, circulation rates, desorber thermal inventory, heat losses, required H₂/methanation capacity, cooling requirements, and startup versus steady-state loads.
Implement the appropriate combination of added hydrogen/methanation capacity, improved heat recovery, heat exchangers, active cooling, instrumentation, automated valves, and supplemental boiler/electric heat if required. Methanation heat should satisfy as much of the desorber load as practical.
System 200 – Standard Carbon Alkaline ElectrolyzerReplace the temporary PEM units with Standard Carbon's in-house alkaline electrolyzer and commission its balance of plant: ELE-201 stack, DC power supply, ~30% KOH electrolyte loop, C-201 O₂ separator, C-202 H₂ separator, P-201, HX-211, EH-201, instrumentation, automated XV valves, O₂ vent/H₂ routing, C-203/C-204 cooling/separation, P-202, HX-201, CH-201, condensate handling, H₂ drying, EH-202, PR-201, H₂ analysis and PLC I/O.
Manage the mechanical, electrical, controls and commissioning transition from PEM to alkaline electrolysis.
System 300 – MethanationSystem 300 includes REA-1/REA-2 parallel primary reactors, REA-3 polishing reactor, EH-301/EH-302/EH-303 heaters, temperature/pressure instrumentation, H₂/CO₂ feed, FIT-301/FCV-301 CO₂ control, ~3.9:1 H₂:
CO₂ target, reactor-to-MEA heat recovery, condensate removal, gas drying, AIT-301 methane measurement, AIT-302 residual CO₂ measurement, and methane storage/vent/supply routing.
Optimize conversion, cooling, condensate removal, flow distribution, heat recovery, gas composition, controls and reactor capacity.
Controls and Automated DemonstrationThe final system must provide a single-command automated demonstration. An authorized user should press START DEMONSTRATION, after which the Unitronics PLC verifies permissives and automatically sequences…
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
View / Apply for Jobs
Matching My Jurisdiction