Engineering Technician IV - Infrastructure
Listed on 2025-12-19
-
Trades / Skilled Labor
Maintenance Technician / Mechanic, Installation Technician
IND
US is a 100% employee-owned, customer-focused government services provider with expertise in Engineering, Information Technology, Cybersecurity, Program/Financial Management, Logistics, and Data Analytics. At IND
US
, we believe in the value of the IND
US team. Together we deliver exceptional customer service, foster a growth and support-centered work environment, and focus on how we can give back to the communities that we serve. Empowering our employees starts on day one and creates an environment full of innovation and promise. By offering mentorship and robust Training and Development opportunities, IND
US continues its pursuit to be the Employer of Choice.
Reporting to the Program Manager, the Engineering Technician (Infrastructure) provides Operations and Maintenance support services for all of NUWCDIVNPT Code 25's facilities and infrastructure support equipment.
This is acontingentposition expected to be located inNewport, RI.
- Provide a monthly schedule for the Code 25 Infrastructure Support Team to ensure a minimum of one person at each of the three C25 laboratory locations on a continuous basis from 0700 – 1700 Monday through Friday, excluding federal holidays and official base closures.
- Escort visitors to Code 25 secure and non-secure spaces.
- Continuously monitor the status of all Code 25 Facilities and Code 25 Facilities support infrastructure equipment including heating, ventilation and cooling (HVAC) systems, Electronic Auxiliary Fresh Water (EAFW), 400 Hz power. Log all discrepancies and status changes on the Code 25 Facilities web page pass down log on a daily basis.
- Submit Trouble Calls to cognizant NUWCDIVNPT Code 25 lab manager and Code 10 facilities personnel when facility deficiencies are identified.
- Install Code 25 Laboratory Tactical Shipsets, Commercial Equivalent Equipment, Racks, and IT related equipment in preparation for Code 25 Facilities events using applicable Incidental Government Furnished Property (IGFP) (cables, fibers, connectors, slides) made available in the facilities.
- When a work request and hardware is received, design and fabricate infrastructure modifications, and install Code 25 Laboratory IT equipment upgrades to support Government infrastructure requirements using applicable IGFP (cables, fibers, connectors, hoses, equipment support components). Document all infrastructure modifications and installations via the Code 25 work request tool.
- When using any Code 25 Facilities equipment subject to Navy Occupational Safety and Health (NAVOSH) regulations in accordance with the Government SOP for the equipment, record the usage in the Government provided equipment usage log.
- Perform incoming and outgoing inspections per the QA checklist on all deliveries to the Code 25 Laboratories and complete the checklist with results of inspection.
- Troubleshoot malfunctioning equipment (including cables, fibers, and assemblies) in the lab and lab facility infrastructure to determine the root cause of the malfunction or deficiency and deliver repair recommendation for Government approval. In the recommendation the contractor shall include anticipated costs and schedule to complete the repair. Upon Government approval of recommended repair, the contractor shall repair the malfunction.
- Fabricate, modify, and install stands, wall mounts, and Unistrut assemblies.
- Install shipboard equipment on mounting foundations, brackets, components and assemblies.
- Repair previously installed lab equipment as needed
- Fabricate, modify, install, and repair Electronic Auxiliary Fresh Water (EAFW)/Water Cooled equipment and assemblies which are not under the purview of NAVFAC or NUWC Facilities (Code 10) but are for the installation, upgrade, maintenance, and operation of Code 25 Laboratories using applicable IGFP (connectors, hoses, electronic components). The EAFW equipment is comprised of approximately thirty (30) manifolds. Document closeout of installations and repairs via the C25 Facilities webpage.
- Remove, flush and purge C25 Lab EAFW/Water Cooled equipment in accordance with the appropriate equipment manuals in support of Code 25 Laboratories Facilities…
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).