Senior Superintendent; San Antonio, TX - Austin Commercial
Listed on 2025-12-08
-
Construction
Operations Manager -
Management
Operations Manager, Program / Project Manager, Contracts Manager, EHS / HSE Manager
Description
Do you want to make a difference? Do you want to grow your career at one of the industry’s leading construction firms? Put your expertise and project engineering skills to work at Austin Commercial. Austin Commercial is currently seeking a Senior Superintendent for our San Antonio, TX Division. We set the standard for commercial construction and we’re looking for talented construction professionals to join us.
Austin is 100% employee-owned, so every one of our employee-owners has a vested interest in our success. As a result, we consistently meet and exceed our customers’ expectations with our commitment to safety, service, and integrity. Join us today. We Own It!
The senior superintendent (referred to as superintendent hereafter) and senior project manager (referred to as PM hereafter) positions are considered of equal authority on a project, work in tandem and parallel, have overlapping responsibilities, are intended to complement each other in various operational responsibilities on the project, and share bottom-line accountability. The purpose of this job is to provide overall direction and control of the day-to-day field construction activities on assigned job site, often including a major project with complex conditions of size, schedule or phases.
ResponsibilitiesLeads and oversees the day-to-day field construction activities on assigned jobsite
Organizes and manages a large project staff where the duties of project managers and superintendents must be divided between multiple employee-owners
In charge of the overall safety at a jobsite, including the implementation of the safety plans and procedures
Reviews record documents, submittals, shop drawings, and schedule to determine the nature and scope of the project, the materials to be utilized, manpower requirements (by craft) for each construction phase, equipment needs, etc.
Along with the project manager, plans the physical layout of the jobsite to use effectively all available space; initiates startup activities, which include site security preparations, placement of office trailers, utility hookups, etc.
Designates areas for cranes and hoists, building materials storage, parking, etc.
Directs field engineers in the initial survey and layout of the jobsite; ensures that all dimensional control lines and elevations are correct and verified by certified third party site surveyors before foundation work begins
Plans the daily and weekly activities for each craft, including detailed schedule forecasts, within the scope of the overall construction schedule; provides detailed technical instructions for each foreman to ensure a clear understanding of the work, methods, manpower resources, and expected completion date; works with the project office staff to resolve any ambiguities in plans and drawings before construction begins
Along with the project manager, the superintendent establishes procedures for the ordering of self-performed building materials, supplies, and small tools from approved suppliers
Inspect all field construction work in progress, including work that is subcontracted, and ensures that uniformly high-quality workmanship is maintained during each construction segment; supervises or appoints staff as appropriate to supervise all activities performed on the jobsite regardless of the day or time of the performance of the work, pointing out deficiencies promptly with responsible parties and following up to ensure that deficiencies are corrected
Provides technical guidance and assistance in resolving day-to-day construction problems; investigates alternative work methods and materials to improve efficiency and work quality; works closely with architects, engineers, and consulting firms to resolve problems
Assists the project manager in evaluating schedule and cost impacts
Assists the project manager in the development of the manpower projection chart; monitors weekly labor costs for accuracy and conformance with established budget and takes corrective action to improve productivity when labor costs exceed expected budget; investigates reasons for delays in the construction schedule and adjusts leadership assignments, crew…
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).