×
Register Here to Apply for Jobs or Post Jobs. X

Materials Coordinator

Job in Southampton, Hampshire County, SO15, England, UK
Listing for: NES Fircroft
Full Time position
Listed on 2026-01-22
Job specializations:
  • Manufacturing / Production
    Materials Engineer, Quality Engineering, Operations Engineer
  • Engineering
    Materials Engineer, Quality Engineering, Operations Engineer
Job Description & How to Apply Below

Vacancy:
Materials Coordinator

Location:

Fawley, Southampton

Duration: 1 year contract

Responsibility:
Identification of Materials

It is the responsibility of the Materials Coordinator to identify early, in line with GRS 6F milestones, all required materials thus enabling early procurement, and in conjunction with the Materials Co‑ordinator identify long‑lead delivery items. This is best achieved by systematically assessing each line of the Turnaround work‑list. The listing should then be cross‑checked with previous Turnaround material records. The aim is to have all Turnaround materials delivered to site no later than T‑3 months from the planned start date.

Procedure

for Purchasing Exchanger Gaskets for Turnaround’s

Objective to procure exchanger gaskets to correct up‑to‑date sizes and material specifications. (Past losses have been experienced).

  • Obtain Exchanger gasket drawings (normally by Field engineer) from the following suggested sources :

    -
    • Historical job‑packs
    • Engineering records
    • Exchanger Group records
    • (gasket manufacturer)
    • Owner’s Engineer
  • Obtain agreement signature from Owner’s Engineer. “Sign off” on the gasket detail sketch to confirm that gasket specifications are correct.
  • TAG Materials co‑ordinator must ensure that gaskets are only ordered against approved drawings/sketches that are signed off each time specifically for the T/A Event.
  • Copy records of exchanger gasket sketches to be kept by Materials Co‑ordinator and a duplicate scanned copy to be filed in the Job‑pack.
  • NPQC & Expediting

    At an early stage of the Event or T/A worklist being issued, the Block Lead should lead the team in identifying what items should undergo Client inspection. Expediting is via EMEEL is to be arranged by the Materials Coordinator via Job Agreement Forms detailed in the “T&M Manual Section 12.1 – QAQC Readiness for Events & Turnarounds”.

  • Material Criticality Clarification Request (MCCR)
  • In the event of any special material requirements requiring purchasing without full specifications or IFC engineered drawings, e.g. Long‑Lead Special Manufacture / fabrication item’s with T/A critical dimensions, a Material Criticality Clarification Request should be completed by the Materials Coordinator and signed off by the equipment owners engineer before any budget quotations are requested. (Attachment
    3)

    Notes
    • Where applicable all copies of drawings, specifications & global practices are to be included with any critical T/A material requirement.
    • All technical information should be sent to the supplier to enable them to clearly identify our requirements.
    • TAG / Inspection department / Owners Engineer to state if inspection is required at the suppliers works.
    Obtaining Approval for Purchase

    It is the responsibility of the Materials Coordinator to request budget authority through Stripes for purchase of required materials. Once authorised, he will raise a "material purchase request", within the SAP system ensuring that it is approved with the relevant DOAG approval, and forward to the Materials Co‑ordinator for action. (Attachment
    2). The Materials Co‑ordinator will arrange, with UKAPM, purchase in line with "UKAPM Procurement Procedures", or reserve material stock items, using the SAP system. If the material is a stock item a "material purchase request" is not required.

    On delivery of materials the Materials Co‑ordinator will ensure that any P.M.I. requirements are met and that the material is stored within the Turnaround designated lay‑down area within the warehouse. He will also ensure that the material is identification tagged prior to issue.

    Work scope materials will be handed to the mechanical contractor who will confirm receipt. At the end of the Turnaround surplus materials are handed back to the Turnaround group. Both TAG & the Mechanical Contractor must have facilities for secure storage as detailed below in 9.3.4.

    Materials Security & Control Process

    As part of the preparations for an Event or Turnaround it is required that consideration be given to setting up secure storage & lay‑down areas. This is required as part of the Tier 3 Best Practice. The aim of this is to protect the company’s assets & prevent loss of inventory be it…

    Note that applications are not being accepted from your jurisdiction for this job currently via this jobsite. Candidate preferences are the decision of the Employer or Recruiting Agent, and are controlled by them alone.
    To Search, View & Apply for jobs on this site that accept applications from your location or country, tap here to make a Search:
     
     
     
    Search for further Jobs Here:
    (Try combinations for better Results! Or enter less keywords for broader Results)
    Location
    Increase/decrease your Search Radius (miles)

    Job Posting Language
    Employment Category
    Education (minimum level)
    Filters
    Education Level
    Experience Level (years)
    Posted in last:
    Salary