×
Register Here to Apply for Jobs or Post Jobs. X

Wind Technician – Training Program; Entry-Level

Job in Claude, Armstrong County, Texas, 79019, USA
Listing for: Sky Climber Renewables
Apprenticeship/Internship position
Listed on 2026-10-10
Job specializations:
  • Energy/Power Generation
    Renewable Energy, Wind Turbine / Technician, Wind Energy
Salary/Wage Range or Industry Benchmark: 42000 - 64000 USD Yearly USD 42000.00 64000.00 YEAR
Job Description & How to Apply Below
Position: Wind Technician – TOP Training Program (Entry-Level)
Location: Claude

Sky Climber Renewables is seeking a Wind Technician Level 1 for its TOP development program. The role trains you with GWO accredited safety and technical courses and places you on a service team at a wind site near home, performing maintenance on turbine generators.

You will report to the Program Manager and Site Manager, with responsibilities including basic installations, inspections, and documentation, while adhering to health, safety, and environmental procedures.

This opening is for the Wind Technician – TOP Training Program (Entry-Level) role at Sky Climber Renewables.

The position is based in Claude, TX, United States.

This opportunity is part of our work in Engineering, Other.

The advertised compensation is 42.000 - 64.000.

We aim to respond to suitable candidates as soon as possible.

Full responsibilities and requirements are described in the listing above.

To View & Apply for jobs on this site that accept applications from your location or country, tap the button below to make a Search.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
 
 
 
Search for further Jobs Here:
(Try combinations for better Results! Or enter less keywords for broader Results)
Location
Increase/decrease your Search Radius (miles)
0
200
Filters
Education Level
Experience Level (years)
Posted in last:
Salary