×
Register Here to Apply for Jobs or Post Jobs. X

Senior​/Lead Project Planner

Job in Vancouver, BC, Canada
Listing for: WorleyParsons
Full Time position
Listed on 2026-06-17
Job specializations:
  • Engineering
    Engineering Design & Technologists, Systems Engineer, Civil Engineering, Operations Engineer
Salary/Wage Range or Industry Benchmark: 80000 - 100000 CAD Yearly CAD 80000.00 100000.00 YEAR
Job Description & How to Apply Below

Senior/Lead Project Planner (VAN
00JX
)

Company:
Worley

Primary

Location:

Vancouver, British Columbia

Work Conditions
  • Home Office (Monday to Thursday in office, Friday remote) – 40 hours per week.
  • Periodic site travel may be requested.
  • Ability to travel and work from various remote locations during the project life‑cycle.
Position Description

This position is responsible for establishing overall, integrated EPCM (Engineering, Procurement, and Construction Management) P6 schedules, including schedules for bids/proposals. The planner must fully understand all aspects of the EPCM life cycle as it relates to schedules, integrate multiple contributors, and properly resource load across all project phases. Additionally, the planner should utilize all available tools (deliverable lists, engineering and procurement flow charts, 3D models, work packages, drawings, estimating information) to achieve these goals.

In addition to building these schedules, the planner must provide ongoing updates, maintenance, and analysis. Identifying issues early and offering solutions without intervention is essential. Detailed time analysis will be provided to the integrated project team, informing them of potential delays or opportunities promptly.

The planner is expected to excel in a fast‑paced environment, be flexible, and may be accountable for multiple projects simultaneously.

Responsibilities
  • Create and maintain master schedules (Level I–V) based on specific project requirements and inputs from multiple departments.
  • Develop and maintain resource‑loaded project master schedules as per the project WBS.
  • Identify all interface points between schedule groups and create appropriate MIS (Milestone Interface Schedules).
  • Create and manage EPS coding dictionaries for cross‑schedule analysis.
  • Ensure key activities and milestone dates from the schedule basis are captured in the master schedule.
  • Develop the Basis of Schedule document.
  • Coordinate with stakeholders, including internal management, engineering and procurement leads, construction leads, turnover and commissioning groups, and client representatives.
  • Update the schedule with progress tracking and ensure earned progress in the scorecard aligns with schedule updates; understand earning rules and scorecard integration.
  • Determine schedule quality using Acumen Fuse and resolve any shortcomings.
  • Conduct schedule risk analysis using Primavera Risk Analysis (PRA) software (asset).
  • Assess schedule impacts during the change management process and modify the schedule accordingly.
  • Organize Inter‑Active Planning (IAP) sessions throughout the project life‑cycle.
  • Coordinate with workface planning groups to ensure proper package decomposition.
  • Monitor milestones, notify the team of variances, and initiate mitigation; assess impacts during change management and modify the schedule.
  • Coordinate with contractors and vendors in developing and managing their schedules, including schedule interface process.
  • Organize required schedule reviews with project personnel.
  • Assist project controls specialists in updating systems and applying progress to the live schedule.
  • Apply contractor and vendor progress to the live schedule; perform it if they cannot.
  • Position schedule data as the source for all time‑phased needs (cashflow, commodities, resourcing, etc.).
  • Create and maintain various schedule views and layouts (90‑day look‑ahead, 3‑week look‑ahead, critical path, etc.).
  • Coordinate with phase leads on all schedule updates, ensuring ad‑hoc (MS Project or Excel) schedules align with the master schedule.
  • Review variance analysis with stakeholders after each schedule update and incorporate findings into reporting narratives.
  • Assist Project Controls in developing skyline charts for EWP IFC, module assembly, system walk‑downs, and turnover.
  • Maintain reporting views based on schedule data, including Power BI reports.
  • Incorporate approved changes and analyze impact on the critical path.
  • Provide feedback to key stakeholders on overall project status, including:
    • Critical Path Analysis.
    • Resource Forecasting / Histogram Preparation.
    • Forecast to Project Controls for report generation.
    • Information for internal and external reporting.
What you will…
Position Requirements
10+ Years work experience
Note that applications are not being accepted from your jurisdiction for this job currently via this jobsite. Candidate preferences are the decision of the Employer or Recruiting Agent, and are controlled by them alone.
To Search, View & Apply for jobs on this site that accept applications from your location or country, tap here to make a Search:
 
 
 
Search for further Jobs Here:
(Try combinations for better Results! Or enter less keywords for broader Results)
Location
Increase/decrease your Search Radius (miles)
0
200
Filters
Education Level
Experience Level (years)
Posted in last:
Salary