Construction Manager (Substation & Transmission
Listed on 2026-08-07
-
Engineering
-
Construction
Construction Manager (Substation & Transmission)
Responsible for coordinating and managing construction work performed by contractors and/or vendors at the project site. Responsible to assess productivity, schedule compliance, work quality, and safety performance on the project. Responsible to manage walk downs of planned work, validate acceptance of completed work to design requirements, approve contractor payment requests, verify constructability, ensure proper resource allocations, assess field status, and resolve issues as needed.
Responsible for scope control, budget oversight, performance reporting, schedules, and work in progress to ensure Construction Supervisors are effectively implementing their assignments and obtaining the desired results. Provides leadership and coaching to Construction Supervisors and supplemental workforce, communicating departmental, station, and division goals and validating each performer's ability to impact those goals. Acts as a critical bridge between field operations and customer leadership, ensuring construction crews and project stakeholders remain aligned.
Addresses logistical challenges, resolves conflicts, and ensures construction activities stay on track. Survey and observe contractor Safety, Health, and Environment (SHE) practices; provide coaching, direction and corrective action as needed.
Associate degree or Bachelor's degree in Engineering, Power Generation, or a related field (or equivalent experience).
Relevant Experience11 - 15 years of experience in power plant commissioning, working with EPC Contractors, engineering firms, and equipment suppliers.
Responsibilities- Oversee large-scale commissioning efforts, including project scope and risk management.
- Manage multi-disciplinary teams, ensuring technical and operational excellence.
- Develop and implement commissioning strategies to optimize plant performance.
- Lead complex negotiations with EPC contractors and regulatory agencies.
- Conduct high-level project assessments to drive process improvements.
Strong understanding of engineering principles related to power plant commissioning.
Enable Skills-Based Hiring
- No
Furlough Notification
- All Next Era Energy Contingent Workforce Program (CWP) assignments are eligible for worker furlough. Typical furlough schedules coincide with select national holidays, but may be subject to change. Suppliers will be notified by the CWP of those workers impacted and the applicable furlough dates prior to each furlough period.
Worker Building Location - JB
- Juno Beach Office -
Will driving be required as part of position duties/work? - Yes
Driving Record Validation
- For all positions indicating driving requirements, supplier must hold validation of non-restricted current driver''s license and demonstrate the following: no alcohol/drug related driving offenses within the previous five years and/or the license is not currently suspended or restricted related to hours of driving or reason for driving.
Will Per Diem and Mob/De-Mob expense types be available for this requisition? - Yes
If Per Diem is available, please indicate the maximum amount:
- gsa
Nuclear workers requiring unescorted badge access will follow onsite in-processing procedures. All others will be required to complete Non-Nuclear pre-assignment screenings through their staffing supplier. Please contact CWP with any questions: or .
Shift Type
- Standard Shift (8-5)
Hours per Day - 8
Hours per Week - 40
Total Hours - 1,952.00
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).