×
Register Here to Apply for Jobs or Post Jobs. X

A​/E Services Honeycutt & White and Parker Intersection Imp

Job in Maricopa, Pinal County, Arizona, 85239, USA
Listing for: Maricopa Az
Full Time position
Listed on 2026-06-05
Job specializations:
  • Engineering
    Civil Engineering, Engineering Design & Technologists, Aerospace / Aviation / Avionics, Safety Engineer
Salary/Wage Range or Industry Benchmark: 60000 USD Yearly USD 60000.00 YEAR
Job Description & How to Apply Below
Position: A/E Services for Honeycutt & White and Parker Intersection Imp
Location: Maricopa

Project Overview

The City of Maricopa is seeking a firm to provide Architect/Engineering (A/E) services for a Construction Manager at Risk (CM@R) project at the intersection of Honeycutt Road and White & Parker Roads. The project includes widening Honeycutt Road from a two‑lane to a four‑lane roadway through the intersection, expanding White & Parker Roads through the intersection, relocating the traffic signal, designing street lighting, realigning the existing MSIDD drainage channel, relocating and/or widening the box culvert on the east side of the intersection, relocating and/or undergrounding MSIDD laterals, and handling the ED3 Power Lines.

Coordination with WAPA power lines will be required.

Scope of Work

The work will begin with a Project Assessment (PA) that presents two concept options at the 15% design stage along with an engineer’s estimate for each concept. The City will review and direct the A/E team on which concept to advance to the 30% design stage, including an engineer’s estimate and final PA. Depending on construction funds, the A/E will continue design services through 60%, 90%, and 100% sealed construction documents, which will include submittal review, conflict resolution, and record drawings.

Deliverables

Deliverables must conform to the City of Maricopa Engineering Design Standards Manual and Design Standards Appendix. Deliverables include plans submitted to the Development Services Department for review and permitting conformance, lead design progress meetings, and coordination with the City’s Project Manager, city staff, and third‑party utilities as required.

Design Schedule

The design duration for the PA is eight (8) months from Notice to Proceed (NTP). Upon issuance of NTP for 100% construction documents, the design duration is ten (10) months.

#J-18808-Ljbffr
To View & Apply for jobs on this site that accept applications from your location or country, tap the button below to make a Search.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
 
 
 
Search for further Jobs Here:
(Try combinations for better Results! Or enter less keywords for broader Results)
Location
Increase/decrease your Search Radius (miles)
0
200
Filters
Education Level
Experience Level (years)
Posted in last:
Salary