Estimator, Engineering
Job in
Chantilly, Fairfax County, Virginia, 22021, USA
Listed on 2026-02-16
Listing for:
MEI Industrial Solutions
Per diem
position Listed on 2026-02-16
Job specializations:
-
Engineering
Job Description & How to Apply Below
Project Estimator – Rigging (Data Centers, Pharma, Semiconductor)
Role Summary
Own the rigging portion of complex industrial/commercial bids. Mine 1,000+ page RFPs/specs/drawings to isolate the rigging scope, quantify labor/equipment/duration, and deliver complete, defensible bid packages that operations can build and finance can trust.
Core Responsibilities- Scope Extraction & Clarification
- Parse RFPs/specs/drawings (Div 01/05/11/13/14/40–46, appendices, vendor cut sheets) to isolate rigging scope: receiving, uncrating, hoisting, setting, anchoring, alignment, cleanroom/contamination controls, turnover.
- Build and track RFIs; resolve conflicting notes between architectural, structural, MEP, process, and tool/vendor sets.
- Quantity Takeoff & Means/Methods
- Perform detailed takeoffs: weights/CGs, travel paths, floor loading, pick radii, lift heights, access constraints, rigging gear lists, temporary works.
- Select feasible means/methods: cranes vs. gantry vs. Versa‑Lift/forklift vs. skates/hydraulic jacks; develop alternate approaches when logistics or vibration limits demand it.
- Pricing & Production
- Calculate crew compositions and man‑hours by activity (receive, stage, rig, set, align, anchor, clean, turnover).
- Price owned equipment vs. rental (cranes, gantries, forklifts/Versa‑Lifts, dollies/skates, hydraulic power packs, spreader bars, specialty rigging).
- Apply correct wage rates, fringes, OT rules, per diem, travel, mobilization/demob, consumables, small tools, waste, and escalation.
- Schedule & Logistics
- Build level‑2/3 rigging schedules with durations, constraints, and float; coordinate around tool install, shutdowns, and blackout dates.
- Plan site logistics: laydown, ingress/egress, rigging routes, floor protection, housekeeping, crane setups, lift sequencing, after‑hours work.
- Risk & Compliance
- Identify risk items (weight/sling capacity margins, floor loads, vibration limits, contamination control, lift plan approvals, shutdown windows) with mitigation and cost.
- Include safety planning assumptions (JHAs, lift plans, permits), cleanroom protocols (gowning, wipe‑downs, bag‑in/bag‑out), and GMP/validation touchpoints where applicable.
- Sub/vendor Management
- Solicit, level, and lock quotes for crane service, specialty transport, engineered picks/temporary works, anchors/epoxy, rigging gear rental, and disposal.
- Bid Package Assembly
- Produce complete bid deliverables and present at internal reviews; hand off to Operations with clear assumptions and alternates.
- Post‑Bid Support
- Respond to clarifications, VE options, and negotiate scope. Upon award, support turnover and early buyout.
- 5+ years in industrial/commercial rigging estimating or heavy‑mech/tool install (data center/pharma/semiconductor preferred).
- Strong blueprint/spec literacy (general, structural, MEP, process/tool drawings; lift plans; vendor prints; P&IDs/GA helpful).
- Proven ability to model picks, floor loads, and lift paths; practical understanding of cranes, gantries, Versa‑Lifts, jacking/skating systems.
- Advanced Excel (production rates, para metrics, sensitivity), Bluebeam Revu (takeoff), scheduling (MS Project or P6).
- Experience leveling vendor/sub quotes and writing scope clarifications/exceptions.
- Safety‑first mindset; working knowledge of OSHA/ASME B30 rigging standards; cleanroom/GMP basics for pharma/semi.
- Clear written and verbal communication; able to defend a number.
- NCCCO Signal person/Rigger (or equivalent), OSHA‑30, TWIC (as needed), 3D lift planning (AutoCAD/Revit/3D Lift Plan), anchor/epoxy installer cards.
- Estimate Accuracy: ±10–15% variance estimate‑to‑actual labor/equipment on closed projects.
- Hit Rate & Throughput:
Qualified bids submitted vs. awards; on‑time submission rate. - RFI Efficiency:
Avg. days to resolve critical scope RFIs; % of bids with unresolved criticals at submission (target: 0%). - Schedule Reality: % of operations feedback indicating durations were buildable without re‑baselining.
- Risk Capture: # of material risk items identified vs. realized.
- Bluebeam Revu, Excel (power user), MS Project or P6, 3D Lift Plan/AutoCAD (or…
To View & Apply for jobs on this site that accept applications from your location or country, tap the button below to make a Search.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
Search for further Jobs Here:
×