×
Register Here to Apply for Jobs or Post Jobs. X

Production Planner

Job in Clovis, Fresno County, California, 93613, USA
Listing for: Wawona Frozen Foods, Inc.
Full Time position
Listed on 2026-09-27
Job specializations:
  • Manufacturing / Production
    Manufacturing & Industrial Operations, Food Production, Production Manager
Salary/Wage Range or Industry Benchmark: 65000 - 90000 USD Yearly USD 65000.00 90000.00 YEAR
Job Description & How to Apply Below

Production Planner

Wawona Frozen Foods
· Fresno, CA
· On-site
· Full-time, [Exempt]
· Planning Department

Turn the demand plan into the schedule that runs our operation, and be the person who keeps every line staged, set up, and running.

About Wawona Frozen Foods

Wawona Frozen Foods is a family-owned company and the leading U.S. processor of frozen peaches. We pack roughly 90 million pounds of peaches and other fruit each year in the heart of the San Joaquin Valley.

For more than five decades, the Smittcamp family has grown, packed, and shipped fruit to the nation's largest club and grocery retailers, school nutrition programs, food service distributors, and food and beverage manufacturers. Our state-of-the-art production methods and facilities deliver consistent, high-quality products while meeting the highest food safety standards required by the USDA and state regulators.

Our vision is simple: a family business putting a Wawona fruit in every freezer, fruit cup, and smoothie in America.

About This Role

The Production Planner turns the demand plan into an executable production schedule. You'll schedule production, guide labor planning, coordinate materials, and direct raw material moves so every line is staged and ready to run.

You'll build and manage the schedule in Microsoft Dynamics 365 Business Central. You'll own production-side readiness for BOMs, specifications, and Released Production Order (RPO) setup, and track the metrics that drive line efficiency, run time, and utilization.

You are the gatekeeper for every schedule addition, change, and substitution. Nothing reaches the floor until you have reviewed its impact on capacity, labor, materials, cost, food safety, and customers.

We're looking for someone who is highly collaborative, has a bias for action, and makes data-driven decisions using Business Central, Power BI, and Excel automation.

What You'll Do

Production scheduling

  • Convert the Demand Planner's demand plan into a feasible production schedule by line, shift, and day.
  • Build, maintain, and publish the schedule in the Business Central Planning Worksheet.
  • Sequence runs to minimize changeovers and downtime while meeting service levels, inventory targets, and sanitation and allergen requirements.
  • Maintain a rolling look-ahead and communicate changes promptly to Operations, Warehouse, Quality, and Supply Planning.
  • Track schedules against actuals, and monitor co-packer and customer contract commitments.

Gatekeeper for additions, changes, and substitutions

  • Serve as the single point of control for all schedule changes and material or packaging substitutions.
  • Evaluate each request for impact on capacity, labor, materials, cost, food safety, and customer commitments before approval.
  • Confirm substitutions are approved by Quality and reflected in the BOM and production order before release.
  • Document changes and communicate decisions to all affected teams.

Labor scheduling guidance

To View & Apply for jobs on this site that accept applications from your location or country, tap the button below to make a Search.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
 
 
 
Search for further Jobs Here:
(Try combinations for better Results! Or enter less keywords for broader Results)
Location
Increase/decrease your Search Radius (miles)
0
200
Filters
Education Level
Experience Level (years)
Posted in last:
Salary